[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107666":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1107666,783,1,"单选题","关于单价合同中工程量计算的说法，正确的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","单价合同应予计量的工程量是承包人实际施工的工程量",false,{"key":16,"text":17,"correct":14},"B","承包人因自身原因造成返工的工程量应予计量",{"key":19,"text":20,"correct":21},"C","工程计量应以设计图纸为依据",true,{"key":23,"text":24,"correct":14},"D","承包人为保证工程质量超过图纸要求的工程量应予计量","考点:工程计量的原则。监理工程师对承包人超出设计图纸要求增加的工程量和自身原因造成返工的工程量，不予计量。参见教材P160。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]