[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-782-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":603},{"id":5,"name":6,"category":7,"favorite":8},782,"目标控制（水利工程）","建筑工程",0,7,50,775,[13,34,46,58,70,82,94,106,118,130,140,152,164,174,186,198,209,221,233,245,257,268,280,292,304,312,322,334,345,357,369,381,389,401,413,425,437,449,461,473,485,497,509,521,533,545,556,568,580,592],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1106698,1,"单选题","（ ）是影响工程项目质量的决定性环节。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","可行性研究阶段",false,{"key":24,"text":25,"correct":26},"B","设计阶段",true,{"key":28,"text":29,"correct":22},"C","施工阶段",{"key":31,"text":32,"correct":22},"D","竣工验收阶段","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1106699,"（ ）在工程开工前，应按规定向水利工程质量监督机构办理工程质量监督手续。",[38,40,42,44],{"key":20,"text":39,"correct":26},"发包人",{"key":24,"text":41,"correct":22},"承包人",{"key":28,"text":43,"correct":22},"分包人",{"key":31,"text":45,"correct":22},"监理单位",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1106700,"建设监理三大控制目标是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"范围、费用、进度",{"key":24,"text":53,"correct":26},"质量、进度、投资",{"key":28,"text":55,"correct":22},"安全、进度、质量",{"key":31,"text":57,"correct":22},"范围、投资、质量",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1106701,"下列哪一项不属于质量保证体系的子体系组成？（ ）",[62,64,66,68],{"key":20,"text":63,"correct":22},"思想保证子体系",{"key":24,"text":65,"correct":22},"组织保证子体系",{"key":28,"text":67,"correct":26},"设计保证子体系",{"key":31,"text":69,"correct":22},"工作保证子体系",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1106702,"以下关于水利工程质量监督机构的设置，错误的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"水利部设置全国水利工程质量监督总站",{"key":24,"text":77,"correct":22},"各自治区、直辖市水利（水电）厅（局）及新疆生产建设兵团水利局设置水利工程质量监督中心站",{"key":28,"text":79,"correct":26},"各乡镇水利（水电）局设置水利工程质量监督站",{"key":31,"text":81,"correct":22},"水利部水利水电规划设计总院设置水利工程设计质量监督分站",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1106703,"基本建设是指建筑、安装和购置固定资产的活动及与之相关的工作。按项目的目标，可将基本建设分为（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"大型、中型及小型建设项目",{"key":24,"text":89,"correct":22},"新建项目和改扩建项目",{"key":28,"text":91,"correct":26},"经营性项目和非经营性项目",{"key":31,"text":93,"correct":22},"公共项目和非公共项目",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1106704,"下列不属于基本建设的工作内容的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"机电设备安装",{"key":24,"text":101,"correct":22},"征地移民",{"key":28,"text":103,"correct":22},"固定资产建造",{"key":31,"text":105,"correct":26},"原材料采购",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1106705,"控制项目投资最有效的手段是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"技术措施",{"key":24,"text":113,"correct":22},"经济措施",{"key":28,"text":115,"correct":26},"技术与经济相结合",{"key":31,"text":117,"correct":22},"组织与经济相结合",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},1106706,"下列各项投资中，属于设备及工器具购置投资的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"用于办公生活的家具、器具",{"key":24,"text":125,"correct":22},"为可行性研究购置的固定资产",{"key":28,"text":127,"correct":26},"生产和维修用工具",{"key":31,"text":129,"correct":22},"系统设备进行单机试运行工作的投资",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1106707,"严格审查初步设计、技术设计、施工图设计、施工组织设计属于项目投资控制措施中的（ ）。",[134,136,137,138],{"key":20,"text":135,"correct":22},"组织措施",{"key":24,"text":111,"correct":26},{"key":28,"text":113,"correct":22},{"key":31,"text":139,"correct":22},"合同措施",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":24,"analysis":33},1106708,"材料的采购、供应和保管部门工作人员的基本工资属于建筑及安装工程费中的（ ）。",[144,146,148,150],{"key":20,"text":145,"correct":22},"人工费",{"key":24,"text":147,"correct":26},"材料费",{"key":28,"text":149,"correct":22},"规费",{"key":31,"text":151,"correct":22},"企业管理费",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":20,"analysis":33},1106709,"下列各项中，属于税金的是（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":26},"增值税销项税额",{"key":24,"text":159,"correct":22},"城市维护建设税",{"key":28,"text":161,"correct":22},"教育费附加",{"key":31,"text":163,"correct":22},"地方教育附加",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":20,"analysis":33},1106710,"夜间施工增加费属于建筑及安装工程费中的（ ）。",[168,170,172,173],{"key":20,"text":169,"correct":26},"直接费",{"key":24,"text":171,"correct":22},"间接费",{"key":28,"text":149,"correct":22},{"key":31,"text":151,"correct":22},{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":28,"analysis":33},1106711,"设备购置费的构成为（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":22},"设备原价、运输费、装卸费和运输保险费",{"key":24,"text":181,"correct":22},"设备原价、运输费、装卸费和采购及保管费",{"key":28,"text":183,"correct":26},"设备原价、运杂费、运输保险费和采购及保管费",{"key":31,"text":185,"correct":22},"设备原价、运输费、运输保险费和采购及保管费",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},1106712,"土地使用税属于下列费用中的（ ）。",[190,192,194,196],{"key":20,"text":191,"correct":22},"生产准备费",{"key":24,"text":193,"correct":26},"项目管理费",{"key":28,"text":195,"correct":22},"建设单位开办费",{"key":31,"text":197,"correct":22},"税金",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":20,"analysis":33},1106713,"基本预备费动用，应由（ ）提出申请，报经上级有审批权的部门批准，其使用额度应严格控制在概（预）算所列的金额之内。",[202,204,206,208],{"key":20,"text":203,"correct":26},"建设单位",{"key":24,"text":205,"correct":22},"施工单位",{"key":28,"text":207,"correct":22},"设计单位",{"key":31,"text":45,"correct":22},{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":31,"analysis":33},1106714,"下列各项中，不属于基本预备费范围的是（ ）。",[213,215,217,219],{"key":20,"text":214,"correct":22},"验收结束时进行恢复导致的费用增加",{"key":24,"text":216,"correct":22},"设计变更导致的费用增加",{"key":28,"text":218,"correct":22},"不可抗力导致的费用增加",{"key":31,"text":220,"correct":26},"材料设备价格上涨导致的费用增加",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":20,"analysis":33},1106715,"下列费用中，属于其他直接费中检验试验费的是（ ）。",[225,227,229,231],{"key":20,"text":226,"correct":26},"对构件进行一般鉴定、检查所发生的费用",{"key":24,"text":228,"correct":22},"新材料的试验费",{"key":28,"text":230,"correct":22},"建设单位要求对具有出厂合格证明的材料进行试验的费用",{"key":31,"text":232,"correct":22},"对构件进行破坏性试验的费用",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":24,"analysis":33},1106716,"下列费用中，属于建设管理费的是（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":22},"拆迁补偿费",{"key":24,"text":240,"correct":26},"工程招标费",{"key":28,"text":242,"correct":22},"工程建设监理费",{"key":31,"text":244,"correct":22},"工程保险费",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":20,"analysis":33},1106717,"按项目投资形成资产的性质分类，项目投资可分为（ ）。",[249,251,253,255],{"key":20,"text":250,"correct":26},"固定资产投资和流动资产投资",{"key":24,"text":252,"correct":22},"净投资和折旧再投资",{"key":28,"text":254,"correct":22},"积极投资和消极投资",{"key":31,"text":256,"correct":22},"直接投资和间接投资",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":20,"analysis":33},1106718,"《水利工程设计概（估）算编制规定》(水总[2014]429 号)，联合试运转费属于（）。",[261,263,265,266],{"key":20,"text":262,"correct":26},"独立费用",{"key":24,"text":264,"correct":22},"安装工程费",{"key":28,"text":191,"correct":22},{"key":31,"text":267,"correct":22},"设备费",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":24,"analysis":33},1106719,"《水利工程设计概（估）算编制规定》（水总[2014]429 号），材料运杂费指设备由交货地点运至（ ）所发生的一切运杂费用。",[272,274,276,278],{"key":20,"text":273,"correct":22},"工地安装现场",{"key":24,"text":275,"correct":26},"工地分仓库",{"key":28,"text":277,"correct":22},"工程所在地",{"key":31,"text":279,"correct":22},"买方指定的地点",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":24,"analysis":33},1106720,"建设工程投资的静态投资部分不包括（ ）。",[284,286,288,290],{"key":20,"text":285,"correct":22},"基本预备费",{"key":24,"text":287,"correct":26},"建设期融资利息",{"key":28,"text":289,"correct":22},"设备工器具购置费",{"key":31,"text":291,"correct":22},"建筑安装工程费",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":20,"analysis":33},1106721,"（ ）阶段发生的勘察设计费属于工程勘测设计费。",[296,298,300,302],{"key":20,"text":297,"correct":26},"项目建议书",{"key":24,"text":299,"correct":22},"环境保护设计",{"key":28,"text":301,"correct":22},"征地移民设计",{"key":31,"text":303,"correct":22},"水土保持设计",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":24,"analysis":33},1106722,"城市维护建设税属于建筑及安装工程费中的（ ）。",[308,309,310,311],{"key":20,"text":169,"correct":22},{"key":24,"text":151,"correct":26},{"key":28,"text":149,"correct":22},{"key":31,"text":197,"correct":22},{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":28,"analysis":33},1106723,"管理用具购置费属于下列费用中的（ ）。",[316,318,320,321],{"key":20,"text":317,"correct":22},"科研勘测设计费",{"key":24,"text":319,"correct":22},"建设管理费",{"key":28,"text":191,"correct":26},{"key":31,"text":242,"correct":22},{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},1106724,"投资按其投放途径或方式可分为直接投资和间接投资，下列选项中属于直接投资的是（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":26},"房地产投资",{"key":24,"text":329,"correct":22},"股票投资",{"key":28,"text":331,"correct":22},"债券投资",{"key":31,"text":333,"correct":22},"信托投资",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1106725,"为解决在工程项目建设过程中，因人工工资、材料和设备价格上涨，以及费用标准调整而增加的投资的是（ ）。",[338,339,341,343],{"key":20,"text":285,"correct":22},{"key":24,"text":340,"correct":26},"价差预备费",{"key":28,"text":342,"correct":22},"材料补差",{"key":31,"text":344,"correct":22},"暂列金额",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":24,"analysis":33},1106726,"在技术设计阶段，影响项目投资的可能性为（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":22},"10%～35%",{"key":24,"text":352,"correct":26},"35%～75%",{"key":28,"text":354,"correct":22},"75%～90%",{"key":31,"text":356,"correct":22},"90%～95%",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":20,"analysis":33},1106727,"某公司第5年后需要一笔200万元的资金用于固定资产的更新改造，如果年利率为6%，问从现在起该企业每年末应存入银行（ ）万元。",[361,363,365,367],{"key":20,"text":362,"correct":26},"35.5",{"key":24,"text":364,"correct":22},"45.7",{"key":28,"text":366,"correct":22},"47.5",{"key":31,"text":368,"correct":22},"57.7",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":28,"analysis":33},1106728,"某企业拟5年内每年投入资金20万元用于技术改造，企业准备存入一笔钱以设立基金，提供每年技术改造所需用的资金。已知年利率为6%，复利计息，问企业现在应存入基金（ ）万元。",[373,375,377,379],{"key":20,"text":374,"correct":22},"89.4",{"key":24,"text":376,"correct":22},"112.7",{"key":28,"text":378,"correct":26},"84.3",{"key":31,"text":380,"correct":22},"69.3",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":28,"analysis":33},1106729,"某项目期初以年利率6%投资200万元，拟计划5年内等额回收全部投资复利本利和，每年可回收的资金为（ ）万元。",[385,386,387,388],{"key":20,"text":362,"correct":22},{"key":24,"text":364,"correct":22},{"key":28,"text":366,"correct":26},{"key":31,"text":368,"correct":22},{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":31,"analysis":33},1106730,"资金时间价值通常用利息和（ ）两个指标表示。",[393,395,397,399],{"key":20,"text":394,"correct":22},"利润",{"key":24,"text":396,"correct":22},"收益",{"key":28,"text":398,"correct":22},"收益率",{"key":31,"text":400,"correct":26},"利率",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":24,"analysis":33},1106731,"财务评价中对投入物和产出物采用以（ ）体系为基础的预测价格。",[405,407,409,411],{"key":20,"text":406,"correct":22},"不变价格",{"key":24,"text":408,"correct":26},"市场价格",{"key":28,"text":410,"correct":22},"可变价格",{"key":31,"text":412,"correct":22},"影子价格",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":31,"analysis":33},1106732,"当财务内部收益率（ ）所设定的基准收益率时，项目方案在财务上是不可行的。",[417,419,421,423],{"key":20,"text":418,"correct":22},"大于或等于",{"key":24,"text":420,"correct":22},"小于或等于",{"key":28,"text":422,"correct":22},"大于",{"key":31,"text":424,"correct":26},"小于",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":24,"analysis":33},1106733,"对于非经营性项目，财务评价主要分析项目的（ ）。",[429,431,433,435],{"key":20,"text":430,"correct":22},"盈利能力",{"key":24,"text":432,"correct":26},"财务生存能力",{"key":28,"text":434,"correct":22},"偿债能力",{"key":31,"text":436,"correct":22},"融资能力",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":24,"analysis":33},1106734,"某建设项目，第1～3年每年年末投入建设资金400万元，第4～8年每年年末获得利润700万元，则该项目的静态投资回收期为（ ）年。",[441,443,445,447],{"key":20,"text":442,"correct":22},"4",{"key":24,"text":444,"correct":26},"4.71",{"key":28,"text":446,"correct":22},"5",{"key":31,"text":448,"correct":22},"5.71",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":24,"analysis":33},1106735,"敏感度系数是指（ ）。",[453,455,457,459],{"key":20,"text":454,"correct":22},"不确定性因素变化率与项目评价指标变化率之比",{"key":24,"text":456,"correct":26},"项目评价指标变化率与不确定性因素变化率之比",{"key":28,"text":458,"correct":22},"不确定性因素变化值与项目评价指标变化值之比",{"key":31,"text":460,"correct":22},"项目评价指标变化值与不确定性因素变化值之比",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":24,"analysis":33},1106736,"下列各项中，属于不确定性分析的是（ ）。",[465,467,469,471],{"key":20,"text":466,"correct":22},"价值分析",{"key":24,"text":468,"correct":26},"盈亏平衡分析",{"key":28,"text":470,"correct":22},"风险分析",{"key":31,"text":472,"correct":22},"概率树",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":20,"analysis":33},1106737,"盈亏平衡点越低，说明项目（ ）。",[477,479,481,483],{"key":20,"text":478,"correct":26},"适应市场变化能力越大，抗风险能力越强",{"key":24,"text":480,"correct":22},"适应市场变化能力越大，抗风险能力越弱",{"key":28,"text":482,"correct":22},"适应市场变化能力越小，抗风险能力越强",{"key":31,"text":484,"correct":22},"适应市场变化能力越小，抗风险能力越弱",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":20,"analysis":33},1106738,"费用比选法用于（ ）的多个互斥方案间的比较。",[489,491,493,495],{"key":20,"text":490,"correct":26},"寿命期相同、收益相同",{"key":24,"text":492,"correct":22},"寿命期相同、收益不同",{"key":28,"text":494,"correct":22},"寿命期不同、收益相同",{"key":31,"text":496,"correct":22},"寿命期不同、收益不同",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":28,"analysis":33},1106739,"下列各项中，不属于效益比选法的是（ ）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"净现值比较法",{"key":24,"text":504,"correct":22},"净年值比较法",{"key":28,"text":506,"correct":26},"费用现值比较法",{"key":31,"text":508,"correct":22},"差额投资内部收益率比较法",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":28,"analysis":33},1106740,"已知某项目的净现金流量如下表。若ic＝8%，则该项目的财务净现值为（ ）万元。",[513,515,517,519],{"key":20,"text":514,"correct":22},"109.62",{"key":24,"text":516,"correct":22},"108.00",{"key":28,"text":518,"correct":26},"101.71",{"key":31,"text":520,"correct":22},"93.38",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":28,"analysis":33},1106741,"某常规技术方案，FNPV（16%）=160 万元，FNPV（18%）=-80 万元，则方案的FIRR 最可能为（ ）。",[525,527,529,531],{"key":20,"text":526,"correct":22},"15.98%",{"key":24,"text":528,"correct":22},"16.21%",{"key":28,"text":530,"correct":26},"17.33%",{"key":31,"text":532,"correct":22},"18.21%",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":20,"analysis":33},1106744,"某建设项目，建设期为3年，向银行贷款2000万元，第一年贷款400万元，第二年贷款1000万元，第三年贷款600万元，年利率为10%，则建设期的贷款利息为（ ）万元。",[537,539,541,543],{"key":20,"text":538,"correct":26},"293.2",{"key":24,"text":540,"correct":22},"340",{"key":28,"text":542,"correct":22},"393.2",{"key":31,"text":544,"correct":22},"442",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":31,"analysis":33},1106745,"某企业为设立技术改造基金，从第一年至第五年，每年存入银行20万元，存款年利率为6%，复利计息，问第五年末该基金内有（ ）万元。",[549,551,553,555],{"key":20,"text":550,"correct":22},"104.8",{"key":24,"text":552,"correct":22},"106.0",{"key":28,"text":554,"correct":22},"107.5",{"key":31,"text":376,"correct":26},{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":24,"analysis":33},1106746,"某项目有 A、 B、C三个方案，寿命周期均相同，投资额A＞B＞ C，方案A对于方案B的差额内部收益率为8%，方案B对于方案C的差额内部收益率为11%，基准收益率为10%，则最优方案为（ ）。",[560,562,564,566],{"key":20,"text":561,"correct":22},"方案A",{"key":24,"text":563,"correct":26},"方案B",{"key":28,"text":565,"correct":22},"方案C",{"key":31,"text":567,"correct":22},"不能确定",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":24,"analysis":33},1106747,"项目在借款偿还期内，各年可用于支付利息的息税前利润与当期应付利息的比值为（ ）。",[572,574,576,578],{"key":20,"text":573,"correct":22},"偿债备付率",{"key":24,"text":575,"correct":26},"利息备付率",{"key":28,"text":577,"correct":22},"资产负债率",{"key":31,"text":579,"correct":22},"项目资本金净利润率",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":31,"analysis":33},1106748,"坝高为100m的地方大型水库建设项目的项目建议书由（ ）负责组织技术审查。",[584,586,588,590],{"key":20,"text":585,"correct":22},"水利部",{"key":24,"text":587,"correct":22},"省级水行政主管部门",{"key":28,"text":589,"correct":22},"流域机构",{"key":31,"text":591,"correct":26},"水利部或委托流域机构",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":24,"analysis":33},1106749,"初步设计概算静态总投资超过可行性研究报告估算的静态总投资15%以上（含15%）时，必须重编（ ）。",[596,597,599,601],{"key":20,"text":297,"correct":22},{"key":24,"text":598,"correct":26},"可行性研究报告",{"key":28,"text":600,"correct":22},"初步设计报告",{"key":31,"text":602,"correct":22},"专题分析报告",[604,607,610,613,616,619],{"id":15,"name":605,"category":7,"favorite":606},"领导干部任职前廉政法规知识测试题",92,{"id":608,"name":609,"category":7,"favorite":15},595,"建筑结构与设备",{"id":611,"name":612,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":614,"name":615,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":617,"name":618,"category":7,"favorite":8},534,"BIM工程师",{"id":620,"name":618,"category":7,"favorite":8},535]