[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107740":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1107740,783,1,"单选题","项目编码是分部分项工程量清单项目名称的数字标示，其中（ ）是分部工程顺序码。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","三至四位",false,{"key":16,"text":17,"correct":18},"B","五至六位",true,{"key":20,"text":21,"correct":14},"C","七.八.九位",{"key":23,"text":24,"correct":14},"D","十至十二位","考点:工程量清单编制。项目编码是分部分项工程量清单项目名称的数字标识。在十二位数字中，一至二位为专业工程码；三至四位为附录分类顺序码；五至六位为分部工程顺序码；七、八、九位为分项工程项目名称顺序码；十至十二位为清单项目名称顺序码。参见教材P131。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]