[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107571":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1107571,783,1,"单选题","建设行政主管部门或者其他有关部门发现建设单位在竣工验收过程中有违反国家有关建设工程质量管理规定行为的，责令（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","重新施工",false,{"key":16,"text":17,"correct":14},"B","重新备案",{"key":19,"text":20,"correct":21},"C","停止使用",true,{"key":23,"text":24,"correct":14},"D","重新绘制施工图纸","考点:工程质量管理主要制度。建设行政主管部门或者其他有关部门发现建设单位在竣工验收过程中有违反国家有关建设工程质量管理规定行为的，责令停止使用。参见教材P7",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]