[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-782-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":579},{"id":5,"name":6,"category":7,"favorite":8},782,"目标控制（水利工程）","建筑工程",0,2,50,775,[13,34,46,56,68,79,91,103,115,127,139,151,163,175,187,199,209,221,231,243,254,266,278,290,299,311,319,331,343,355,367,377,389,398,410,422,434,446,454,466,478,486,497,506,516,524,536,546,558,567],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1106446,1,"单选题","承包人在测量工作开始之前将测量人员的资格证书及测量设备检定证书报送（ ）进行审批。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","检测单位",false,{"key":24,"text":25,"correct":22},"B","质量监督机构",{"key":27,"text":28,"correct":29},"C","监理机构",true,{"key":31,"text":32,"correct":22},"D","建设单位","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1106447,"承包人按批准的技术方案组织施工，实施期间如需变更，则（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":29},"重新报批",{"key":24,"text":41,"correct":22},"内部审核",{"key":27,"text":43,"correct":22},"专家论证",{"key":31,"text":45,"correct":22},"平行检验",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1106448,"（ ）在对承包人的施工组织设计和技术措施进行仔细审查后提出意见和建议。",[50,51,53,54],{"key":20,"text":32,"correct":22},{"key":24,"text":52,"correct":22},"审查机构",{"key":27,"text":28,"correct":29},{"key":31,"text":55,"correct":22},"造价咨询机构",{"id":57,"libraryId":5,"type":15,"typeLabel":16,"stem":58,"options":59,"answer":27,"analysis":33},1106449,"在施工质量管理中，（ ）是工程质量的基础。",[60,62,64,66],{"key":20,"text":61,"correct":22},"环境的因素",{"key":24,"text":63,"correct":22},"方法的因素",{"key":27,"text":65,"correct":29},"材料的因素",{"key":31,"text":67,"correct":22},"人的因素",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":24,"analysis":33},1106450,"对专用合同条款约定的试块、试件及有关材料，监理机构实行（ ）。",[72,73,75,77],{"key":20,"text":45,"correct":22},{"key":24,"text":74,"correct":29},"见证取样",{"key":27,"text":76,"correct":22},"巡视",{"key":31,"text":78,"correct":22},"旁站",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":31,"analysis":33},1106451,"工程设备质盘控制要点中，单体调试合格，并取得生产（使用）单位参加人员的确认后，可分别向生产单位办理（ ）。",[83,85,87,89],{"key":20,"text":84,"correct":22},"验收交工",{"key":24,"text":86,"correct":22},"安全交工",{"key":27,"text":88,"correct":22},"质量交工",{"key":31,"text":90,"correct":29},"技术交工",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":31,"analysis":33},1106452,"为考查摸索工艺方法、工艺参数的可行性或材料的可加工性等而进行的试验，指的是（ ）。",[95,97,99,101],{"key":20,"text":96,"correct":22},"分部试验",{"key":24,"text":98,"correct":22},"分项试验",{"key":27,"text":100,"correct":22},"工序试验",{"key":31,"text":102,"correct":29},"工艺试验",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":31,"analysis":33},1106453,"土方碾压施工工艺试验的目的是核实填筑土料室内击实试验结果的（ ）。",[107,109,111,113],{"key":20,"text":108,"correct":22},"准确性",{"key":24,"text":110,"correct":22},"有效性",{"key":27,"text":112,"correct":22},"可行性",{"key":31,"text":114,"correct":29},"合理性",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":24,"analysis":33},1106454,"工程质量是在（ ）中形成的，不是检验出来的。",[119,121,123,125],{"key":20,"text":120,"correct":22},"施工准备",{"key":24,"text":122,"correct":29},"施工过程",{"key":27,"text":124,"correct":22},"设计图纸",{"key":31,"text":126,"correct":22},"质量规范",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":31,"analysis":33},1106455,"根据使用材料的不同，基础可分为不同种类，其中用于安装大型及有振动力设备的基础是（ ）。",[131,133,135,137],{"key":20,"text":132,"correct":22},"砖基础",{"key":24,"text":134,"correct":22},"木基础",{"key":27,"text":136,"correct":22},"素混凝土基础",{"key":31,"text":138,"correct":29},"钢筋混凝土基础",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":20,"analysis":33},1106456,"金属结构设备埋件的二期混凝土强度，达到（ ）以后方可拆模，拆模后应对埋件进行复测，并做好记录。",[143,145,147,149],{"key":20,"text":144,"correct":29},"70%",{"key":24,"text":146,"correct":22},"80%",{"key":27,"text":148,"correct":22},"90%",{"key":31,"text":150,"correct":22},"100%",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":24,"analysis":33},1106457,"金属结构闸门安装完毕后，承包人应会同监理机构对闸门进行相关项目的试验和检查，（ ）应检查并确认吊杆的连接情况是否良好。",[155,157,159,161],{"key":20,"text":156,"correct":22},"验收前",{"key":24,"text":158,"correct":29},"试验前",{"key":27,"text":160,"correct":22},"试验中",{"key":31,"text":162,"correct":22},"试验后",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":24,"analysis":33},1106458,"大型水工建筑物所用的水泥，可根据具体情况对水泥的矿物成分等提出专门要求，每一工程所用水泥品种以（ ）种为宜。",[167,169,171,173],{"key":20,"text":168,"correct":22},"1～3",{"key":24,"text":170,"correct":29},"1～2",{"key":27,"text":172,"correct":22},"2～3",{"key":31,"text":174,"correct":22},"1～4",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":24,"analysis":33},1106459,"成品骨料出厂品质检测时，细骨料应按同料源每（ ）为一批。",[179,181,183,185],{"key":20,"text":180,"correct":22},"400t",{"key":24,"text":182,"correct":29},"600t",{"key":27,"text":184,"correct":22},"800t",{"key":31,"text":186,"correct":22},"1000t",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":24,"analysis":33},1106460,"坍落度的检测中，应按施工图纸的规定和监理机构的指示，每班应进行现场混凝土坍落度的检测，出机口应检测（ ）次，仓面应检测（ ）次。",[191,193,195,197],{"key":20,"text":192,"correct":22},"3；2",{"key":24,"text":194,"correct":29},"4；2",{"key":27,"text":196,"correct":22},"3；3",{"key":31,"text":198,"correct":22},"4；3",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":20,"analysis":33},1106461,"进行土方明挖时，监理机构应对开挖过程进行（ ）监督检查，对开挖质量进行控制。",[203,205,207,208],{"key":20,"text":204,"correct":29},"连续的",{"key":24,"text":206,"correct":22},"间断的",{"key":27,"text":76,"correct":22},{"key":31,"text":74,"correct":22},{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":27,"analysis":33},1106462,"填筑材料开挖时宜采用（ ）方法，以获得满足设计级配要求的坝料，并做到“计划开挖、分类堆存”。",[213,215,217,219],{"key":20,"text":214,"correct":22},"特殊爆破",{"key":24,"text":216,"correct":22},"普通爆破",{"key":27,"text":218,"correct":29},"控制爆破",{"key":31,"text":220,"correct":22},"一般爆破",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":27,"analysis":33},1106463,"施工图核查是指（ ）对施工图的核查。",[225,227,229,230],{"key":20,"text":226,"correct":22},"设计单位",{"key":24,"text":228,"correct":22},"施工图审查机构",{"key":27,"text":28,"correct":29},{"key":31,"text":32,"correct":22},{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":20,"analysis":33},1106464,"监理机构在收到施工图纸后，首先应对图纸进行核查。在确认图纸正确无误后，由（ ）签发，并加盖监理机构章，下达给承包人，施工图即正式生效。",[235,237,239,241],{"key":20,"text":236,"correct":29},"总监理工程师",{"key":24,"text":238,"correct":22},"专业监理工程师",{"key":27,"text":240,"correct":22},"监理员",{"key":31,"text":242,"correct":22},"总监理工程师代表",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":31,"analysis":33},1106465,"（ ）在工程开工前应向承包人提供已有的与本工程有关的水文和地质勘测资料以及应由发包人提供的图纸。",[247,249,250,252],{"key":20,"text":248,"correct":22},"勘察单位",{"key":24,"text":226,"correct":22},{"key":27,"text":251,"correct":22},"监理人",{"key":31,"text":253,"correct":29},"发包人",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":27,"analysis":33},1106466,"影响工程质量的因素有五大方面，即“人、材料、机械、方法、环境”。（ ）有效控制这五方面因素的质量是确保工程施工阶段质量的关键。",[258,260,262,264],{"key":20,"text":259,"correct":22},"事后",{"key":24,"text":261,"correct":22},"事中",{"key":27,"text":263,"correct":29},"事前",{"key":31,"text":265,"correct":22},"验收时",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":20,"analysis":33},1106467,"对于发包人提供的材料和工程设备，发包人应在材料和工程设备到货（ ）天前通知承包人。",[270,272,274,276],{"key":20,"text":271,"correct":29},"7",{"key":24,"text":273,"correct":22},"10",{"key":27,"text":275,"correct":22},"15",{"key":31,"text":277,"correct":22},"20",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":27,"analysis":33},1106468,"对材料从品种、规格、标志、外形尺寸等进行直观检验，看其有无质量问题的材料质量检验方法为（ ）。",[282,284,286,288],{"key":20,"text":283,"correct":22},"书面检验",{"key":24,"text":285,"correct":22},"无损检验",{"key":27,"text":287,"correct":29},"外观检验",{"key":31,"text":289,"correct":22},"理化检验",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":24,"analysis":33},1106469,"为了更好地发挥施工设备的使用效果和质量效果，（ ）应督促承包人做好施工设备的使用管理工作。",[294,295,296,297],{"key":20,"text":253,"correct":22},{"key":24,"text":251,"correct":29},{"key":27,"text":25,"correct":22},{"key":31,"text":298,"correct":22},"检测机构",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":27,"analysis":33},1106470,"找出对工序的关键或重要的质量特性起着支配作用的那些要素的全部活动，是指的（ ）。",[303,305,307,309],{"key":20,"text":304,"correct":22},"工序预测",{"key":24,"text":306,"correct":22},"工序活动",{"key":27,"text":308,"correct":29},"工序分析",{"key":31,"text":310,"correct":22},"工序评价",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":20,"analysis":33},1106471,"承包人对质量控制点的控制措施设计完成后，经（ ）审核批准后方可实施。",[315,316,317,318],{"key":20,"text":251,"correct":29},{"key":24,"text":253,"correct":22},{"key":27,"text":21,"correct":22},{"key":31,"text":226,"correct":22},{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":20,"analysis":33},1106472,"监理机构的检查和验收，（ ）承包人按合同约定应负的责任。",[323,325,327,329],{"key":20,"text":324,"correct":29},"不免除",{"key":24,"text":326,"correct":22},"可免除",{"key":27,"text":328,"correct":22},"可判定",{"key":31,"text":330,"correct":22},"不可判定",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":31,"analysis":33},1106473,"主要金属结构安装项目开工前，（ ）必须编制安装方案供监理工程师审查。",[335,337,339,341],{"key":20,"text":336,"correct":22},"承包单位",{"key":24,"text":338,"correct":22},"分包单位",{"key":27,"text":340,"correct":22},"供货单位",{"key":31,"text":342,"correct":29},"安装单位",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":20,"analysis":33},1106474,"金属结构的闸门在承受设计水头的压力时，通过任意1m长度的水封范围内漏水量不应超过（ ）L\u002Fs。",[347,349,351,353],{"key":20,"text":348,"correct":29},"0.1",{"key":24,"text":350,"correct":22},"0.2",{"key":27,"text":352,"correct":22},"0.3",{"key":31,"text":354,"correct":22},"0.5",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":31,"analysis":33},1106475,"基础面混凝土浇筑时，基岩面浇筑仓，在浇筑第一层混凝土前，必须先铺一层（ ）的水泥砂浆。",[359,361,363,365],{"key":20,"text":360,"correct":22},"1～4cm",{"key":24,"text":362,"correct":22},"2～4cm",{"key":27,"text":364,"correct":22},"1～3cm",{"key":31,"text":366,"correct":29},"2～3cm",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":20,"analysis":33},1106476,"支护时，喷射混凝土抗压强度保证率在（ ）及以上。",[371,373,374,376],{"key":20,"text":372,"correct":29},"85%",{"key":24,"text":146,"correct":22},{"key":27,"text":375,"correct":22},"75%",{"key":31,"text":144,"correct":22},{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":27,"analysis":33},1106477,"粒径大于40mm的粗骨料的净自由落差不宜大于（ ）m。",[381,383,385,387],{"key":20,"text":382,"correct":22},"1",{"key":24,"text":384,"correct":22},"2",{"key":27,"text":386,"correct":29},"3",{"key":31,"text":388,"correct":22},"5",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},1106478,"施工质量控制应以控制（ ）为基本出发点。",[393,394,396,397],{"key":20,"text":67,"correct":29},{"key":24,"text":395,"correct":22},"机械的因素",{"key":27,"text":65,"correct":22},{"key":31,"text":61,"correct":22},{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":24,"analysis":33},1106479,"以下不属于事后质量控制内容的是（ ）。",[402,404,406,408],{"key":20,"text":403,"correct":22},"审核工程资料，组织或参加各阶段验收",{"key":24,"text":405,"correct":29},"审核监理单位提供的质量检验报告及有关技术性文件",{"key":27,"text":407,"correct":22},"整理有关工程项目质量的技术文件，并编目、建档",{"key":31,"text":409,"correct":22},"评价工程项目质量状况及水平",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":31,"analysis":33},1106480,"以下关于设备调平找正的说法，错误的是（ ）。",[414,416,418,420],{"key":20,"text":415,"correct":22},"设备找正找平时需要相应的基准面和测点",{"key":24,"text":417,"correct":22},"一般情况下对于刚性较大的设备，测点数可较少",{"key":27,"text":419,"correct":22},"对于易变形的设备，测点数应适当增多",{"key":31,"text":421,"correct":29},"精平时，设备的地脚螺栓已经灌浆，其混凝土强度不应低于设计强度的90%，地脚螺栓可紧固",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":31,"analysis":33},1106481,"以下关于现场工艺试验规定的说法，错误的是（ ）。",[426,428,430,432],{"key":20,"text":427,"correct":22},"监理机构应审批承包人提交的现场工艺试验方案",{"key":24,"text":429,"correct":22},"现场工艺试验完成后，监理机构应确认承包人提交的现场工艺试验成果",{"key":27,"text":431,"correct":22},"监理机构应依据确认的现场工艺试验成果，审查承包人提交的施工措施计划中的施工工艺",{"key":31,"text":433,"correct":29},"对承包人提出的新工艺，监理机构应提请发包人对工艺试验成果进行评审认定",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":20,"analysis":33},1106482,"（ ）是日常考核工程质量的基本单位。",[438,440,442,444],{"key":20,"text":439,"correct":29},"单元工程",{"key":24,"text":441,"correct":22},"单位工程",{"key":27,"text":443,"correct":22},"单项工程",{"key":31,"text":445,"correct":22},"分部工程",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":24,"analysis":33},1106483,"参加工程外观质量评定的人员应具有工程师以上技术职称或相应执业资格，评定组人数应不少于（ ）人。",[450,451,452,453],{"key":20,"text":386,"correct":22},{"key":24,"text":388,"correct":29},{"key":27,"text":271,"correct":22},{"key":31,"text":273,"correct":22},{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},1106484,"堤防工程按（ ）或工程结构划分单位工程。",[458,460,462,464],{"key":20,"text":459,"correct":22},"每座独立的建筑物",{"key":24,"text":461,"correct":29},"招标标段",{"key":27,"text":463,"correct":22},"加固内容",{"key":31,"text":465,"correct":22},"人员参与数量",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":31,"analysis":33},1106485,"以下关于单元工程质量评定标准的说法，错误的是（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":22},"单元工程质量等级标准是进行工程质量等级评定的基本尺度",{"key":24,"text":473,"correct":22},"当达不到合格标准时，全部返工重做的，可重新评定质量等级",{"key":27,"text":475,"correct":22},"当达不到合格标准时，经加固补强并经设计和监理单位鉴定能达到设计要求，其质量评为合格",{"key":31,"text":477,"correct":29},"单元工程质量分为合格、一般和优良三个等级",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":31,"analysis":33},1106486,"项目法人应当自收到专项验收成果文件之日起（ ）个工作日内，将专项验收成果文件报送竣工验收主持单位备案。",[482,483,484,485],{"key":20,"text":386,"correct":22},{"key":24,"text":388,"correct":22},{"key":27,"text":271,"correct":22},{"key":31,"text":273,"correct":29},{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":27,"analysis":33},1106487,"项目法人组织单位工程验收时，应提前通知（ ）。",[490,492,493,495],{"key":20,"text":491,"correct":22},"施工单位",{"key":24,"text":226,"correct":22},{"key":27,"text":494,"correct":29},"质量和安全监督机构",{"key":31,"text":496,"correct":22},"法人验收监督管理机关",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":24,"analysis":33},1106488,"发包人有权要求承包人相应延长缺陷责任期，但缺陷责任期最长不超过（ ）年。",[501,502,503,504],{"key":20,"text":382,"correct":22},{"key":24,"text":384,"correct":29},{"key":27,"text":386,"correct":22},{"key":31,"text":505,"correct":22},"4",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":27,"analysis":33},1106489,"缺陷责任期满后（ ）个工作日内，发包人应向承包人颁发工程质量缺陷责任终止证书，并退还剩余的质量保证金。",[510,511,512,514],{"key":20,"text":273,"correct":22},{"key":24,"text":277,"correct":22},{"key":27,"text":513,"correct":29},"30",{"key":31,"text":515,"correct":22},"60",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":27,"analysis":33},1106490,"根据《水利水电建设工程验收规程》（SL 223—2008），项目法人应在收到合同工程完工验收申请报告之日起（ ）个工作日内，决定是否同意验收。",[520,521,522,523],{"key":20,"text":273,"correct":22},{"key":24,"text":275,"correct":22},{"key":27,"text":277,"correct":29},{"key":31,"text":513,"correct":22},{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},1106491,"以下选项中，属于项目法人完成工程建设任务凭据的是（ ）。",[528,530,532,534],{"key":20,"text":529,"correct":22},"竣工证书",{"key":24,"text":531,"correct":29},"工程验收鉴定书",{"key":27,"text":533,"correct":22},"工程完工证书",{"key":31,"text":535,"correct":22},"保修责任终止证书",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":20,"analysis":33},1106492,"工程项目划分表由（ ）组织编制并报质量监督机构确定。",[540,542,543,545],{"key":20,"text":541,"correct":29},"项目法人",{"key":24,"text":491,"correct":22},{"key":27,"text":544,"correct":22},"监理单位",{"key":31,"text":226,"correct":22},{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":31,"analysis":33},1106493,"项目法人应在（ ）60个工作日内，制定法人验收工作计划，报法人验收监督管理机关和竣工验收主持单位备案。",[550,552,554,556],{"key":20,"text":551,"correct":22},"可行性研究报告批准后",{"key":24,"text":553,"correct":22},"开工报告批准后",{"key":27,"text":555,"correct":22},"初步设备批准后",{"key":31,"text":557,"correct":29},"开工后",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":27,"analysis":33},1106494,"水利工程项目划分不包括（ ）。",[562,563,564,566],{"key":20,"text":441,"correct":22},{"key":24,"text":445,"correct":22},{"key":27,"text":565,"correct":29},"分项工程",{"key":31,"text":439,"correct":22},{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":24,"analysis":33},1106495,"全面考核该阶段工程是否符合批准的设计文件要求，以确定工程能否继续进入到下一阶段施工或投入运行指的是（ ）。",[571,573,575,577],{"key":20,"text":572,"correct":22},"工程评定",{"key":24,"text":574,"correct":29},"工程验收",{"key":27,"text":576,"correct":22},"工程竣工",{"key":31,"text":578,"correct":22},"工程检验",[580,583,586,589,592,595],{"id":15,"name":581,"category":7,"favorite":582},"领导干部任职前廉政法规知识测试题",92,{"id":584,"name":585,"category":7,"favorite":15},595,"建筑结构与设备",{"id":587,"name":588,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":590,"name":591,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":593,"name":594,"category":7,"favorite":8},534,"BIM工程师",{"id":596,"name":594,"category":7,"favorite":8},535]