[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-782-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":382},{"id":5,"name":6,"category":7,"favorite":8},782,"目标控制（水利工程）","建筑工程",0,16,50,775,[13,38,53,68,83,98,113,127,142,156,171,185,200,215,229,243,257,271,285,299,313,328,343,357,370],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1107154,2,"多选题","工作历时估估算方法中，在缺少经验数据时，综合调整系数可参考取值正确的是（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","当t≤7天时，K=1.25～1.4",true,{"key":24,"text":25,"correct":26},"B","当t≤7天时，K=1～1.4",false,{"key":28,"text":29,"correct":22},"C","当t＞7天时，K=1～1.25",{"key":31,"text":32,"correct":26},"D","当t＞7天时，K=1～1.4",{"key":34,"text":35,"correct":26},"E","当t＞7天时，K=1.25～1.4","AC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1107155,"将串联工作改为平行交叉工作的特点是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"不改变工序间的逻辑关系",{"key":24,"text":45,"correct":22},"不缩短各工序总的持续时间",{"key":28,"text":47,"correct":26},"不违反工艺要求",{"key":31,"text":49,"correct":26},"减少资源",{"key":34,"text":51,"correct":26},"能收到最大的优化效果","AB",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1107156,"工作可压缩的时间，可受到（ ）约束限制。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"工作本身的最快历时的限制",{"key":24,"text":60,"correct":22},"非关键时差的限制",{"key":28,"text":62,"correct":22},"平行关键路线的结束限制",{"key":31,"text":64,"correct":22},"紧缩的关键路线的结束限制",{"key":34,"text":66,"correct":26},"关键时差的限制","ABCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1107157,"网络计划的优化目标，应按计划任务的需要和条件选定，包括（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"工期目标",{"key":24,"text":75,"correct":26},"人力目标",{"key":28,"text":77,"correct":22},"资源目标",{"key":31,"text":79,"correct":26},"效益目标",{"key":34,"text":81,"correct":22},"费用目标","ACE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1107158,"下列属于RSM法的主要步骤的有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"绘制时标网络的每单位时间的资源需要量动态曲线",{"key":24,"text":90,"correct":26},"最终检查网络计划，确定是否存在资源冲突",{"key":28,"text":92,"correct":22},"修正调整后的网络计划及资源需要量动态曲线",{"key":31,"text":94,"correct":22},"根据式△Tij=EFi-LSj，逐步调整引起冲突的工作，直到冲突得到解决",{"key":34,"text":96,"correct":26},"调整过程中如果有工期延长，按照调整资源冲突且延长工期的方案","ACD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1107159,"当存在工程未完全完工但部分工程投产的情况时，应注意施工和运行部分工程的交叉问题，避免互相干扰，影响（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"工期",{"key":24,"text":105,"correct":22},"工程施工",{"key":28,"text":107,"correct":26},"费用控制",{"key":31,"text":109,"correct":26},"管理难度",{"key":34,"text":111,"correct":22},"运行安全","ABE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":52,"analysis":37},1107160,"发包人进度计划编制注意事项中，（ ）里程碑节点确定时，应考虑分标方案。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"施工准备",{"key":24,"text":120,"correct":22},"主体工程施工",{"key":28,"text":122,"correct":26},"建设工期",{"key":31,"text":124,"correct":26},"基础工程施工",{"key":34,"text":126,"correct":26},"结构工程施工",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1107161,"水利工程按照工程的性质不同可分为（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"枢纽工程",{"key":24,"text":134,"correct":22},"引水工程",{"key":28,"text":136,"correct":26},"水电站工程",{"key":31,"text":138,"correct":22},"河道工程",{"key":34,"text":140,"correct":26},"堤防工程","ABD",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":67,"analysis":37},1107162,"合同性进度计划审查的主要内容包括（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"响应性与符合性",{"key":24,"text":149,"correct":22},"正确性与可行性",{"key":28,"text":151,"correct":22},"关键路线选择的正确性",{"key":31,"text":153,"correct":22},"进度计划与资源计划的协调性",{"key":34,"text":155,"correct":26},"管理水平情况",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},1107163,"逻辑关系的类型包括（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"强制性逻辑关系",{"key":24,"text":163,"correct":22},"选择性逻辑关系",{"key":28,"text":165,"correct":26},"强制性外部关系",{"key":31,"text":167,"correct":22},"外部逻辑关系",{"key":34,"text":169,"correct":22},"内部逻辑关系","ABDE",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":184,"analysis":37},1107164,"下列选项属于合同性进度计划的主要编制依据有（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"施工现场的水文观测资料",{"key":24,"text":178,"correct":26},"项目路线的正确情况",{"key":28,"text":180,"correct":22},"资金供应的情况",{"key":31,"text":182,"correct":22},"原材料及工程设备供应情况",{"key":34,"text":155,"correct":22},"ACDE",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":199,"analysis":37},1107165,"进度控制应遵循工程控制论基本原理，做好施工进度的（ ）工作。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"事前预控",{"key":24,"text":192,"correct":22},"事中监督",{"key":28,"text":194,"correct":22},"事后反馈纠偏",{"key":31,"text":196,"correct":26},"事前强化控制",{"key":34,"text":198,"correct":26},"事中控制","ABC",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":214,"analysis":37},1107166,"工程进度延误后，进度计划调整的原则有（ ）。",[204,206,208,210,212],{"key":20,"text":205,"correct":26},"应从工程建设局部重要地段出发",{"key":24,"text":207,"correct":22},"进度里程碑目标不得随意突破",{"key":28,"text":209,"correct":22},"合同规定的总工期和中间完工日期不得随意调整",{"key":31,"text":211,"correct":22},"计划的调整应首先保证关键工作的按期完成",{"key":34,"text":213,"correct":22},"选择合理的施工方案和适度增加资源的投入，使费用增加较少","BCDE",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":184,"analysis":37},1107167,"工程进度影响因素中施工组织管理方面主要包括（ ）。",[219,221,223,225,227],{"key":20,"text":220,"correct":22},"设计变更等引起的资金短缺",{"key":24,"text":222,"correct":26},"设计现场服务不到位",{"key":28,"text":224,"correct":22},"管理资源问题",{"key":31,"text":226,"correct":22},"关键设备未到位",{"key":34,"text":228,"correct":22},"施工组织设计不合理",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":170,"analysis":37},1107168,"监理机构可签发暂停施工指示，并抄送发包人的情况有（ ）。",[233,235,237,239,241],{"key":20,"text":234,"correct":22},"发包人要求暂停施工",{"key":24,"text":236,"correct":22},"承包人所使用的施工设备不合格",{"key":28,"text":238,"correct":26},"不可抗力的自然或社会因素引起的暂停施工",{"key":31,"text":240,"correct":22},"承包人的人员不能胜任作业要求",{"key":34,"text":242,"correct":22},"承包人未经许可即进行主体工程施工时，改正这一行为所需要的局部停工",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":170,"analysis":37},1107169,"下列选项中属于承包人暂停施工的责任的有（ ）。",[247,249,251,253,255],{"key":20,"text":248,"correct":22},"承包人违约引起的暂停施工",{"key":24,"text":250,"correct":22},"承包人擅自暂停施工",{"key":28,"text":252,"correct":26},"由于发包人违约引起的暂停施工",{"key":31,"text":254,"correct":22},"承包人其他原因引起的暂停施工",{"key":34,"text":256,"correct":22},"专用合同条款约定由承包人承担的其他暂停施工",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":52,"analysis":37},1107170,"计算工期延长的方法中，（ ）计算出的工期延长是不精确的，常引起合同争议。",[261,263,265,267,269],{"key":20,"text":262,"correct":22},"平衡点法",{"key":24,"text":264,"correct":22},"比例法",{"key":28,"text":266,"correct":26},"网络计划分析法",{"key":31,"text":268,"correct":26},"施工节点对比法",{"key":34,"text":270,"correct":26},"时标网络图法",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":170,"analysis":37},1107172,"工期延误的类型包括（ ）。",[275,277,279,281,283],{"key":20,"text":276,"correct":22},"不利物质条件原因引起的工期延误",{"key":24,"text":278,"correct":22},"发包人、监理人原因引起的工期延误",{"key":28,"text":280,"correct":26},"长期延误和短期延误",{"key":31,"text":282,"correct":22},"不可抗力、异常恶劣的气候条件原因引起的工期延误",{"key":34,"text":284,"correct":22},"承包人原因引起的工期延误",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":214,"analysis":37},1107173,"工期延误计算的依据主要有（ ）。",[289,291,293,295,297],{"key":20,"text":290,"correct":26},"计算公式的错误",{"key":24,"text":292,"correct":22},"合同规定的完工时间",{"key":28,"text":294,"correct":22},"施工现场情况",{"key":31,"text":296,"correct":22},"受干扰后实际工程进度记录",{"key":34,"text":298,"correct":22},"承包人呈报的经监理人同意的施工进度计划",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":170,"analysis":37},1107174,"由于发包人方面的原因，导致工期拖延，承包人在获得工期延长补偿以外，申请工期延误事件引起的派生费用损失有（ ）。",[303,305,307,309,311],{"key":20,"text":304,"correct":22},"人工费",{"key":24,"text":306,"correct":22},"生产率降低",{"key":28,"text":308,"correct":26},"精神损失费",{"key":31,"text":310,"correct":22},"保险费和保函费",{"key":34,"text":312,"correct":22},"工地及公司管理费",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":327,"analysis":37},1107175,"OraclePrimaveraP6软件的主要功能包括（ ）。",[317,319,321,323,325],{"key":20,"text":318,"correct":26},"能优化数据库组织.存储和管理",{"key":24,"text":320,"correct":22},"能同时优化.计划和管理多个工程",{"key":28,"text":322,"correct":22},"能同时有效控制大型.复杂工程项目",{"key":31,"text":324,"correct":22},"能通过电子邮件传递信息",{"key":34,"text":326,"correct":26},"能优化多个工程事务运行管理","BCD",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":342,"analysis":37},1107176,"MS Project主要功能包括（ ）。",[332,334,336,338,340],{"key":20,"text":333,"correct":22},"管理人员不能对项目的最终控制权保持，但能与资源和其他项目干系人交流",{"key":24,"text":335,"correct":22},"跟踪收集项目的工期.成本和资源需求",{"key":28,"text":337,"correct":22},"以标准.美观的格式形象具体地呈现项目计划",{"key":31,"text":339,"correct":26},"使用外观和操作类似桌面程序的应用来管理项目",{"key":34,"text":341,"correct":22},"与其他 Microsoft Office系统应用程序交换项目信息","ABCE",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":342,"analysis":37},1107177,"作业分类码主要用途有（ ）。",[347,349,351,353,355],{"key":20,"text":348,"correct":22},"更加方便而有效地对进度计划进行各种辅助分析",{"key":24,"text":350,"correct":22},"制作过滤器",{"key":28,"text":352,"correct":22},"生成项目控制过程中常用的视图",{"key":31,"text":354,"correct":26},"用指定代码做分组",{"key":34,"text":356,"correct":22},"加快查询的速度",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":214,"analysis":37},1107178,"下列选项中，属于MS Project的主要功能的有（ ）。",[361,363,365,367,369],{"key":20,"text":362,"correct":26},"有效控制大型、复杂工程项目",{"key":24,"text":364,"correct":22},"一致且高效地安排任务和资源",{"key":28,"text":366,"correct":22},"跟踪收集与工作有关的所有信息",{"key":31,"text":368,"correct":22},"以标准、美观的格式形象具体地呈现项目计划",{"key":34,"text":339,"correct":22},{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":67,"analysis":37},1107179,"下列选项中，属于P6的主要功能的有（ ）。",[374,376,377,379,381],{"key":20,"text":375,"correct":22},"优化、计划和管理多个工程",{"key":24,"text":362,"correct":22},{"key":28,"text":378,"correct":22},"通过电子邮件传递信息",{"key":31,"text":380,"correct":22},"连接企业信息系统，能与大量软件进行数据交换",{"key":34,"text":366,"correct":26},[383,387,390,393,396,399],{"id":384,"name":385,"category":7,"favorite":386},1,"领导干部任职前廉政法规知识测试题",92,{"id":388,"name":389,"category":7,"favorite":384},595,"建筑结构与设备",{"id":391,"name":392,"category":7,"favorite":384},715,"招标采购专业知识与法律法规",{"id":394,"name":395,"category":7,"favorite":384},848,"市政方向-通用基础",{"id":397,"name":398,"category":7,"favorite":8},534,"BIM工程师",{"id":400,"name":398,"category":7,"favorite":8},535]