[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-782-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":742},{"id":5,"name":6,"category":7,"favorite":8},782,"目标控制（水利工程）","建筑工程",0,14,50,775,[13,38,53,68,83,98,112,126,141,155,169,184,199,214,228,242,257,272,287,302,317,331,346,360,374,389,403,417,431,445,459,473,488,502,516,530,545,559,574,588,602,616,630,644,658,672,686,700,714,728],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1107053,2,"多选题","建筑材料或工程设备应当符合（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","材料出处明确",false,{"key":24,"text":25,"correct":26},"B","有产品质量检验合格证明",true,{"key":28,"text":29,"correct":26},"C","有中文标明的产品名称、生产厂名和厂址",{"key":31,"text":32,"correct":26},"D","工程设备应有产品详细的使用说明书",{"key":34,"text":35,"correct":22},"E","有中英文的详细产品功能说明书","BCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1107054,"属于发包人质量责任的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"发包人应根据国家和水利部有关规定依法设立，主动接受水利工程质量监督机构对其质量管理体系的监督检查",{"key":24,"text":45,"correct":26},"发包人应根据工程规模和工程特点，按照水利部有关规定，通过资格审查招标选择勘察设计、施工、监理及第三方检测单位，并实行合同管理",{"key":28,"text":47,"correct":22},"设计交底会议必须由发包人主持",{"key":31,"text":49,"correct":26},"发包人必须向有关的勘察、设计、施工、监理及第三方检测等单位提供与建设工程有关的原始资料",{"key":34,"text":51,"correct":26},"实行监理的建设工程，发包人应当委托具有相应资质等级的工程监理单位进行监理","ABDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1107056,"按控制主体的不同，属于建设工程质量控制的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"项目负责人的质量控制",{"key":24,"text":60,"correct":26},"政府的工程质量控制",{"key":28,"text":62,"correct":26},"发包人的质量控制",{"key":31,"text":64,"correct":26},"监理单位的质量控制",{"key":34,"text":66,"correct":26},"勘测设计单位的质量控制","BCDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1107057,"建设工程的质量特性主要表现在（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"性能",{"key":24,"text":75,"correct":22},"耐久性",{"key":28,"text":77,"correct":26},"时间性",{"key":31,"text":79,"correct":22},"持续性",{"key":34,"text":81,"correct":26},"安全性","ACE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1107058,"全面质量管理的基本观点有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"质量第一",{"key":24,"text":90,"correct":22},"重视统计量工作",{"key":28,"text":92,"correct":26},"用户至上",{"key":31,"text":94,"correct":26},"预防为主",{"key":34,"text":96,"correct":26},"用数据说话","ACDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":82,"analysis":37},1107059,"在工程建设中，质量保证的途径包括（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":26},"以检验为手段的质量保证",{"key":24,"text":105,"correct":22},"以工作人员的技术年限为质量保证",{"key":28,"text":107,"correct":26},"以工序管理为手段的质量保证",{"key":31,"text":109,"correct":22},"以资金为后续供应充足的质量保证",{"key":34,"text":111,"correct":26},"以开发新技术、新工艺、新材料、新工程产品为手段的质量保证",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":67,"analysis":37},1107060,"工程项目建设由于涉及面广，是一个极其复杂的综合过程，主要表现在以下哪些个方面？（ ）",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"项目难易程度不一",{"key":24,"text":119,"correct":26},"形成过程的复杂性",{"key":28,"text":121,"correct":26},"影响因素多",{"key":31,"text":123,"correct":26},"波动性大",{"key":34,"text":125,"correct":26},"质量隐蔽性",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},1107061,"可行性研究的具体任务包括（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":26},"项目建设的必要性研究",{"key":24,"text":133,"correct":26},"技术路线可行性研究",{"key":28,"text":135,"correct":22},"利润最大化研究",{"key":31,"text":137,"correct":26},"项目实施计划研究",{"key":34,"text":139,"correct":22},"社会价值研究","ABD",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":82,"analysis":37},1107062,"水利工程质量监督机构可分为（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":26},"总站",{"key":24,"text":148,"correct":22},"分站",{"key":28,"text":150,"correct":26},"中心站",{"key":31,"text":152,"correct":22},"省站",{"key":34,"text":154,"correct":26},"站",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":67,"analysis":37},1107063,"质量的定义是：客体的—组固有特性满足要求的程度，其中“质量”包含（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"产品特点",{"key":24,"text":162,"correct":26},"产品质量",{"key":28,"text":164,"correct":26},"某项活动的质量",{"key":31,"text":166,"correct":26},"某项过程的质量",{"key":34,"text":168,"correct":26},"质量管理体系的质量",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":183,"analysis":37},1107064,"作为我国工程管理体系中最基础的部分，对于确保工程质量也是至关重要的，是指的（ ）。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"监理人的质量保证体系",{"key":24,"text":176,"correct":22},"分包人的质量保证体系",{"key":28,"text":178,"correct":22},"建设单位的质量保证体系",{"key":31,"text":180,"correct":26},"设计人的质量保证体系",{"key":34,"text":182,"correct":26},"承包人的质量保证体系","DE",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":198,"analysis":37},1107065,"工作保证子体系的重要组成部分包括（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":22},"勘察过程的质量保证子体系",{"key":24,"text":191,"correct":26},"设计过程的质量保证子体系",{"key":28,"text":193,"correct":22},"监理过程的质量保证子体系",{"key":31,"text":195,"correct":26},"施工过程的质量保证子体系",{"key":34,"text":197,"correct":22},"分包过程的质量保证子体系","BD",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":213,"analysis":37},1107066,"质量管理体系包括（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"组织确定计划",{"key":24,"text":206,"correct":26},"组织确定目标",{"key":28,"text":208,"correct":26},"为获得期望的结果确定过程",{"key":31,"text":210,"correct":22},"为获得期望的结果确定进度",{"key":34,"text":212,"correct":26},"为获得期望的结果确定所需资源","BCE",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":97,"analysis":37},1107067,"建立质量管理体系的主要目的有（ ）。",[218,220,222,224,226],{"key":20,"text":219,"correct":26},"管理好企业内部的质量工作",{"key":24,"text":221,"correct":22},"持续稳定地提供符合用户要求的产品",{"key":28,"text":223,"correct":26},"使企业的领导对本企业的质量管理水平和质量保证能力建立信心",{"key":31,"text":225,"correct":26},"使影响产品质量的各种因素都处于受控状态",{"key":34,"text":227,"correct":26},"以最经济的方式实现产品的质量要求",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":67,"analysis":37},1107068,"在《水利工程质量管理规定》中，水利工程质量实行的质量管理体制为（ ）。",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"勘察设计单位出图",{"key":24,"text":235,"correct":26},"项目法人（建设单位）负责",{"key":28,"text":237,"correct":26},"监理单位控制",{"key":31,"text":239,"correct":26},"施工单位保证",{"key":34,"text":241,"correct":26},"政府监督",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":256,"analysis":37},1107069,"工程质量要求主要包括（ ）。",[246,248,250,252,254],{"key":20,"text":247,"correct":26},"工程合同",{"key":24,"text":249,"correct":22},"现场签证",{"key":28,"text":251,"correct":26},"设计文件",{"key":31,"text":253,"correct":26},"技术标准规范的质量标准",{"key":34,"text":255,"correct":22},"工程变更","ACD",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":271,"analysis":37},1107070,"建立、完善质量管理体系一般要经历的阶段包括（ ）。",[261,263,265,267,269],{"key":20,"text":262,"correct":26},"质量管理体系的策划与设计",{"key":24,"text":264,"correct":26},"质量管理体系文件的编制",{"key":28,"text":266,"correct":26},"质量管理体系的试运行",{"key":31,"text":268,"correct":22},"质量管理体系的验收",{"key":34,"text":270,"correct":26},"质量管理体系的审核与评审","ABCE",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":286,"analysis":37},1107071,"工程项目的可行性研究的目的是通过对拟建项目进行全面分析及多方面比较，论证该项目（ ）。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"是否符合可持续发展",{"key":24,"text":279,"correct":22},"是否满足地区规划",{"key":28,"text":281,"correct":26},"是否必须（适合）建设",{"key":31,"text":283,"correct":26},"技术上是否可靠",{"key":34,"text":285,"correct":26},"经济上是否合理","CDE",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":301,"analysis":37},1107072,"承包人质量责任包括（ ）。",[291,293,295,297,299],{"key":20,"text":292,"correct":26},"应当依法取得相应等级的资质证书，并在其资质等级许可的范围内承揽工程",{"key":24,"text":294,"correct":26},"不得将其承接的水利建设项目的主体工程进行转包",{"key":28,"text":296,"correct":26},"必须依据国家、水利行业有关工程建设法规、技术规程、技术标准的规定以及设计文件和施工合同的要求进行施工",{"key":31,"text":298,"correct":22},"按照工程建设强制性标准进行勘察、设计，并对其勘察、设计的质量负责",{"key":34,"text":300,"correct":22},"应主持或与监理机构联合主持设计交底会议","ABC",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":316,"analysis":37},1107073,"下列哪些选项属于质量保证体系的主要内容？（ ）",[306,308,310,312,314],{"key":20,"text":307,"correct":26},"有明确的质量方针、质量目标和质量计划",{"key":24,"text":309,"correct":26},"建立严格的质量责任制",{"key":28,"text":311,"correct":26},"设立专职质量管理机构和质量管理人员",{"key":31,"text":313,"correct":26},"开展群众性的质量管理活动",{"key":34,"text":315,"correct":22},"程序文件与质量记录","ABCD",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":52,"analysis":37},1107074,"下列哪些选项属于质量控制的内容？（ ）",[321,323,325,327,329],{"key":20,"text":322,"correct":26},"规定控制标准",{"key":24,"text":324,"correct":26},"制定具体的控制方法",{"key":28,"text":326,"correct":22},"开发新技术、新工艺",{"key":31,"text":328,"correct":26},"明确所采用的检验方法",{"key":34,"text":330,"correct":26},"实际进行检验",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":345,"analysis":37},1107075,"投资按其形成资产的性质，可分为（ ）。",[335,337,339,341,343],{"key":20,"text":336,"correct":26},"固定资产投资",{"key":24,"text":338,"correct":22},"直接投资",{"key":28,"text":340,"correct":22},"长期投资",{"key":31,"text":342,"correct":26},"流动资产投资",{"key":34,"text":344,"correct":22},"间接投资","AD",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":301,"analysis":37},1107076,"投资一般是指经济主体为获取经济效益而垫付货币资金或其他资源用于某些事业的经济活动过程。按照不同的划分方法，投资有不同的分类，下列选项中属于直接投资的有（ ）。",[350,352,354,356,358],{"key":20,"text":351,"correct":26},"房地产投资",{"key":24,"text":353,"correct":26},"生产存货投资",{"key":28,"text":355,"correct":26},"收藏品",{"key":31,"text":357,"correct":22},"期货投资",{"key":34,"text":359,"correct":22},"信托投资",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":82,"analysis":37},1107077,"下列关于建设项目投资控制的说法中，不正确的有（ ）。",[364,366,368,370,372],{"key":20,"text":365,"correct":26},"项目投资控制的重点在于施工阶段",{"key":24,"text":367,"correct":22},"项目作出投资决策后，控制项目投资的关键在于设计",{"key":28,"text":369,"correct":26},"建设项目投资控制工作的目标是使建设项目整个寿命周期投资总额最小",{"key":31,"text":371,"correct":22},"建设项目的投资、工期与质量三者是辩证统一的关系，它们是相互依存和影响的",{"key":34,"text":373,"correct":26},"建设项目投资控制只考虑工程建设投资",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":388,"analysis":37},1107078,"下列属于我国项目监理机构在施工阶段投资控制主要工作内容的有（ ）。",[378,380,382,384,386],{"key":20,"text":379,"correct":22},"全面分析、论证建设项目在技术、经济和施工上的可行性",{"key":24,"text":381,"correct":26},"对建设项目投资目标进行风险分析，制定防范性对策",{"key":28,"text":383,"correct":22},"选择合理的合同计价方式，合理确定工程承包合同价格",{"key":31,"text":385,"correct":26},"控制工程计量与支付",{"key":34,"text":387,"correct":26},"控制工程变更","BDE",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":271,"analysis":37},1107079,"下列各项中，属于企业管理费的有（ ）。",[393,395,397,399,401],{"key":20,"text":394,"correct":26},"职工福利费",{"key":24,"text":396,"correct":26},"办公费",{"key":28,"text":398,"correct":26},"管理人员工资",{"key":31,"text":400,"correct":22},"材料保管部门人员工资",{"key":34,"text":402,"correct":26},"城市维护建设税",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":82,"analysis":37},1107080,"下列各项中，属于直接费的有（ ）。",[407,409,411,413,415],{"key":20,"text":408,"correct":26},"施工机械使用费",{"key":24,"text":410,"correct":22},"固定资产使用费",{"key":28,"text":412,"correct":26},"材料费",{"key":31,"text":414,"correct":22},"工具用具使用费",{"key":34,"text":416,"correct":26},"临时设施费",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":82,"analysis":37},1107081,"下列关于设备原价的说法中，正确的有（ ）。",[421,423,425,427,429],{"key":20,"text":422,"correct":26},"国产设备的原价为其出厂价",{"key":24,"text":424,"correct":22},"进口设备以到岸价为原价",{"key":28,"text":426,"correct":26},"进口设备以到岸价和进口征收的税金、手续费、商检费及港口费等各项费用之和为原价",{"key":31,"text":428,"correct":22},"大型机组及其他大型设备分瓣运至工地后的拼装费用，不包括在设备原价内",{"key":34,"text":430,"correct":26},"大型机组及其他大型设备分瓣运至工地后的拼装费用，应包括在设备原价内",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":140,"analysis":37},1107082,"独立费用包括（ ）。",[435,437,439,441,443],{"key":20,"text":436,"correct":26},"生产准备费",{"key":24,"text":438,"correct":26},"建设管理费",{"key":28,"text":440,"correct":22},"冬雨季施工增加费",{"key":31,"text":442,"correct":26},"工程建设监理费",{"key":34,"text":444,"correct":22},"技术转让费",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":140,"analysis":37},1107083,"建设管理费包括（ ）。",[449,451,453,455,457],{"key":20,"text":450,"correct":26},"项目管理费",{"key":24,"text":452,"correct":26},"建设单位开办费",{"key":28,"text":454,"correct":22},"生产及管理单位提前进厂费",{"key":31,"text":456,"correct":26},"建设单位人员费",{"key":34,"text":458,"correct":22},"工程勘测设计费",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":271,"analysis":37},1107084,"计算水利工程造价时，应从工程项目总投资中扣除的包括（ ）。",[463,465,467,469,471],{"key":20,"text":464,"correct":26},"劳保支出",{"key":24,"text":466,"correct":26},"施工机械设备购置费",{"key":28,"text":468,"correct":26},"生产职工培训费",{"key":31,"text":470,"correct":22},"建设期融资利息",{"key":34,"text":472,"correct":26},"与工程无直接关系的工程投资",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":487,"analysis":37},1107085,"下列费用中，属于建筑工程费的有（ ）。",[477,479,481,483,485],{"key":20,"text":478,"correct":26},"供暖、暖气、煤气等设备装设、油饰工程的费用",{"key":24,"text":480,"correct":22},"动力、起重等各种需要安装的机械设备的装配费用",{"key":28,"text":482,"correct":26},"设备基础、支柱等设施工程和金属结构工程费用",{"key":31,"text":484,"correct":22},"与设备相连的工作台、梯子、栏杆等设施的工程费用",{"key":34,"text":486,"correct":22},"对系统设备进行单机试运行工作的投资","AC",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":213,"analysis":37},1107086,"下列各项中，属于采购及保管费用的有（ ）。",[492,494,496,498,500],{"key":20,"text":493,"correct":22},"装卸费",{"key":24,"text":495,"correct":26},"采购保管部门工作人员的工资",{"key":28,"text":497,"correct":26},"转运站的运行费",{"key":31,"text":499,"correct":22},"包装绑扎费",{"key":34,"text":501,"correct":26},"仓库的固定资产折旧费",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":82,"analysis":37},1107087,"关于现金流量图，下列说法中正确的有（ ）。",[506,508,510,512,514],{"key":20,"text":507,"correct":26},"现金流量图用来表示各现金流入流出与相应时间的对应关系",{"key":24,"text":509,"correct":22},"项目计算期指的是项目的运行期",{"key":28,"text":511,"correct":26},"横轴表示一个从0开始到以的时间序列，每个刻度表示一个时间单位",{"key":31,"text":513,"correct":22},"建设开始年为计算期的第0年",{"key":34,"text":515,"correct":26},"相对于时间坐标的垂直线代表不同时间点的现金流量大小",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":82,"analysis":37},1107088,"工程经济评价应遵循的原则包括（ ）。",[520,522,524,526,528],{"key":20,"text":521,"correct":26},"效益与费用计算口径对应一致的原则",{"key":24,"text":523,"correct":22},"动态分析与静态分析相结合，以静态分析为主的原则",{"key":28,"text":525,"correct":26},"动态分析与静态分析相结合，以动态分析为主的原则",{"key":31,"text":527,"correct":22},"定量分析与定性分析相结合，以定性分析为主",{"key":34,"text":529,"correct":26},"定量分析与定性分析相结合，以定量分析为主",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":544,"analysis":37},1107089,"国民经济评价指标主要包括（ ）。",[534,536,538,540,542],{"key":20,"text":535,"correct":26},"经济内部收益率",{"key":24,"text":537,"correct":26},"经济效益费用比",{"key":28,"text":539,"correct":22},"总投资收益率",{"key":31,"text":541,"correct":22},"项目资本金利润率",{"key":34,"text":543,"correct":22},"投资回收期","AB",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":67,"analysis":37},1107090,"下列各项中，属于财务评价内容的有（ ）。",[549,551,553,555,557],{"key":20,"text":550,"correct":22},"融资能力分析",{"key":24,"text":552,"correct":26},"盈利能力分析",{"key":28,"text":554,"correct":26},"偿债能力分析",{"key":31,"text":556,"correct":26},"财务生存能力分析",{"key":34,"text":558,"correct":26},"不确定性分析",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":573,"analysis":37},1107091,"下列关于效益比选法的说法中，正确的有（ ）。",[563,565,567,569,571],{"key":20,"text":564,"correct":22},"净现值比较法用于寿命期不同的互斥方案的比选",{"key":24,"text":566,"correct":22},"比较净现值时可以采用不同的折现率",{"key":28,"text":568,"correct":26},"净年值比较法用于寿命期不同的互斥方案的比选",{"key":31,"text":570,"correct":26},"差额投资财务内部收益率法用于寿命期相同的互斥方案的比选",{"key":34,"text":572,"correct":22},"当差额投资财务内部收益率小于设定的基准收益率时，以投资大的方案为优","CD",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":82,"analysis":37},1107092,"下列关于概率树分析的说法中，正确的有（ ）。",[578,580,582,584,586],{"key":20,"text":579,"correct":26},"经济评价的概率分析主要是主观概率分析",{"key":24,"text":581,"correct":22},"概率树分析是一种定性分析方法",{"key":28,"text":583,"correct":26},"通常假定风险变量之间是相互独立",{"key":31,"text":585,"correct":22},"财务（经济）净现值大于等于零的累计概率值越大，风险越大",{"key":34,"text":587,"correct":26},"期望净现值为各加权净现值之和",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":256,"analysis":37},1107093,"项目建议书的主要内容包括（ ）。",[592,594,596,598,600],{"key":20,"text":593,"correct":26},"论证项目建设的必要性",{"key":24,"text":595,"correct":22},"进行环境影响预测评价",{"key":28,"text":597,"correct":26},"编制投资估算",{"key":31,"text":599,"correct":26},"提出资金筹措方案",{"key":34,"text":601,"correct":22},"确定消防设计方案和主要设施",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":97,"analysis":37},1107094,"关于企业债券融资的特点，下列说法中正确的有（ ）。",[606,608,610,612,614],{"key":20,"text":607,"correct":26},"发债条件严格",{"key":24,"text":609,"correct":22},"利率高于银行贷款利率",{"key":28,"text":611,"correct":26},"发行费用较高",{"key":31,"text":613,"correct":26},"手续复杂",{"key":34,"text":615,"correct":26},"筹资对象广、市场大",{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":573,"analysis":37},1107095,"适用于资金需求大，偿债能力较强的建设项目的债务筹资方式有（ ）。",[620,622,624,626,628],{"key":20,"text":621,"correct":22},"政策性银行贷款",{"key":24,"text":623,"correct":22},"国际金融组织贷款",{"key":28,"text":625,"correct":26},"银团贷款",{"key":31,"text":627,"correct":26},"企业债券",{"key":34,"text":629,"correct":22},"融资租赁",{"id":631,"libraryId":5,"type":15,"typeLabel":16,"stem":632,"options":633,"answer":301,"analysis":37},1107096,"可行性研究阶段编制投资估算与编制设计概算是相同的有（ ）等。",[634,636,638,640,642],{"key":20,"text":635,"correct":26},"组成内容",{"key":24,"text":637,"correct":26},"项目划分",{"key":28,"text":639,"correct":26},"费用构成",{"key":31,"text":641,"correct":22},"编制方法",{"key":34,"text":643,"correct":22},"计算标准",{"id":645,"libraryId":5,"type":15,"typeLabel":16,"stem":646,"options":647,"answer":271,"analysis":37},1107097,"水利PPP 项目实施程序主要包括（ ）等。",[648,650,652,654,656],{"key":20,"text":649,"correct":26},"项目论证",{"key":24,"text":651,"correct":26},"项目储备",{"key":28,"text":653,"correct":26},"社会资本方选择",{"key":31,"text":655,"correct":22},"设备采购",{"key":34,"text":657,"correct":26},"项目执行",{"id":659,"libraryId":5,"type":15,"typeLabel":16,"stem":660,"options":661,"answer":82,"analysis":37},1107098,"关于可行性研究报告的审查与批复，下列说法中不正确的有（ ）。",[662,664,666,668,670],{"key":20,"text":663,"correct":26},"中央大中型水利基本建设项目的可行性研究报告由水利部或委托流域机构组织技术审查",{"key":24,"text":665,"correct":22},"大中型水利基本建设项目的可行性研究报告，经技术审查后，由水利部提出审查意见，报国家发展改革委审批",{"key":28,"text":667,"correct":26},"可行性研究报告批准后，未能在3年内按条件报送下一程序文件的，重新编报可行性研究报告即可",{"key":31,"text":669,"correct":22},"总投资1亿元的病险水库除险加固，可直接编制初步设计报告",{"key":34,"text":671,"correct":26},"总库容10亿m3的病险水库除险加固，必须编制可行性研究报告申请立项",{"id":673,"libraryId":5,"type":15,"typeLabel":16,"stem":674,"options":675,"answer":388,"analysis":37},1107099,"为控制工程投资，设计单位要对审查批准的工程静态总投资（不包括建设单位、地方承担的项目，下同）超过相应限额承担经济责任，其责任范围包括（ ）。",[676,678,680,682,684],{"key":20,"text":677,"correct":22},"工资物价调整后的价差",{"key":24,"text":679,"correct":26},"场内施工交通工程发生的量差造成的投资增加",{"key":28,"text":681,"correct":22},"土地征用费标准改变",{"key":31,"text":683,"correct":26},"因水库淹没实物指标调增造成的费用增加",{"key":34,"text":685,"correct":26},"工程科研试验费用超出",{"id":687,"libraryId":5,"type":15,"typeLabel":16,"stem":688,"options":689,"answer":301,"analysis":37},1107100,"在价值工程中，提高产品价值的途径有（ ）。",[690,692,694,696,698],{"key":20,"text":691,"correct":26},"成本不变，提高功能",{"key":24,"text":693,"correct":26},"功能不变，降低成本",{"key":28,"text":695,"correct":26},"降低成本，提高功能",{"key":31,"text":697,"correct":22},"降低功能，提高成本",{"key":34,"text":699,"correct":22},"功能小提高，成本大提高",{"id":701,"libraryId":5,"type":15,"typeLabel":16,"stem":702,"options":703,"answer":301,"analysis":37},1107101,"下列各项中，属于施工机械台时费中的一类费用的有（ ）。",[704,706,708,710,712],{"key":20,"text":705,"correct":26},"折旧费",{"key":24,"text":707,"correct":26},"大修理费",{"key":28,"text":709,"correct":26},"经常性修理费",{"key":31,"text":711,"correct":22},"燃料消耗量",{"key":34,"text":713,"correct":22},"动力消耗量",{"id":715,"libraryId":5,"type":15,"typeLabel":16,"stem":716,"options":717,"answer":271,"analysis":37},1107102,"提高设计经济合理性的方法包括（ ）。",[718,720,722,724,726],{"key":20,"text":719,"correct":26},"设计方案竞赛",{"key":24,"text":721,"correct":26},"标准设计",{"key":28,"text":723,"correct":26},"限额设计",{"key":31,"text":725,"correct":22},"严格变更",{"key":34,"text":727,"correct":26},"价值工程",{"id":729,"libraryId":5,"type":15,"typeLabel":16,"stem":730,"options":731,"answer":140,"analysis":37},1107103,"关于价值工程的说法，正确的有（ ）。",[732,734,736,738,740],{"key":20,"text":733,"correct":26},"价值工程的核心是对产品进行功能分析",{"key":24,"text":735,"correct":26},"价值工程涉及价值、功能和寿命周期成本三要素",{"key":28,"text":737,"correct":22},"价值工程应以提高产品的功能为出发点",{"key":31,"text":739,"correct":26},"价值工程是以提高产品的价值为目标",{"key":34,"text":741,"correct":22},"价值工程强调选择最低寿命周期成本的产品",[743,747,750,753,756,759],{"id":744,"name":745,"category":7,"favorite":746},1,"领导干部任职前廉政法规知识测试题",92,{"id":748,"name":749,"category":7,"favorite":744},595,"建筑结构与设备",{"id":751,"name":752,"category":7,"favorite":744},715,"招标采购专业知识与法律法规",{"id":754,"name":755,"category":7,"favorite":744},848,"市政方向-通用基础",{"id":757,"name":758,"category":7,"favorite":8},534,"BIM工程师",{"id":760,"name":758,"category":7,"favorite":8},535]