[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107515":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1107515,783,1,"单选题","由于保修工作千差万别，（ ）应根据具体项目的工作量决定保修期间的具体工作计划，并根据相关合同约定具体决定工作方式和资料留存。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","建设单位",false,{"key":16,"text":17,"correct":14},"B","设计单位",{"key":19,"text":20,"correct":14},"C","施工单位",{"key":22,"text":23,"correct":24},"D","监理单位",true,"考点:工程保修阶段的主要工作。由于保修工作千差万别，监理单位应根据具体项目的工作量决定保修期间的具体工作计划，并根据与建设单位的合同约定具体决定工作方式和资料留存。参见教材P185。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]