[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-782-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":736},{"id":5,"name":6,"category":7,"favorite":8},782,"目标控制（水利工程）","建筑工程",0,15,50,775,[13,38,53,68,83,98,112,127,142,157,172,187,202,217,231,245,259,273,287,302,316,330,345,359,374,388,402,415,429,443,457,471,485,499,513,528,542,556,570,584,598,612,626,640,654,669,679,693,707,721],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1107104,2,"多选题","常用的骨料单价计算方法包括（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","系统单价法",true,{"key":24,"text":25,"correct":26},"B","市场询价",false,{"key":28,"text":29,"correct":22},"C","工序单价法",{"key":31,"text":32,"correct":26},"D","招标确定",{"key":34,"text":35,"correct":26},"E","模型计算","AC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1107105,"关于混凝土及砂浆材料单价，下列说法中正确的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"指拌制每m3混凝土、砂浆所需要的水泥、砂、石、水、掺和料及外加剂等各种材料的费用之和",{"key":24,"text":45,"correct":26},"不包括至搅拌楼进料仓止的材料场内运输及操作损耗费",{"key":28,"text":47,"correct":22},"不包括拌制、运输、浇筑等工序的人工、材料和机械费用",{"key":31,"text":49,"correct":22},"不包含括搅拌损耗外的施工操作损耗及超填量",{"key":34,"text":51,"correct":22},"商品混凝土的材料单价（不含增值税进项税额）按基价200元\u002Fm3计入工程单价参加取费","ACDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1107106,"施工合同按计价方式可分为（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"总价合同",{"key":24,"text":60,"correct":26},"固定价格合同",{"key":28,"text":62,"correct":22},"单价合同",{"key":31,"text":64,"correct":26},"可调价格合同",{"key":34,"text":66,"correct":22},"成本加酬金合同","ACE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1107107,"选择合同类型时，应考虑的因素有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"项目涉及的金额",{"key":24,"text":75,"correct":22},"项目的规模",{"key":28,"text":77,"correct":26},"项目准备时间长短",{"key":31,"text":79,"correct":22},"项目的技术复杂性",{"key":34,"text":81,"correct":22},"发包人的管理能力","BDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1107108,"采用工程量清单计价模式的建设项目，其工程量清单（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"与招标文件无关",{"key":24,"text":90,"correct":22},"由招标人提供",{"key":28,"text":92,"correct":22},"由招标人填写项目及工程量，投标人填入单价和合价",{"key":31,"text":94,"correct":22},"是招标文件的重要组成部分",{"key":34,"text":96,"correct":26},"不是施工承包合同的组成部分","BCD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":82,"analysis":37},1107109,"标底编制的依据包括（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":26},"工程设计文件",{"key":24,"text":105,"correct":22},"招标人提供的招标文件",{"key":28,"text":107,"correct":26},"经验数据资料",{"key":31,"text":109,"correct":22},"设备及材料市场价格",{"key":34,"text":111,"correct":22},"批准的初步设计概算或修正概算",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1107110,"关于标底，下列说法中正确的有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"标底反映社会平均先进工效和管理水平",{"key":24,"text":119,"correct":22},"标底编制必须在初步设计批复后进行，原则上对国家投资的项目，各个合同的标底之和不应突破批准的初步设计概算或修正概算",{"key":28,"text":121,"correct":26},"标底编制的方法为定额法",{"key":31,"text":123,"correct":26},"一个招标的合同项目可以编制两个标底",{"key":34,"text":125,"correct":22},"标底应体现工程自然地理条件、施工条件、工程量大小等因素","ABE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1107111,"工程量清单的内容包括（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":26},"单位工程项目清单",{"key":24,"text":134,"correct":26},"单项工程项目清单",{"key":28,"text":136,"correct":22},"分类分项工程量清单",{"key":31,"text":138,"correct":22},"措施项目清单",{"key":34,"text":140,"correct":22},"其他项目清单","CDE",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1107112,"资金使用计划的编制方法包括（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"按工程投资构成编制资金使用计划",{"key":24,"text":149,"correct":26},"按工程造价控制目标编制资金使用计划",{"key":28,"text":151,"correct":26},"按工程项目规模编制资金使用计划",{"key":31,"text":153,"correct":22},"按工程项目划分组成编制资金使用计划",{"key":34,"text":155,"correct":22},"按工程进度编制资金使用计划","ADE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":171,"analysis":37},1107113,"工程计量的方法包括（ ）。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"现场测量",{"key":24,"text":164,"correct":22},"按设计图纸计量",{"key":28,"text":166,"correct":26},"按工程量清单计量",{"key":31,"text":168,"correct":22},"按单据计算",{"key":34,"text":170,"correct":22},"仪表测量","ABDE",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":186,"analysis":37},1107114,"计量工作方式包括（ ）。",[176,178,180,182,184],{"key":20,"text":177,"correct":22},"由承包人在监理人的监督下进行计量",{"key":24,"text":179,"correct":26},"由监理人进行计量",{"key":28,"text":181,"correct":26},"由发包人进行计量",{"key":31,"text":183,"correct":22},"监理人与承包人联合计量",{"key":34,"text":185,"correct":26},"发包人代表和承包人联合计量","AD",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":201,"analysis":37},1107115,"下列费用中，包含相应项目工程单价或总价中，发包人不另行支付的有（ ）。",[191,193,195,197,199],{"key":20,"text":192,"correct":26},"塌方清理",{"key":24,"text":194,"correct":22},"植被清理",{"key":28,"text":196,"correct":22},"土方明挖超挖量",{"key":31,"text":198,"correct":22},"弃土处理",{"key":34,"text":200,"correct":22},"开采区清理、恢复和绿化","BCDE",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":216,"analysis":37},1107116,"关于质量保证金，下列说法中正确的有（ ）。",[206,208,210,212,214],{"key":20,"text":207,"correct":22},"质量保证金的计算额度不包括预付款的支付与扣回金额",{"key":24,"text":209,"correct":26},"在合同工程完工证书颁发后7天内，发包人将质量保证金总额的一半支付给承包人",{"key":28,"text":211,"correct":22},"在合同约定的缺陷责任期满时，发包人将在30个工作日内会同承包人核实承包人是否完成保修责任，如无异议，发包人将剩余的质量保证金支付给承包人",{"key":31,"text":213,"correct":22},"在合同约定的缺陷责任期（工程质量保修期）满时，承包人未完成缺陷责任的，发包人有权扣留与未履行责任剩余工作所需金额相应的质量保证金余额",{"key":34,"text":215,"correct":26},"监理人在颁发了缺陷责任证书后，若仍发现有工程缺陷，由发包人维修，剩余保留金可暂不退还","ACD",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":67,"analysis":37},1107117,"下列各项中，包括在预备费中的项目包括（ ）。",[221,223,225,227,229],{"key":20,"text":222,"correct":22},"预防自然灾害所采取的措施费用",{"key":24,"text":224,"correct":26},"地质勘测资料不准，引起地基加固、基础加深所增加的技术处理费用",{"key":28,"text":226,"correct":22},"市场材料浮动价差",{"key":31,"text":228,"correct":26},"国家规定允许调整的材料差价",{"key":34,"text":230,"correct":22},"由于图纸的一般错误而产生的经济签证费用",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":67,"analysis":37},1107118,"关于工程签证和工程洽商，下列说法中正确的有（ ）。",[235,237,239,241,243],{"key":20,"text":236,"correct":22},"工程签证可以作为合同协议附件",{"key":24,"text":238,"correct":26},"工程洽商文件不可以作为合同协议附件",{"key":28,"text":240,"correct":22},"工程签证确认的工作量具有“合同外”或“工程量清单外”的特点",{"key":31,"text":242,"correct":26},"工程洽商确认的工作量具有“合同外”或“工程量清单外”的特点",{"key":34,"text":244,"correct":22},"工程签证和工程洽商都会引发工程变更",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":201,"analysis":37},1107119,"下列各项中，属于重大设计变更的有（ ）。",[249,251,253,255,257],{"key":20,"text":250,"correct":26},"一般机电设备及金属结构设计变化",{"key":24,"text":252,"correct":22},"主要建筑物施工方案和工程总进度的变化",{"key":28,"text":254,"correct":22},"水库库容、特征水位的变化",{"key":31,"text":256,"correct":22},"工程布置、主要建筑物型式的变化",{"key":34,"text":258,"correct":22},"水利枢纽工程的施工导流方式、导流建筑物方案的变化",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":52,"analysis":37},1107120,"发包人向承包人的索赔包括（ ）。",[263,265,267,269,271],{"key":20,"text":264,"correct":22},"施工缺陷索赔",{"key":24,"text":266,"correct":26},"工程变更引起的索赔",{"key":28,"text":268,"correct":22},"发包人合理终止合同",{"key":31,"text":270,"correct":22},"工程拖期索赔",{"key":34,"text":272,"correct":22},"对指定分包商的付款索赔",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":36,"analysis":37},1107121,"根据《水利水电工程标准文件》中的合同条款，承包人可同时获得工期补偿和费用补偿，但是不能获得利润补偿的是（ ）。",[277,279,281,283,285],{"key":20,"text":278,"correct":22},"施工过程发现文物古迹",{"key":24,"text":280,"correct":26},"异常恶劣气候条件",{"key":28,"text":282,"correct":22},"承包人遇到不利物质条件",{"key":31,"text":284,"correct":26},"发包人原因引起暂停施工",{"key":34,"text":286,"correct":26},"发包人提供的材料设备不符合合同要求",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":301,"analysis":37},1107122,"一般情况下，不允许索赔的费用包括（ ）。",[291,293,295,297,299],{"key":20,"text":292,"correct":22},"承包人的索赔准备费用",{"key":24,"text":294,"correct":22},"索赔事项引起的工程计划调整费用",{"key":28,"text":296,"correct":22},"工程保险费用",{"key":31,"text":298,"correct":26},"承包商对索赔事项采取减轻措施而损失的费用",{"key":34,"text":300,"correct":22},"索赔金额在索赔处理期间的利息","ABCE",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":97,"analysis":37},1107123,"关于不可抗力造成损失的承担，下列说法中正确的有（ ）。",[306,308,310,312,314],{"key":20,"text":307,"correct":26},"运至施工场地用于施工的材料和待安装的设备的损害，由承包人承担",{"key":24,"text":309,"correct":22},"因工程损害导致第三方人员伤亡和财产损失，由发包人承担",{"key":28,"text":311,"correct":22},"发包人、承包人人员伤亡由其所在单位负责并承担相应费用",{"key":31,"text":313,"correct":22},"停工期间，承包人应发包人要求留在施工场地的必要的管理人员的费用，由发包人承担",{"key":34,"text":315,"correct":26},"工程所需的清理、修复费用，由承包人承担",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":301,"analysis":37},1107124,"根据《水利水电工程标准文件》，承包人提交的完工付款申请单应包括的内容有（ ）。",[320,322,324,326,328],{"key":20,"text":321,"correct":22},"完工结算合同总价",{"key":24,"text":323,"correct":22},"发包人已支付承包人的工程价款",{"key":28,"text":325,"correct":22},"应扣留的质量保证金",{"key":31,"text":327,"correct":26},"应返还的履约保证金",{"key":34,"text":329,"correct":22},"应支付的完工付款金额",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":344,"analysis":37},1107125,"投资局部偏差的含义包括（ ）。",[334,336,338,340,342],{"key":20,"text":335,"correct":22},"单项工程的投资偏差",{"key":24,"text":337,"correct":22},"单位工程的投资偏差",{"key":28,"text":339,"correct":22},"分部分项工程的投资偏差",{"key":31,"text":341,"correct":22},"每个控制周期所发生的投资偏差",{"key":34,"text":343,"correct":26},"建设项目的投资偏差","ABCD",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":358,"analysis":37},1107126,"下列工程索赔事项中，属于发包人向承包人索赔的有（ ）。",[349,351,353,355,357],{"key":20,"text":350,"correct":26},"地质条件变化引起的索赔",{"key":24,"text":352,"correct":26},"施工中人为障碍引起的索赔",{"key":28,"text":354,"correct":26},"加速施工费用的索赔",{"key":31,"text":356,"correct":22},"工期延误的索赔",{"key":34,"text":272,"correct":22},"DE",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":373,"analysis":37},1107127,"工程计量时，监理人应予计量的工程量有（ ）。",[363,365,367,369,371],{"key":20,"text":364,"correct":26},"承包人超出设计图纸和设计文件要求所增加的工程量",{"key":24,"text":366,"correct":22},"工程量清单中的工程量",{"key":28,"text":368,"correct":26},"有缺陷工程的工程量",{"key":31,"text":370,"correct":22},"工程变更导致增加的工程量",{"key":34,"text":372,"correct":26},"承包人原因导致返工的工程量","BD",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":171,"analysis":37},1107128,"根据《水利基本建设项目竣工财务决算编制规程》（SL 19—2014）要求，小型项目应须编制的报表包括（ ）。",[378,380,382,384,386],{"key":20,"text":379,"correct":22},"水利基本建设竣工项目概况表",{"key":24,"text":381,"correct":22},"水利基本建设项目竣工财务决算表",{"key":28,"text":383,"correct":26},"水利基本建设项目投资分析表",{"key":31,"text":385,"correct":22},"水利基本建设竣工项目未完工程投资及预留费用表",{"key":34,"text":387,"correct":22},"水利基本建设竣工项目交付使用资产表",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":156,"analysis":37},1107129,"评价的内容大体上可以分为全过程评价和阶段性评价或专项评价两类。下列各项中，属于全过程评价内容的有（ ）。",[392,394,396,398,400],{"key":20,"text":393,"correct":22},"过程评价",{"key":24,"text":395,"correct":26},"经济后评价",{"key":28,"text":397,"correct":26},"生产经营评价",{"key":31,"text":399,"correct":22},"水土保持评价",{"key":34,"text":401,"correct":22},"社会影响评价",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":358,"analysis":37},1107130,"根据《水利建设项目后评价管理办法（试行）》（水规计（2010）51 号），项目后评价中的过程评价包括（ ）等内容。",[406,407,409,411,413],{"key":20,"text":401,"correct":26},{"key":24,"text":408,"correct":26},"环境影响评价",{"key":28,"text":410,"correct":26},"财务评价",{"key":31,"text":412,"correct":22},"运行管理评价",{"key":34,"text":414,"correct":22},"建设实施评价",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":52,"analysis":37},1107131,"编制竣工财务决算应具备的条件包括（ ）。",[419,421,423,425,427],{"key":20,"text":420,"correct":22},"经批准的初步设计、项目任务书所确定的内容已完成",{"key":24,"text":422,"correct":26},"已完成全部工程投资",{"key":28,"text":424,"correct":22},"建设资金全部到位",{"key":31,"text":426,"correct":22},"竣工（完工）结算已完成",{"key":34,"text":428,"correct":22},"涉及移民安置的事项已处理完毕",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":201,"analysis":37},1107132,"建设项目进度控制基本程序包括（ ）。",[433,435,437,439,441],{"key":20,"text":434,"correct":26},"保证进度计划的严肃性与约束力",{"key":24,"text":436,"correct":22},"进度计划实施中的跟踪检查",{"key":28,"text":438,"correct":22},"对收集的资料进行整理.统计和分析",{"key":31,"text":440,"correct":22},"研究进度纠偏措施",{"key":34,"text":442,"correct":22},"进度纠偏措施的实施与监督",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":82,"analysis":37},1107133,"按照《水利水电工程标准施工招标文件（2009年版）》的规定，合同工期按照如下合同条款确定，下列表述正确的有（ ）。",[447,449,451,453,455],{"key":20,"text":448,"correct":26},"合同工期不包括按照合同约定给予的工期变更",{"key":24,"text":450,"correct":22},"开工通知是指监理人通知承包人开工的函件",{"key":28,"text":452,"correct":26},"监理人可以直接发出开工通知",{"key":31,"text":454,"correct":22},"完工日期是合同工程完工日",{"key":34,"text":456,"correct":22},"实际完工日期以合同工程完工证书中写明的日期为准",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":52,"analysis":37},1107134,"《公路水运品质工程评价标准（试行）》的组成部分包括（ ）。",[461,463,465,467,469],{"key":20,"text":462,"correct":22},"基本要求",{"key":24,"text":464,"correct":26},"评价人",{"key":28,"text":466,"correct":22},"评价指标",{"key":31,"text":468,"correct":22},"加分指标",{"key":34,"text":470,"correct":22},"总体评价",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":156,"analysis":37},1107135,"按照项目建设各阶段的特征及其对工期的控制作用，建设工期的阶段包括（ ）。",[475,477,479,481,483],{"key":20,"text":476,"correct":22},"工程准备阶段",{"key":24,"text":478,"correct":26},"工程施工阶段",{"key":28,"text":480,"correct":26},"工程评价阶段",{"key":31,"text":482,"correct":22},"工程主体阶段",{"key":34,"text":484,"correct":22},"工程完建阶段",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":52,"analysis":37},1107136,"对质量缺陷的处理需要坚持的原则包括（ ）。",[489,491,493,495,497],{"key":20,"text":490,"correct":22},"监理工程师具有质量否决权",{"key":24,"text":492,"correct":26},"施工时间紧迫，虽然前道工序有缺陷，但是可以直接进行下一道工序",{"key":28,"text":494,"correct":22},"承包人必须执行监理工程师对质量缺陷的处理意见",{"key":31,"text":496,"correct":22},"承包人对质量缺陷的处理完成后，必须接受监理工程师的检查、验收",{"key":34,"text":498,"correct":22},"质量缺陷处理须事先进行调查，分清责任，以明确处理费用的归属",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":141,"analysis":37},1107137,"根据《公路工程质量检验评定标准 第一册 土建工程》（JTG F80\u002F1—2017），施工单位应在施工准备阶段将建设项目划分为以下哪些选项？（ ）",[503,505,507,509,511],{"key":20,"text":504,"correct":26},"施工工程",{"key":24,"text":506,"correct":26},"结构工程",{"key":28,"text":508,"correct":22},"单位工程",{"key":31,"text":510,"correct":22},"分部工程",{"key":34,"text":512,"correct":22},"分项工程",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":527,"analysis":37},1107138,"公路工程施工监理阶段划分为哪些阶段？（ ）。",[517,519,521,523,525],{"key":20,"text":518,"correct":26},"施工前准备",{"key":24,"text":520,"correct":22},"施工准备",{"key":28,"text":522,"correct":22},"施工",{"key":31,"text":524,"correct":26},"施工验收",{"key":34,"text":526,"correct":22},"交工验收与缺陷责任期","BCE",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":171,"analysis":37},1107139,"建设工程进度计划的表示方法有（ ）。",[532,534,536,538,540],{"key":20,"text":533,"correct":22},"甘特图",{"key":24,"text":535,"correct":22},"工程进度曲线",{"key":28,"text":537,"correct":26},"旋风图",{"key":31,"text":539,"correct":22},"形象进度图",{"key":34,"text":541,"correct":22},"网络进度计划",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":201,"analysis":37},1107140,"下列选项，属于监理单位在进度控制中的职责与权利的有（ ）。",[546,548,550,552,554],{"key":20,"text":547,"correct":26},"确定建设工期目标",{"key":24,"text":549,"correct":22},"签发开工通知",{"key":28,"text":551,"correct":22},"审批承包人提供的施工进度计划",{"key":31,"text":553,"correct":22},"按合同规定权限处理施工暂停事宜",{"key":34,"text":555,"correct":22},"处理工期延误或提前有关事宜",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":52,"analysis":37},1107141,"下列选项属于监理工程师在工程质量监理方面主要职责的有（ ）。",[560,562,564,566,568],{"key":20,"text":561,"correct":22},"向承包人书面提供图纸中的原始基准点、基准线和基准高程等资料",{"key":24,"text":563,"correct":26},"施工过程中，用于工程的材料不符合合同要求的，可以继续使用",{"key":28,"text":565,"correct":22},"对承包人的检验、测试工作进行全面监理",{"key":31,"text":567,"correct":22},"对不符合质量要求的工程，有权要求承包人返工或采取其他补救措施",{"key":34,"text":569,"correct":22},"发各项工程的开工申请，必要时通知施工单位暂时停止整个工程或任何部分工程的施工",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":67,"analysis":37},1107142,"某工程双代号时标网络计划如下图所示（单位：天），关于时间参数的说法，正确的有（ ）。",[574,576,578,580,582],{"key":20,"text":575,"correct":22},"工作B的总时差为0",{"key":24,"text":577,"correct":26},"工作E的最早开始时间为4",{"key":28,"text":579,"correct":22},"工作D的总时差为0",{"key":31,"text":581,"correct":26},"工作I的自由时差为1天",{"key":34,"text":583,"correct":22},"工作G的总时差为2天",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":156,"analysis":37},1107143,"某分部工程双代号网络计划如图所示，绘制错误的有（ ）。",[588,590,592,594,596],{"key":20,"text":589,"correct":22},"有多个起点节点",{"key":24,"text":591,"correct":26},"有多个终点节点",{"key":28,"text":593,"correct":26},"工作代号重复",{"key":31,"text":595,"correct":22},"节点编号有误",{"key":34,"text":597,"correct":22},"有多余虚工作",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":301,"analysis":37},1107144,"下列关于单代号网络图的说法中，叙述正确的有（ ）。",[602,604,606,608,610],{"key":20,"text":603,"correct":22},"当网络图中有多项开始工作时，应增设一项虚拟的工作S",{"key":24,"text":605,"correct":22},"当网络图中有多项结束工作时，应增设一项虚拟的工作F",{"key":28,"text":607,"correct":22},"单代号网络图中，有必要时需增加虚拟起点节点和终点节点",{"key":31,"text":609,"correct":26},"绘制单代号网络图比绘制双代号网络图困难得多",{"key":34,"text":611,"correct":22},"单代号网络图中不需要增加虚箭线",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":67,"analysis":37},1107145,"某工程单代号网络计划如下图所示，其中关键工作有（ ）。",[616,618,620,622,624],{"key":20,"text":617,"correct":22},"工作A",{"key":24,"text":619,"correct":26},"工作B",{"key":28,"text":621,"correct":22},"工作C",{"key":31,"text":623,"correct":26},"工作D",{"key":34,"text":625,"correct":22},"工作E",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":141,"analysis":37},1107146,"某工程双代号网络计划中各个节点的最早时间和最迟时间如下图所示，图中表明（ ）。",[630,632,634,636,638],{"key":20,"text":631,"correct":26},"工作1—3为关键工作",{"key":24,"text":633,"correct":26},"工作2—4的总时差为2",{"key":28,"text":635,"correct":22},"工作2—5的总时差为1",{"key":31,"text":637,"correct":22},"工作3—6为关键工作",{"key":34,"text":639,"correct":22},"工作5—7的自由时差为4",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":373,"analysis":37},1107147,"某工程单代号网络计划如下图所示（图中节点上方数字为节点编号），其中关键路线有（ ）。",[644,646,648,650,652],{"key":20,"text":645,"correct":26},"1—2—3—8",{"key":24,"text":647,"correct":22},"1—2—3—6—8",{"key":28,"text":649,"correct":26},"1—2—5—6—8",{"key":31,"text":651,"correct":22},"1—2—5—7—8",{"key":34,"text":653,"correct":26},"1—4—7—8",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":668,"analysis":37},1107148,"某工程双代号时标网络计划如下图所示，由此可得正确的结论有（ ）。",[658,660,662,664,666],{"key":20,"text":659,"correct":22},"工作A为关键工作",{"key":24,"text":661,"correct":22},"工作B的自由时差为2天",{"key":28,"text":663,"correct":26},"工作C的总时差为零",{"key":31,"text":665,"correct":26},"工作D的最迟完成时间为第8天",{"key":34,"text":667,"correct":26},"工作E的最早开始时间为第2天","AB",{"id":670,"libraryId":5,"type":15,"typeLabel":16,"stem":671,"options":672,"answer":678,"analysis":37},1107149,"某工程单代号搭接网络计划如下图所示，节点中下方数字为该工作的持续时间，其中关键工作有（ ）。",[673,674,675,676,677],{"key":20,"text":617,"correct":26},{"key":24,"text":619,"correct":26},{"key":28,"text":621,"correct":22},{"key":31,"text":623,"correct":26},{"key":34,"text":625,"correct":22},"CE",{"id":680,"libraryId":5,"type":15,"typeLabel":16,"stem":681,"options":682,"answer":201,"analysis":37},1107150,"绘制单代号网络图也必须遵循的逻辑规则有（ ）。",[683,685,687,689,691],{"key":20,"text":684,"correct":26},"可以出现没有箭尾节点的箭线和没有箭头节点的箭线",{"key":24,"text":686,"correct":22},"必须正确表述已定的逻辑关系",{"key":28,"text":688,"correct":22},"严禁出现循环回路",{"key":31,"text":690,"correct":22},"严禁出现双向箭线或无箭头的连线",{"key":34,"text":692,"correct":22},"只应有一个起点节点和一个终点节点",{"id":694,"libraryId":5,"type":15,"typeLabel":16,"stem":695,"options":696,"answer":52,"analysis":37},1107151,"计划评审技术的主要内容包括（ ）。",[697,699,701,703,705],{"key":20,"text":698,"correct":22},"绘制网络图",{"key":24,"text":700,"correct":26},"计算节点的最晚预计发生时间的期望值",{"key":28,"text":702,"correct":22},"工作历时的随机分析",{"key":31,"text":704,"correct":22},"计算节点的最早允许发生时间的期望值",{"key":34,"text":706,"correct":22},"确定关键路线",{"id":708,"libraryId":5,"type":15,"typeLabel":16,"stem":709,"options":710,"answer":171,"analysis":37},1107152,"在搭接网络计划中，常见的搭接关系有（ ）。",[711,713,715,717,719],{"key":20,"text":712,"correct":22},"结束到开始的关系",{"key":24,"text":714,"correct":22},"开始到开始的关系",{"key":28,"text":716,"correct":26},"时间间隔为零的关系",{"key":31,"text":718,"correct":22},"结束到结束的关系",{"key":34,"text":720,"correct":22},"开始到结束的关系",{"id":722,"libraryId":5,"type":15,"typeLabel":16,"stem":723,"options":724,"answer":735,"analysis":37},1107153,"参数估算中，若已有各结构物的设计图纸，应根据设计图纸并考虑（ ）因素计算相应工程量。",[725,727,729,731,733],{"key":20,"text":726,"correct":22},"工程分期",{"key":24,"text":728,"correct":22},"分层",{"key":28,"text":730,"correct":22},"分段",{"key":31,"text":732,"correct":26},"新技术",{"key":34,"text":734,"correct":26},"新工艺","ABC",[737,741,744,747,750,753],{"id":738,"name":739,"category":7,"favorite":740},1,"领导干部任职前廉政法规知识测试题",92,{"id":742,"name":743,"category":7,"favorite":738},595,"建筑结构与设备",{"id":745,"name":746,"category":7,"favorite":738},715,"招标采购专业知识与法律法规",{"id":748,"name":749,"category":7,"favorite":738},848,"市政方向-通用基础",{"id":751,"name":752,"category":7,"favorite":8},534,"BIM工程师",{"id":754,"name":752,"category":7,"favorite":8},535]