[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107604":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1107604,783,1,"单选题","在建设工程过程中，进行投资控制的目的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","确保投资目标的实现",true,{"key":16,"text":17,"correct":18},"B","减少计划投资",false,{"key":20,"text":21,"correct":18},"C","提前竣工",{"key":23,"text":24,"correct":18},"D","中标价低于标底价","考点:资金使用计划的编制。投资控制的目的是为了确保投资目标的实现。参见教材P155。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]