[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-782-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":604},{"id":5,"name":6,"category":7,"favorite":8},782,"目标控制（水利工程）","建筑工程",0,9,50,775,[13,34,46,58,70,82,90,102,114,126,138,150,162,174,186,198,210,222,234,246,258,270,282,294,306,318,330,342,354,366,378,390,402,414,426,438,450,462,474,486,498,510,522,533,545,555,567,575,583,592],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1106803,1,"单选题","关于进度偏差和投资偏差，下列说法中正确的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","进度偏差为正值时，表示进度提前",false,{"key":24,"text":25,"correct":22},"B","进度偏差为负值时，表示进度拖延",{"key":27,"text":28,"correct":29},"C","投资偏差为正值时，表示投资增加",true,{"key":31,"text":32,"correct":22},"D","投资偏差为正值时，表示投资节约","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1106804,"某工程项目合同规定，因人工、材料等价格波动影响合同价时，采用公式 计算差额，调整合同价格。规定定值权重A＝0.15，可调值因子有人工费、水泥、钢材和混凝土，其变值权重分别为0.2、0.1、0.25和0.3。各可调值因子的基本价格指数均为100。工程进展到某月结算时，该月完成合同金额100万元，无其他应扣或应支付款额，各可调值因子的现行价格指数是：人工费110，水泥105，钢材106，混凝土108，则按合同规定该月应调整的价格差额为（ ）万元。",[38,40,42,44],{"key":20,"text":39,"correct":22},"5.9",{"key":24,"text":41,"correct":29},"6.4",{"key":27,"text":43,"correct":22},"8.6",{"key":31,"text":45,"correct":22},"13.7",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1106805,"下列各项中，不是按施工图纸所示施工轮廓尺寸或结构物尺寸计算的有效面积以m2为单位计量的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":29},"沥青混凝土面板和沥青混凝土心墙",{"key":24,"text":53,"correct":22},"钢筋混凝土防渗墙",{"key":27,"text":55,"correct":22},"回填灌浆、接缝灌浆和接触灌浆",{"key":31,"text":57,"correct":22},"高压喷射灌浆防渗墙",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1106806,"待摊投资的分摊对象不包括（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"房屋、建筑物",{"key":24,"text":65,"correct":22},"需要安装的通用设备",{"key":27,"text":67,"correct":29},"需要安装的专用设备",{"key":31,"text":69,"correct":22},"水、电专用设备",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1106807,"水利基本建设项目竣工财务决算由（ ）组织编制。",[74,76,78,80],{"key":20,"text":75,"correct":29},"项目法人",{"key":24,"text":77,"correct":22},"设计单位",{"key":27,"text":79,"correct":22},"施工单位",{"key":31,"text":81,"correct":22},"监理单位",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1106808,"水利工程基本建设项目竣工财务决算应由（ ）编制。",[86,87,88,89],{"key":20,"text":75,"correct":29},{"key":24,"text":77,"correct":22},{"key":27,"text":81,"correct":22},{"key":31,"text":79,"correct":22},{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":27,"analysis":33},1106809,"关于竣工财务决算编制，下列说法中正确的是（ ）。",[94,96,98,100],{"key":20,"text":95,"correct":22},"大中型项目的竣工财务决算编制工作，项目法人应在1个月内完成",{"key":24,"text":97,"correct":22},"设计文件未明确项目规模的，经营性项目投资额≥3000万元的属于大中型项目",{"key":27,"text":99,"correct":29},"建设项目是大中型项目而单项工程是小型项目的，单项工程的竣工财务决算应按大中型项目的编制要求编制",{"key":31,"text":101,"correct":22},"未完工程投资及预留费用不可预计纳入竣工财务决算",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":27,"analysis":33},1106810,"项目后评价报告的主要内容不包括（ ）。",[106,108,110,112],{"key":20,"text":107,"correct":22},"过程评价",{"key":24,"text":109,"correct":22},"社会影响评价",{"key":27,"text":111,"correct":29},"项目投资评价",{"key":31,"text":113,"correct":22},"经济评价",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":27,"analysis":33},1106811,"利用横道图表示工程进度计划的主要特点是（ ）。",[118,120,122,124],{"key":20,"text":119,"correct":22},"能够反映工作所具有的机动时间",{"key":24,"text":121,"correct":22},"能够明确表达各项工作之间的逻辑关系",{"key":27,"text":123,"correct":29},"形象直观，易于编制和理解",{"key":31,"text":125,"correct":22},"能方便地利用计算机进行计算和优化",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":31,"analysis":33},1106812,"发包人的总体控制性进度计划主要包括工程项目建设总进度计划和（ ）。",[130,132,134,136],{"key":20,"text":131,"correct":22},"设计单位实施进度计划",{"key":24,"text":133,"correct":22},"承包人实施进度计划",{"key":27,"text":135,"correct":22},"设备采购单位实施进度计划",{"key":31,"text":137,"correct":29},"工程项目年度进度计划",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":31,"analysis":33},1106813,"下列选项不属于项目法人在进度控制中的职责与权力的是（ ）。",[142,144,146,148],{"key":20,"text":143,"correct":22},"确定建设工期目标",{"key":24,"text":145,"correct":22},"分解.确定进度里程碑目标",{"key":27,"text":147,"correct":22},"按照资金使用计划编制并落实建设资金筹措计划",{"key":31,"text":149,"correct":29},"签发开工通知",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":27,"analysis":33},1106814,"下列关于横道图表示建设工程进度计划的特点说法不正确的是（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"能够明确表示各项工作的开始时间",{"key":24,"text":157,"correct":22},"一目了然.易于理解",{"key":27,"text":159,"correct":29},"能够反映各项工作之间的相互关系",{"key":31,"text":161,"correct":22},"不能反映各项工作的机动时间",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":31,"analysis":33},1106815,"下列工程进度曲线表示的是（ ）曲线。",[166,168,170,172],{"key":20,"text":167,"correct":22},"累计完成量",{"key":24,"text":169,"correct":22},"每天完成工程量",{"key":27,"text":171,"correct":22},"每天完成相同数量的施工进度",{"key":31,"text":173,"correct":29},"每天完成不同数量的施工进度",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":27,"analysis":33},1106816,"对于一些复杂的工程缺陷，在做出决定前，可采取一些方法做进一步的研究，这些方法不包括（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":22},"试验验证",{"key":24,"text":181,"correct":22},"定期观测",{"key":27,"text":183,"correct":29},"抽样检验",{"key":31,"text":185,"correct":22},"专家论证",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":31,"analysis":33},1106817,"工程质量等级评定分为合格和不合格，工程质量评分值大于或等于______分的为合格，小于______分的为不合格。（ ）",[190,192,194,196],{"key":20,"text":191,"correct":22},"60分；60分",{"key":24,"text":193,"correct":22},"65分；65分",{"key":27,"text":195,"correct":22},"70分；70分",{"key":31,"text":197,"correct":29},"75分；75分",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":27,"analysis":33},1106818,"下列关于分包的条款，说法错误的是（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":22},"承包人不能将整个工程分包出去",{"key":24,"text":205,"correct":22},"除合同另有约定外，无监理工程师的同意不能将任何工程部分分包出去",{"key":27,"text":207,"correct":29},"承包人对发包人负责，承包人不能因分包而解除或减少合同约定的任何义务或责任",{"key":31,"text":209,"correct":22},"劳务供应协议和材料采购合同不属于分包",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":24,"analysis":33},1106819,"下列选项中，用横道图表示建设工程进度计划的优点的是（ ）。",[214,216,218,220],{"key":20,"text":215,"correct":22},"明确地反映出影响工期的关键工作和关键路线",{"key":24,"text":217,"correct":29},"能明确地表示出各项工作的开始时间、结束时间和持续时间",{"key":27,"text":219,"correct":22},"反映出各项工作所具有的机动时间",{"key":31,"text":221,"correct":22},"明确地反映出各项工作之间的相互关系",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":24,"analysis":33},1106820,"下列选项中不属于质量体系审核范围的有（ ）。",[226,228,230,232],{"key":20,"text":227,"correct":22},"组织机构",{"key":24,"text":229,"correct":29},"项目资金",{"key":27,"text":231,"correct":22},"管理和工作程序",{"key":31,"text":233,"correct":22},"制定符合规范和标准的程度",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":31,"analysis":33},1106821,"项目管理过程按照过程组进行分类，分为启动、规划、执行、监控和（ ）五个项目管理过程组。",[238,240,242,244],{"key":20,"text":239,"correct":22},"质量管理",{"key":24,"text":241,"correct":22},"评价",{"key":27,"text":243,"correct":22},"分析",{"key":31,"text":245,"correct":29},"收尾",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":31,"analysis":33},1106822,"与以往的内部管理体制相比，工程监理制度的最大特点是（ ）。",[250,252,254,256],{"key":20,"text":251,"correct":22},"监理工程师对工程质量的监理权受法律保护",{"key":24,"text":253,"correct":22},"监理工程师对工程施工质量实施的监督管理及咨询服务活动",{"key":27,"text":255,"correct":22},"工程质量监理强调事先监理和主动监理",{"key":31,"text":257,"correct":29},"质量好坏直接影响到承包人的经济效益",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":24,"analysis":33},1106823,"双代号网络图中虚工作的特征是（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"不消耗时间，但消耗资源",{"key":24,"text":265,"correct":29},"不消耗时间，也不消耗资源",{"key":27,"text":267,"correct":22},"只消耗时间，不消耗资源",{"key":31,"text":269,"correct":22},"既消耗时间，也消耗资源",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":24,"analysis":33},1106824,"在某工程单代号搭接网络计划中，关键线路是指（ ）的线路。",[274,276,278,280],{"key":20,"text":275,"correct":22},"相邻两项工作之间的时距之和最大",{"key":24,"text":277,"correct":29},"相邻两项工作之间的时间间隔全部为零",{"key":27,"text":279,"correct":22},"工作的持续时间总和最大",{"key":31,"text":281,"correct":22},"相邻两项工作之间的时距全部为零",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":24,"analysis":33},1106825,"某工作最短估计时间是5 天,最长估计时间是10 天,最可能估计时间是6 天。根据三时估算法,该工作的持续时间是( )天。",[286,288,290,292],{"key":20,"text":287,"correct":22},"6.25",{"key":24,"text":289,"correct":29},"6.5",{"key":27,"text":291,"correct":22},"6.75",{"key":31,"text":293,"correct":22},"7",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":20,"analysis":33},1106826,"某工程网络计划中，工作M 的持续时间为4 天，工作M 的三项紧后工作的最迟开始时间分别为第21 天、第18 天和第15 天，则工作M 的最迟开始时间是第（ ）天。",[298,300,302,304],{"key":20,"text":299,"correct":29},"11",{"key":24,"text":301,"correct":22},"14",{"key":27,"text":303,"correct":22},"15",{"key":31,"text":305,"correct":22},"17",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":31,"analysis":33},1106827,"经济净现值是指将项目在整个计算期内各年（ ）用社会折现率折算到建设期初的现值之和。",[310,312,314,316],{"key":20,"text":311,"correct":22},"现金流量",{"key":24,"text":313,"correct":22},"效益流量",{"key":27,"text":315,"correct":22},"净现金流量",{"key":31,"text":317,"correct":29},"经济净效益流量",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":20,"analysis":33},1106828,"财务评价和国民经济评价的不相同之处不包括（ ）。",[322,324,326,328],{"key":20,"text":323,"correct":29},"评价目的",{"key":24,"text":325,"correct":22},"评价参数",{"key":27,"text":327,"correct":22},"评价角度",{"key":31,"text":329,"correct":22},"评价采用的价格",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},1106829,"下图双代号网络图中属于B工作的紧后工作的是（ ）。",[334,336,338,340],{"key":20,"text":335,"correct":22},"工作A",{"key":24,"text":337,"correct":29},"工作C",{"key":27,"text":339,"correct":22},"工作G",{"key":31,"text":341,"correct":22},"工作D",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},1106830,"绘制网络图的布图形式不包括（ ）。",[346,348,350,352],{"key":20,"text":347,"correct":22},"水平式",{"key":24,"text":349,"correct":29},"垂直式",{"key":27,"text":351,"correct":22},"对称式",{"key":31,"text":353,"correct":22},"桁构式",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":31,"analysis":33},1106831,"某单代号网络图，有多项开始工作和结束工作，则该网络图（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":22},"起点节点为实工作，终点节点为实工作",{"key":24,"text":361,"correct":22},"起点节点为实工作，终点节点为虚拟工作",{"key":27,"text":363,"correct":22},"起点节点为虚拟工作，终点节点为实工作",{"key":31,"text":365,"correct":29},"起点节点为虚拟工作，终点节点为虚拟工作",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":27,"analysis":33},1106832,"工程网络图的绘制原则，错误的是（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"单代号网络图的绘制比双代号网络图的绘制容易",{"key":24,"text":373,"correct":22},"网络图中所有节点都必须有编号",{"key":27,"text":375,"correct":29},"双代号网络图中的节点只能用圆圈表示",{"key":31,"text":377,"correct":22},"单代号网络图中的节点可以用圆圈或矩形表示",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":31,"analysis":33},1106833,"双代号网络图中节点是指网络图中箭线端部的圆圈或其他形状的封闭图形，下列说法错误的是（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":22},"节点不消耗时间也不消耗资源",{"key":24,"text":385,"correct":22},"第一个节点称为起点节点",{"key":27,"text":387,"correct":22},"最后一个节点称为终点节点",{"key":31,"text":389,"correct":29},"终点节点只有向外工作，没有向内工作",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":20,"analysis":33},1106834,"双代号网络图以（ ）表示工作。",[394,396,398,400],{"key":20,"text":395,"correct":29},"箭线及其两端节点的编号",{"key":24,"text":397,"correct":22},"两端节点的编号",{"key":27,"text":399,"correct":22},"箭线",{"key":31,"text":401,"correct":22},"箭线或其两端节点的编号",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":24,"analysis":33},1106835,"在计算双代号网络计划的时间参数时，工作的最早开始时间应为其所有紧前工作（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":22},"最早完成时间的最小值",{"key":24,"text":409,"correct":29},"最早完成时间的最大值",{"key":27,"text":411,"correct":22},"最迟完成时间的最小值",{"key":31,"text":413,"correct":22},"最迟完成时间的最大值",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":24,"analysis":33},1106836,"下列关于时标网络计划的间接绘制法的说法，错误的是（ ）。",[418,420,422,424],{"key":20,"text":419,"correct":22},"需要先根据无时标的网络计划草图计算各节点的最早时间",{"key":24,"text":421,"correct":29},"在绘制时应先将所有节点按其最迟时间定位在时标网络计划表中的相应位置",{"key":27,"text":423,"correct":22},"当某些工作箭线的长度不足以到达该工作的完成节点时，须用波形线补足",{"key":31,"text":425,"correct":22},"自左至右确定各节点的位置",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":20,"analysis":33},1106837,"某工程双代号时标网络计划如下图所示，其中工作C的总时差为（ ）周。",[430,432,434,436],{"key":20,"text":431,"correct":29},"1",{"key":24,"text":433,"correct":22},"2",{"key":27,"text":435,"correct":22},"3",{"key":31,"text":437,"correct":22},"4",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":20,"analysis":33},1106838,"某工程双代号时标网络计划如下图所示，其中工作B的总时差和自由时差（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":29},"均为2周",{"key":24,"text":445,"correct":22},"分别为2周和3周",{"key":27,"text":447,"correct":22},"均为3周",{"key":31,"text":449,"correct":22},"分别为3周和2周",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":27,"analysis":33},1106839,"由于某原因规定了某项工作不得早于某时刻开始，这类网络计划属于（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":22},"双代号网络计划",{"key":24,"text":457,"correct":22},"双代号搭接网络计划",{"key":27,"text":459,"correct":29},"有时限的网络计划",{"key":31,"text":461,"correct":22},"单代号网络计划",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},1106840,"下列关于有限网络计划计算原则错误的是（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":22},"工作的强制最迟完成时限对工作的最早时间计算没有影响",{"key":24,"text":469,"correct":29},"计划工期要同时满足工期和时限的要求并取其中的大值",{"key":27,"text":471,"correct":22},"工作的强制最早开始时限对工作的最迟时间工作没有影响",{"key":31,"text":473,"correct":22},"工作的总时差计算与普通网络图中的计算相同",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":27,"analysis":33},1106841,"某分部工程由 A、B工作组成，其中A工作结束4天后，B工作才能开始，则 A、B工作之间的搭接关系是（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":22},"从开始到结束",{"key":24,"text":481,"correct":22},"从结束到结束",{"key":27,"text":483,"correct":29},"从结束到开始",{"key":31,"text":485,"correct":22},"从开始到开始",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":20,"analysis":33},1106842,"计划评审技术中工作的持续时间可以利用三点估算法进行，下列不属于三点估算法估计完成时间的是（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":29},"客观估计时间",{"key":24,"text":493,"correct":22},"最可能估计时间",{"key":27,"text":495,"correct":22},"乐观估计时间",{"key":31,"text":497,"correct":22},"悲观估计时间",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":27,"analysis":33},1106843,"A工作后有紧后工作 B、 C，它们的持续时间分别为5d、4d和6d；BC工作最迟完成时间分别为25d和23d，则A工作的最迟开始时间为（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":22},"4d",{"key":24,"text":505,"correct":22},"8d",{"key":27,"text":507,"correct":29},"12d",{"key":31,"text":509,"correct":22},"16d",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":31,"analysis":33},1106844,"在某工程双代号网络计划中，工作N的最早开始时间和最迟开始时间分别为第20天和第25天，其持续时间为9天。该工作有两项紧后工作，它们的最早开始时间分别为第32天和第34天，则工作N的总时差和自由时差分别为（ ）天。",[514,516,518,520],{"key":20,"text":515,"correct":22},"3和0",{"key":24,"text":517,"correct":22},"3和2",{"key":27,"text":519,"correct":22},"5和0",{"key":31,"text":521,"correct":29},"5和3",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":27,"analysis":33},1106845,"某工程单代号网络计划如下图所示，工作E的最早开始时间是（ ）。",[526,528,530,531],{"key":20,"text":527,"correct":22},"10",{"key":24,"text":529,"correct":22},"13",{"key":27,"text":305,"correct":29},{"key":31,"text":532,"correct":22},"27",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":27,"analysis":33},1106846,"在单代号网络计划中，关键线路是指（ ）的线路。",[537,539,541,543],{"key":20,"text":538,"correct":22},"各项工作持续时间之和最小",{"key":24,"text":540,"correct":22},"由关键工作组成",{"key":27,"text":542,"correct":29},"相邻两项工作之间时间间隔均为零",{"key":31,"text":544,"correct":22},"各项工作自由时差均为零",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":20,"analysis":33},1106847,"在双代号网络计划的时间参数计算中，除以网络计划终点节点为完成节点的工作外，其他工作的最迟完成时间应等于其紧后工作（ ）。",[549,551,553,554],{"key":20,"text":550,"correct":29},"最迟开始时间的最小值",{"key":24,"text":552,"correct":22},"最迟开始时间的最大值",{"key":27,"text":411,"correct":22},{"key":31,"text":413,"correct":22},{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":27,"analysis":33},1106848,"某建设工程施工进度计划如下图所示（时间单位：天），则该计划的计算工期是（ ）天。",[559,561,563,565],{"key":20,"text":560,"correct":22},"20",{"key":24,"text":562,"correct":22},"21",{"key":27,"text":564,"correct":29},"23",{"key":31,"text":566,"correct":22},"25",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":20,"analysis":33},1106849,"在工程网络计划中，H工作的最早开始时间为第15天，其持续时间为4天，该工作有3项紧后工作，它们的最早开始时间分别为第20天、第22天，第24天，则H工作的自由时差为（ ）天。",[571,572,573,574],{"key":20,"text":431,"correct":29},{"key":24,"text":433,"correct":22},{"key":27,"text":435,"correct":22},{"key":31,"text":437,"correct":22},{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":20,"analysis":33},1106850,"某工程双代号网络计划如下图所示，其中关键线路有（ ）条",[579,580,581,582],{"key":20,"text":431,"correct":29},{"key":24,"text":433,"correct":22},{"key":27,"text":435,"correct":22},{"key":31,"text":437,"correct":22},{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":31,"analysis":33},1106851,"双代号网络计划中，某工作持续时间为5天，其开始节点的最早时间和最迟时间分别为14天和17天，完成节点的最早时间和最迟时间分别为23天和29天，该工作的总时差是（ ）天。",[587,588,589,591],{"key":20,"text":435,"correct":22},{"key":24,"text":437,"correct":22},{"key":27,"text":590,"correct":22},"6",{"key":31,"text":527,"correct":29},{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":31,"analysis":33},1106852,"单代号网络计划，非终点节点的工作的总时差等于（ ）。",[596,598,600,602],{"key":20,"text":597,"correct":22},"本工作与紧前工作时间间隔加该紧前工作的总时差之和的最大值",{"key":24,"text":599,"correct":22},"本工作与紧后工作时间间隔加该紧后工作的总时差之和的最大值",{"key":27,"text":601,"correct":22},"本工作与紧前工作时间间隔加该紧前工作的总时差之和的最小值",{"key":31,"text":603,"correct":29},"本工作与紧后工作时间间隔加该紧后工作的总时差之和的最小值",[605,608,611,614,617,620],{"id":15,"name":606,"category":7,"favorite":607},"领导干部任职前廉政法规知识测试题",92,{"id":609,"name":610,"category":7,"favorite":15},595,"建筑结构与设备",{"id":612,"name":613,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":615,"name":616,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":618,"name":619,"category":7,"favorite":8},534,"BIM工程师",{"id":621,"name":619,"category":7,"favorite":8},535]