[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107718":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1107718,783,1,"单选题","根据《建设工程工程量清单计价规范》（GB 50500-2013）的规定，下列属于业主向承包商索赔的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工程变更引起的索赔",false,{"key":16,"text":17,"correct":14},"B","加速施工费用的索赔",{"key":19,"text":20,"correct":21},"C","承包商不正当地放弃工程的索赔",true,{"key":23,"text":24,"correct":14},"D","发包人不正当地中止工程而引起的索赔","考点:索赔的主要类型。发包人向承包人的索赔包括：（1）工期延误索赔。（2）质量不满足合同要求索赔。（3）承包人不履行的保险费用索赔。（4）对超额利润的索赔。（5）发包人合理地终止合同或承包人不正当放弃工程的索赔。选项D，属于承包人向发包人的索赔。参见教材P183。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]