[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-782-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":608},{"id":5,"name":6,"category":7,"favorite":8},782,"目标控制（水利工程）","建筑工程",0,8,50,775,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,319,331,343,355,367,379,391,400,412,424,432,444,456,468,480,492,504,513,525,537,548,560,572,584,596],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1106750,1,"单选题","既有法人作为项目法人进行项目资本金筹措，不组建新的独立法人，筹资方案与既有法人公司的总体财务安排相协调。下列各项中，属于既有法人可用于项目资本金的内部资金来源的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","优先股",false,{"key":24,"text":25,"correct":26},"B","企业资产变现",true,{"key":28,"text":29,"correct":22},"C","企业增资扩股",{"key":31,"text":32,"correct":22},"D","国家预算内投资","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1106751,"下列项目债务资金筹措方式中，适用于以购买设备为主的建设项目的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"商业银行贷款",{"key":24,"text":41,"correct":26},"融资租赁",{"key":28,"text":43,"correct":22},"企业债券",{"key":31,"text":45,"correct":22},"银团贷款",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1106752,"政府部门或国有企业将建设好的项目的一定期限的产权或经营权，有偿转让给投资人，由其进行运营管理；投资人在约定的期限内通过经营收回全部投资并得到合理的回报，双方合约期满之后，投资人再将该项目交还政府部门或原企业的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"TOT融资模式",{"key":24,"text":53,"correct":22},"BOT融资模式",{"key":28,"text":55,"correct":22},"PPP项目融资",{"key":31,"text":57,"correct":22},"ABS融资模式",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1106753,"下列属于可行性研究但不在项目建议书中的内容是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"编制投资估算",{"key":24,"text":65,"correct":22},"论证项目建设的必要性",{"key":28,"text":67,"correct":22},"移民安置规划",{"key":31,"text":69,"correct":26},"劳动安全与工业卫生的设计方案",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1106754,"关于外国政府贷款的特点，下列说法中，正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"期限短、利率高",{"key":24,"text":77,"correct":22},"信用要求高",{"key":28,"text":79,"correct":26},"通常限定用途",{"key":31,"text":81,"correct":22},"在贷款总额中，政府贷款一般占2\u002F3，其余1\u002F3为出口信贷",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1106756,"水利工程项目建议书一般由（ ）编制。",[86,88,90,92],{"key":20,"text":87,"correct":26},"政府委托有相应资格的勘测设计单位",{"key":24,"text":89,"correct":22},"招标代理机构",{"key":28,"text":91,"correct":22},"监理单位",{"key":31,"text":93,"correct":22},"建设单位",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1106757,"关于设计节奖超罚，下列说法中不正确的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"在工程总投资节约已基本实现的前提下，设计单位经建设单位主管部门或投资方同意，可按单位工程或扩大单位工程投资总节约额的提成额预分成20%～40%",{"key":24,"text":101,"correct":22},"建设、施工单位共同形成的节约投资中属设计节约提成的部分，原则上应全部支付给设计单位",{"key":28,"text":103,"correct":22},"设计单位为节约工程投资而增加的勘测、设计、科研、试验费用可从相应项目节约的工程投资中支付",{"key":31,"text":105,"correct":26},"一个建设项目由两个设计单位共同承担设计任务开展限额设计工作时，双方均需与建设单位签订设计承包合同，按各自承担的设计项目分别计算工程静态投资节奖超罚",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1106758,"价值工程的核心是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"功能分析",{"key":24,"text":113,"correct":22},"成本分析",{"key":28,"text":115,"correct":22},"价值分析",{"key":31,"text":117,"correct":22},"寿命周期成本分析",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1106759,"在一定范围内，产品的功能与成本的关系为（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"随着产品功能水平的提高，产品的制造成本增加，使用成本增加",{"key":24,"text":125,"correct":26},"随着产品功能水平的提高，产品的制造成本增加，使用成本降低",{"key":28,"text":127,"correct":22},"随着产品功能水平的降低，产品的制造成本增加，使用成本增加",{"key":31,"text":129,"correct":22},"随着产品功能水平的降低，产品的制造成本增加，使用成本降低",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1106761,"水利工程概算的组成包括以下哪几部分？（ ）",[134,136,138,140],{"key":20,"text":135,"correct":22},"建筑工程、建设征地移民补偿、环境保护工程和水土保持工程",{"key":24,"text":137,"correct":26},"工程部分、建设征地移民补偿、环境保护工程和水土保持工程",{"key":28,"text":139,"correct":22},"建筑工程、机电设备及安装工程、施工临时工程、独立费用",{"key":31,"text":141,"correct":22},"直接费、间接费、利润、材料补差和税金",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1106763,"设计单位应根据国家批准的设计概算静态总投资，作为建设项目设计的最高限额。若因设计单位责任，增加了工程静态投资4%以上时，应根据超过相应概算静态投资的大小实行惩罚。超过限额（ ）者，扣相应比例2倍的设计费。",[146,148,150,152],{"key":20,"text":147,"correct":22},"10%以内",{"key":24,"text":149,"correct":22},"10%～20%",{"key":28,"text":151,"correct":26},"20%以上",{"key":31,"text":153,"correct":22},"30%以上",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},1106764,"下列功能评价方法中，对功能进行对比，依其重要程度评分，得出功能评价系数，并与其成本系数相比较，确定功能评价系数的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"实际价值标准法",{"key":24,"text":161,"correct":22},"理论价值标准法",{"key":28,"text":163,"correct":26},"功能重要性系数评价方法",{"key":31,"text":165,"correct":22},"“最合适区域”法",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},1106765,"下列关于材料预算价格的相关说法正确的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"是指材料的出厂价格",{"key":24,"text":173,"correct":22},"包括工地分仓库到各施工点的运杂费",{"key":28,"text":175,"correct":26},"包括材料原价、运杂费、运输保险费和采购及保管费",{"key":31,"text":177,"correct":22},"是指材料从供应地运到工地分仓库（或堆放场地）的价格",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},1106766,"（ ）合同形式可以促使承包方关心降低成本和缩短工期，而且预期成本可以随着设计的进展加以调整，所以发承包双方都不会承担太大的风险，在成本加酬金合同中应用较多。",[182,184,186,188],{"key":20,"text":183,"correct":22},"成本加固定百分比酬金",{"key":24,"text":185,"correct":22},"成本加固定酬金",{"key":28,"text":187,"correct":26},"成本加奖罚",{"key":31,"text":189,"correct":22},"最高限额成本加固定最大酬金",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},1106767,"从承担风险的角度考虑，（ ）主要由发包人承担风险。",[194,196,198,200],{"key":20,"text":195,"correct":22},"总价合同",{"key":24,"text":197,"correct":22},"单价合同",{"key":28,"text":199,"correct":26},"成本加酬金合同",{"key":31,"text":201,"correct":22},"三者均不是",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},1106768,"下列各项中，不属于单价合同优点的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"可以减少招标准备工作，缩短招标准备时间",{"key":24,"text":209,"correct":22},"结算较为简单",{"key":28,"text":211,"correct":22},"可以鼓励承包人节约成本",{"key":31,"text":213,"correct":26},"主要由承包人承担风险",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1106769,"分类分项工程量清单不包括（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":26},"工程量计算规则",{"key":24,"text":221,"correct":22},"项目编码",{"key":28,"text":223,"correct":22},"主要技术条款编码",{"key":31,"text":225,"correct":22},"工程数量",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},1106770,"工程量清单的项目编码采用十二位阿拉伯数字表示，其中五、六位为（ ）顺序编码。",[230,232,234,236],{"key":20,"text":231,"correct":22},"专业工程",{"key":24,"text":233,"correct":22},"分项工程",{"key":28,"text":235,"correct":26},"分类工程",{"key":31,"text":237,"correct":22},"清单项目名称",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1106771,"关于工程量清单计，下列说法中不正确的是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"工程量清单报价表的内容由投标人填写",{"key":24,"text":245,"correct":26},"投标人可以更改招标人提供的工程量清单中的某些内容",{"key":28,"text":247,"correct":22},"分类分项工程量清单计价一般采用工程单价计价",{"key":31,"text":249,"correct":22},"投标金额小于投标总报价万分之五及以下的工程项目，投标人可不编报工程单价计算表",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},1106772,"关于标底与最高投标限价（招标控制价），下列说法中正确的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"招标必须设有标底，可以设有最高投标限价",{"key":24,"text":257,"correct":22},"标底和招标控制价在开标前保密，在开标时宣布",{"key":28,"text":259,"correct":22},"标底对招投标双方都具有一定的约束力",{"key":31,"text":261,"correct":26},"招标控制价可以作为废标的唯一直接依据",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},1106773,"关于最高投标限价，下列说法中正确的是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"招标人可同时设最高投标限价和最低投标限价",{"key":24,"text":269,"correct":26},"招标人设有最高投标限价的，应在招标文件中明确最高投标限价或其计算方法",{"key":28,"text":271,"correct":22},"招标人设有最高投标限价的，应在招标文件中明确最高投标限价和其计算方法",{"key":31,"text":273,"correct":22},"招标人设有最高投标限价的，在招标时公布最高投标限价的总价，但不公布各单位工程的分部分项工程费、措施项目费、其他项目费、规费和税金",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},1106774,"对于工程量清单中列有但承包人未报价的项目，合同实施中（ ）支付工程款。",[278,280,282,284],{"key":20,"text":279,"correct":22},"仍应予",{"key":24,"text":281,"correct":26},"一律不予",{"key":28,"text":283,"correct":22},"应部分",{"key":31,"text":285,"correct":22},"应视情况",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},1106775,"在总价合同实施中，由于通货膨胀而使工料成本增加，按合同规定可以对合同总价进行相应的调整的合同形式称为（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"固定总价合同",{"key":24,"text":293,"correct":26},"可调值总价合同",{"key":28,"text":295,"correct":22},"包干合同",{"key":31,"text":297,"correct":22},"固定工程量总价合同",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":31,"analysis":33},1106776,"工程标底是体现（ ）水平的价格。",[302,304,306,308],{"key":20,"text":303,"correct":22},"社会平均",{"key":24,"text":305,"correct":22},"社会先进",{"key":28,"text":307,"correct":22},"社会合理",{"key":31,"text":309,"correct":26},"社会平均先进",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},1106777,"下列合同形式中，适用于工程量变化不大的项目的是（ ）。",[314,315,316,317],{"key":20,"text":291,"correct":22},{"key":24,"text":293,"correct":22},{"key":28,"text":297,"correct":26},{"key":31,"text":318,"correct":22},"纯单价合同",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":28,"analysis":33},1106778,"工程计量的项目不包括（ ）。",[323,325,327,329],{"key":20,"text":324,"correct":22},"工程量清单中的项目",{"key":24,"text":326,"correct":22},"已由监理人发出变更指令的工程变更项目",{"key":28,"text":328,"correct":26},"承包人自己规划设计的项目",{"key":31,"text":330,"correct":22},"合同文件中规定应由监理人现场确认的，并已获得监理人批准同意的项目",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":24,"analysis":33},1106779,"关于计价争议的鉴定，下列说法中不正确的是（ ）。",[335,337,339,341],{"key":20,"text":336,"correct":22},"对新增工程项目组价发生争议的，合同中约定了调整内容的，按合同约定进行鉴定",{"key":24,"text":338,"correct":26},"鉴定项目发包人对承包人材料采购价格高于合同约定不予认可的，材料采购经发包人或其代表签批认可的，按合同约定的价格进行鉴定",{"key":28,"text":340,"correct":22},"当事人因物价波动要求调整合同价款发生争议的，合同中约定物价波动不予调整的，应对实行政府定价或政府指导价的材料按规定进行鉴定",{"key":31,"text":342,"correct":22},"鉴定项目发包人以工程质量不合格为由，拒绝办理工程结算发生争议的，已竣工验收的工程，工程结算按合同约定进行鉴定",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":28,"analysis":33},1106780,"下列各项费用中，除合同另有约定外，发包人不另行支付的是（ ）。",[347,349,351,353],{"key":20,"text":348,"correct":22},"现场试验室的建设费用",{"key":24,"text":350,"correct":22},"场内施工道路的建设所需的费用",{"key":28,"text":352,"correct":26},"承包人承担的超大、超重件的运输费用",{"key":31,"text":354,"correct":22},"施工用电设施的建设、移设和拆除工作所需费用",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":20,"analysis":33},1106781,"下列各项中，按施工图纸所示计算的有效重量以t或kg为单位计量的是（ ）。",[359,361,363,365],{"key":20,"text":360,"correct":26},"帷幕灌浆",{"key":24,"text":362,"correct":22},"劈裂灌浆",{"key":28,"text":364,"correct":22},"回填灌浆",{"key":31,"text":366,"correct":22},"接缝灌浆",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":28,"analysis":33},1106782,"发包人应在监理人收到进度付款申请单后的（ ）天内，将进度应付款支付给承包人。",[371,373,375,377],{"key":20,"text":372,"correct":22},"7",{"key":24,"text":374,"correct":22},"14",{"key":28,"text":376,"correct":26},"28",{"key":31,"text":378,"correct":22},"30",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":28,"analysis":33},1106783,"关于暂列金额，下列说法中正确的是（ ）。",[383,385,387,389],{"key":20,"text":384,"correct":22},"暂列金额是初步设计及概算内难以预料的费用",{"key":24,"text":386,"correct":22},"暂列金额的使用，必须事先得到监理人的许可并遵循其指示",{"key":28,"text":388,"correct":26},"暂列金额包括以计日工方式支付的金额",{"key":31,"text":390,"correct":22},"监理人可以视需要增加一笔暂列金额",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":20,"analysis":33},1106784,"在具备施工条件的前提下，发包人应在双方签订合同后的一个月内或约定的开工日期前（ ）天内预付工程款。",[395,396,398,399],{"key":20,"text":372,"correct":26},{"key":24,"text":397,"correct":22},"10",{"key":28,"text":374,"correct":22},{"key":31,"text":376,"correct":22},{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":31,"analysis":33},1106785,"工程变更引起措施项目发生变化的，承包人提出调整措施项目费的，应事先将拟实施的方案提交发包人确认。拟实施的方案经发承包双方确认后执行，并应按规定调整措施项目费。其中，（ ）应按照实际发生变化的措施项目调整，不得浮动。",[404,406,408,410],{"key":20,"text":405,"correct":22},"夜间施工增加费",{"key":24,"text":407,"correct":22},"脚手架工程费",{"key":28,"text":409,"correct":22},"二次搬运费",{"key":31,"text":411,"correct":26},"安全文明施工费",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":20,"analysis":33},1106786,"关于工程变更程序，下列说法中正确的是（ ）。",[416,418,420,422],{"key":20,"text":417,"correct":26},"监理人直接指示的工程变更，不需要征求承包人意见",{"key":24,"text":419,"correct":22},"监理人想要增加承包范围外的某项新工作，可以向承包人发出书面变更建议",{"key":28,"text":421,"correct":22},"由监理人决定是否采纳承包人对建设单位提供的图纸提出的提高工程经济效益的合理化建议",{"key":31,"text":423,"correct":22},"监理人收到承包人的书面建议后，应与建设单位共同研究，确认存在变更的，应在收到承包人书面建议后的7天内作出变更指示；经研究后不同意作为变更的，应由监理人书面答复承包人",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":28,"analysis":33},1106787,"承包人应在知道或应当知道索赔事件发生后（ ）天内，向监理人递交索赔意向通知书，并说明发生索赔事件的事由。",[428,429,430,431],{"key":20,"text":372,"correct":22},{"key":24,"text":374,"correct":22},{"key":28,"text":376,"correct":26},{"key":31,"text":378,"correct":22},{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":28,"analysis":33},1106788,"根据《水利水电工程标准文件》中的合同条款，下列索赔事件中，承包人可以同时获得工期补偿和费用补偿的是（ ）。",[436,438,440,442],{"key":20,"text":437,"correct":22},"发包人要求承包人提前交付材料和工程设备",{"key":24,"text":439,"correct":22},"异常恶劣的气候条件",{"key":28,"text":441,"correct":26},"发包人原因引起的暂停施工",{"key":31,"text":443,"correct":22},"不可抗力",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":31,"analysis":33},1106789,"采用清单计价的某分部分项工程，招标控制价中的综合单价为300元，承包人投标报价中的综合单价为250元，该工程投标报价下浮率为5%，结算时，该分部分项工程工程量比清单量增加了20%，且合同未确定综合单价调整方法，则综合单价的处理方式是（ ）。",[448,450,452,454],{"key":20,"text":449,"correct":22},"上调20%",{"key":24,"text":451,"correct":22},"下调5%",{"key":28,"text":453,"correct":22},"调整为242.25元",{"key":31,"text":455,"correct":26},"可不调整",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":28,"analysis":33},1106790,"某工程量清单中的工程量有误，实际工程量增加了20%，发承包双方在施工合同中并未约定是否调整综合单价，则进行结算时，（ ）。",[460,462,464,466],{"key":20,"text":461,"correct":22},"执行原综合单价",{"key":24,"text":463,"correct":22},"增加部分的综合单价需调低",{"key":28,"text":465,"correct":26},"超过15%部分的综合单价需调低",{"key":31,"text":467,"correct":22},"原综合单价需调低",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":20,"analysis":33},1106791,"为了合理划分发承包双方的合同风险，施工合同中应当约定一个基准日，对于招标工程，一般以（ ）前的第28天作为基准日。",[472,474,476,478],{"key":20,"text":473,"correct":26},"投标截止",{"key":24,"text":475,"correct":22},"中标通知书发出",{"key":28,"text":477,"correct":22},"施工合同签订",{"key":31,"text":479,"correct":22},"施工组织设计批准",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":28,"analysis":33},1106792,"承包人按约定接受了（ ）后，应被认为已无权再提出在该接收证书颁发前所发生的任何索赔。",[484,486,488,490],{"key":20,"text":485,"correct":22},"竣工验收合格证书",{"key":24,"text":487,"correct":22},"缺陷责任期终止证书",{"key":28,"text":489,"correct":26},"完工付款证书",{"key":31,"text":491,"correct":22},"最终结清证书",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":24,"analysis":33},1106793,"对于违约责任的处理，下列说法中正确的是（ ）。",[496,498,500,502],{"key":20,"text":497,"correct":22},"因承包人违约造成施工合同解除后，发包人应立即承包人应得到但未支付的工程价款和费用",{"key":24,"text":499,"correct":26},"因承包人违约造成施工合同解除的，监理人应就合同解除前承包人应得到但未支付的工程价款和费用签发付款证书，但应扣除根据施工合同约定应由承包人承担的违约费用",{"key":28,"text":501,"correct":22},"发包人违约承包人按合同的约定暂停施工14天后，发包人仍不纠正违约行为的，承包人可向发包人发出解除合同通知",{"key":31,"text":503,"correct":22},"发包人应在解除合同后56天内向承包人支付相关金额",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":24,"analysis":33},1106794,"发包人应在收到最终结清申请单后（ ）天内审核完毕，由监理人向承包人出具经发包人签认的最终结清证书。",[508,509,510,511],{"key":20,"text":372,"correct":22},{"key":24,"text":374,"correct":26},{"key":28,"text":376,"correct":22},{"key":31,"text":512,"correct":22},"56",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":20,"analysis":33},1106795,"产生投资偏差的原因有很多，下列各项中，不属于客观原因的是（ ）。",[517,519,521,523],{"key":20,"text":518,"correct":26},"汇率变化",{"key":24,"text":520,"correct":22},"社会因素",{"key":28,"text":522,"correct":22},"地质条件",{"key":31,"text":524,"correct":22},"法规变化",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":28,"analysis":33},1106796,"投资偏差分析可以采用不同的方法，下列各项中，不属于投资偏差分析方法的是（ ）。",[529,531,533,535],{"key":20,"text":530,"correct":22},"横道图法",{"key":24,"text":532,"correct":22},"表格法",{"key":28,"text":534,"correct":26},"计划网络图法",{"key":31,"text":536,"correct":22},"投资曲线法",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":24,"analysis":33},1106797,"将项目总投资按单位、分部、单元工程等分解编制而成的资金使用计划称为按（ ）的资金使用计划。",[541,543,545,547],{"key":20,"text":542,"correct":22},"工程投资构成",{"key":24,"text":544,"correct":26},"项目划分组成",{"key":28,"text":546,"correct":22},"工程进度",{"key":31,"text":231,"correct":22},{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":24,"analysis":33},1106798,"根据《水利工程工程量清单计价规范》（GB 50501-2017），下列费用中，不包含在土方明挖工程单价中，需另行支付的是（）",[552,554,556,558],{"key":20,"text":553,"correct":22},"植被清理费",{"key":24,"text":555,"correct":26},"场地平整费",{"key":28,"text":557,"correct":22},"施工超挖费",{"key":31,"text":559,"correct":22},"测量放样费",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":20,"analysis":33},1106799,"常用于造价咨询机构为发包人编制资金使用计划的资金使用计划编制方法是（ ）。",[564,566,568,570],{"key":20,"text":565,"correct":26},"按工程投资构成编制资金使用计划",{"key":24,"text":567,"correct":22},"按工程项目划分组成编制资金使用计划",{"key":28,"text":569,"correct":22},"按工程进度编制资金使用计划",{"key":31,"text":571,"correct":22},"按工程造价控制目标编制资金使用计划",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":24,"analysis":33},1106800,"根据《水利水电工程标准文件》中的合同条款，发包人原因导致的工程缺陷和损失，发包人可获得（ ）。",[576,578,580,582],{"key":20,"text":577,"correct":22},"只有费用补偿",{"key":24,"text":579,"correct":26},"费用补偿和利润补偿",{"key":28,"text":581,"correct":22},"工期补偿和费用补偿",{"key":31,"text":583,"correct":22},"工期补偿、费用补偿和利润补偿",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":28,"analysis":33},1106801,"工程变更引起分部分项工程项目发生变化的，已标价工程量清单中有适用于变更工程项目的，且工程变更导致的该清单项目的工程数量变化不足（ ）时，采用该项目的单价。",[588,590,592,594],{"key":20,"text":589,"correct":22},"5%",{"key":24,"text":591,"correct":22},"10%",{"key":28,"text":593,"correct":26},"15%",{"key":31,"text":595,"correct":22},"20%",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":28,"analysis":33},1106802,"关于工程材料预付款，下列说法中不正确的是（ ）。",[600,602,604,606],{"key":20,"text":601,"correct":22},"一般来说，工程材料预付款不需要承包人提供工程材料预付款保函",{"key":24,"text":603,"correct":22},"工程材料预付款的额度应由发包人与承包人在专用合同条款中具体约定",{"key":28,"text":605,"correct":26},"支付工程材料预付款，意味着对此工程材料和设备的最后批准",{"key":31,"text":607,"correct":22},"发包人在支付工程材料预付款后应在合同规定的时间内以平均的方式在月支付中陆续扣回",[609,612,615,618,621,624],{"id":15,"name":610,"category":7,"favorite":611},"领导干部任职前廉政法规知识测试题",92,{"id":613,"name":614,"category":7,"favorite":15},595,"建筑结构与设备",{"id":616,"name":617,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":619,"name":620,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":622,"name":623,"category":7,"favorite":8},534,"BIM工程师",{"id":625,"name":623,"category":7,"favorite":8},535]