[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107689":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1107689,783,1,"单选题","下列引起费用增加的事项中，属于现场签证范围的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工合同范围以外的零星工程",true,{"key":16,"text":17,"correct":18},"B","承包人原因导致的人工.设备窝工",false,{"key":20,"text":21,"correct":18},"C","纠正施工方案错误引起的费用",{"key":23,"text":24,"correct":18},"D","质量问题返工的工程量","考点:现场签证。现场签证的范围一般包括：（1）适用于施工合同范围以外零星工程的确认；（2）在工程施工过程中发生变更后需要现场确认的工程量；（3）非承包人原因导致的人工、设备窝工及有关损失；（4）符合施工合同规定的非承包人原因引起的工程量或费用增减；（5）确认修改施工方案引起的工程量或费用增减；（6）工程变更导致的工程施工措施费增减等。参见教材P190。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]