[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-782-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":728},{"id":5,"name":6,"category":7,"favorite":8},782,"目标控制（水利工程）","建筑工程",0,11,50,775,[13,38,53,68,83,96,110,124,138,150,161,175,189,204,219,233,247,262,276,291,305,320,335,349,363,378,392,406,420,434,449,463,477,491,505,519,533,547,560,575,589,603,615,629,643,657,671,686,700,714],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1106903,2,"多选题","工程施工招标文件的主要内容包括（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","技术标投标函及投标函附录",false,{"key":24,"text":25,"correct":26},"B","招标公告或投标邀请书",true,{"key":28,"text":29,"correct":26},"C","投标人须知",{"key":31,"text":32,"correct":26},"D","技术条款",{"key":34,"text":35,"correct":26},"E","设计图纸","BCDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1106904,"勘察、设计招标文件应当包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"投标须知",{"key":24,"text":45,"correct":26},"投标文件格式及主要合同条款",{"key":28,"text":47,"correct":26},"勘察设计基础资料",{"key":31,"text":49,"correct":22},"法定代表人身份证明或授权委托书",{"key":34,"text":51,"correct":26},"对投标人资格审查的标准","ABCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1106905,"勘察、设计招标质量控制，主要是对勘察、设计投标文件内容是否满足招标文件的要求进行评审，主要评审的方面包括（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"勘察、设计单位资格评审",{"key":24,"text":60,"correct":22},"勘察、设计方案评审",{"key":28,"text":62,"correct":26},"资信业绩评审",{"key":31,"text":64,"correct":26},"类似项目业绩、获奖情况评审",{"key":34,"text":66,"correct":26},"勘察、设计工作方案评审","ACDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1106906,"工程施工招标质量控制，主要评审内容包括（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"技术性评审",{"key":24,"text":75,"correct":22},"二次评审",{"key":28,"text":77,"correct":26},"投标人资格评审",{"key":31,"text":79,"correct":26},"初步评审",{"key":34,"text":81,"correct":26},"详细评审","CDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":95,"analysis":37},1106907,"材料、设备招标文件内容包括（ ）。",[87,89,90,91,93],{"key":20,"text":88,"correct":22},"资产负债表",{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":26},{"key":31,"text":92,"correct":26},"图纸及设计资料附件",{"key":34,"text":94,"correct":22},"投标人义务","BCD",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":67,"analysis":37},1106908,"技术评审主要包括（ ）。",[100,102,104,106,108],{"key":20,"text":101,"correct":26},"技术经济指标",{"key":24,"text":103,"correct":22},"安全性和环境效益",{"key":28,"text":105,"correct":26},"生产同类产品的经验",{"key":31,"text":107,"correct":26},"可靠性和使用寿命",{"key":34,"text":109,"correct":26},"检修条件及售后服务",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":36,"analysis":37},1106909,"勘察工作主要内容包括（ ）。",[114,116,118,120,122],{"key":20,"text":115,"correct":22},"设备、材料勘察",{"key":24,"text":117,"correct":26},"自然条件观测",{"key":28,"text":119,"correct":26},"地形图测绘",{"key":31,"text":121,"correct":26},"资源探测",{"key":34,"text":123,"correct":26},"岩土工程勘察",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":52,"analysis":37},1106910,"招投标阶段，对施工承包人资格审核的内容包括（ ）等内容。",[128,130,132,134,136],{"key":20,"text":129,"correct":26},"施工承包人的资质等级",{"key":24,"text":131,"correct":26},"施工承包人的信誉",{"key":28,"text":133,"correct":26},"施工承包人业绩",{"key":31,"text":135,"correct":22},"施工承包人企业的所有制性质",{"key":34,"text":137,"correct":26},"项目经理资格",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":52,"analysis":37},1106911,"招标人应当根据招标项目的特点和需要编制招标文件，其内容包括（ ）。",[142,143,144,146,148],{"key":20,"text":43,"correct":26},{"key":24,"text":45,"correct":26},{"key":28,"text":145,"correct":26},"勘察设计范围，对勘察设计进度.阶段和深度要求",{"key":31,"text":147,"correct":22},"投标保证金",{"key":34,"text":149,"correct":26},"勘察设计费用支付方式，对未中标人是否给予补偿及补偿标准",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":52,"analysis":37},1106912,"在工程施工招标阶段，招标文件的主要内容有（ ）。",[154,155,156,158,160],{"key":20,"text":25,"correct":26},{"key":24,"text":29,"correct":26},{"key":28,"text":157,"correct":26},"合同主要条款",{"key":31,"text":159,"correct":22},"工程量清单",{"key":34,"text":35,"correct":26},{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":52,"analysis":37},1106913,"设计阶段的设计内容主要有（ ）。",[165,167,169,171,173],{"key":20,"text":166,"correct":26},"初步设计",{"key":24,"text":168,"correct":26},"施工图设计",{"key":28,"text":170,"correct":26},"工程概算",{"key":31,"text":172,"correct":22},"工程决算",{"key":34,"text":174,"correct":26},"工程预算",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":95,"analysis":37},1106914,"在必须进行招标范围内的工程建设项目，下列选项中，必须招标的有（ ）。",[179,181,183,185,187],{"key":20,"text":180,"correct":22},"施工单项合同估算价在100万元人民币以上",{"key":24,"text":182,"correct":26},"施工单项合同估算价在400万元人民币以上",{"key":28,"text":184,"correct":26},"重要设备的采购，单项合同估算价在200万元人民币以上",{"key":31,"text":186,"correct":26},"勘察、设计、监理等服务的采购，单项合同估算价在100万元人民币以上",{"key":34,"text":188,"correct":22},"勘察、设计、监理等服务的采购，单项合同估算价在200万元人民币以上",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":203,"analysis":37},1106915,"以下需要旁站监理的工程有（ ）。",[193,195,197,199,201],{"key":20,"text":194,"correct":26},"土石方填筑工程的土料",{"key":24,"text":196,"correct":26},"碾压混凝土工程",{"key":28,"text":198,"correct":26},"预应力混凝土工程的混凝土浇筑工序",{"key":31,"text":200,"correct":22},"墙面抹灰工程",{"key":34,"text":202,"correct":22},"降水工程","ABC",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":218,"analysis":37},1106916,"影响施工阶段质量的因素包括（ ）。",[208,210,212,214,216],{"key":20,"text":209,"correct":26},"人员",{"key":24,"text":211,"correct":26},"材料",{"key":28,"text":213,"correct":26},"机械",{"key":31,"text":215,"correct":26},"环境",{"key":34,"text":217,"correct":22},"资金","ABCD",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":36,"analysis":37},1106917,"对施工图纸的核查应侧重（ ）。",[223,225,227,229,231],{"key":20,"text":224,"correct":22},"是否经相关负责人签字盖章",{"key":24,"text":226,"correct":26},"是否经设计单位正式签署",{"key":28,"text":228,"correct":26},"施工图纸与招标图纸是否一致",{"key":31,"text":230,"correct":26},"地下构筑物、障碍物、管线是否探明并标注清楚",{"key":34,"text":232,"correct":26},"总平面布置图与施工图纸的位置、几何尺寸、标高等是否一致",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":52,"analysis":37},1106918,"施工准确阶段，发包人的准备工作有（ ）。",[237,239,241,243,245],{"key":20,"text":238,"correct":26},"首批开工项目施工图纸和文件的供应",{"key":24,"text":240,"correct":26},"测量基准点的移交",{"key":28,"text":242,"correct":26},"施工用地的提供",{"key":31,"text":244,"correct":22},"工程量清单的核对",{"key":34,"text":246,"correct":26},"施工合同中约定应由发包人提供的道路、供电、供水、通信等条件",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":261,"analysis":37},1106919,"以下属于检查承包人质量保证体系的内容的有（ ）。",[251,253,255,257,259],{"key":20,"text":252,"correct":26},"是否明确质量方针、质量目标",{"key":24,"text":254,"correct":26},"是否设置专门的质量检查机构",{"key":28,"text":256,"correct":22},"是否按合同约定的内容和期限，编制工程进度保证措施文件",{"key":31,"text":258,"correct":26},"质量检验制度和质量检测手段等是否落实",{"key":34,"text":260,"correct":22},"是否明确质量检查人员以及时间节点","ABD",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":67,"analysis":37},1106920,"对于调试工作质量控制可分为（ ）。",[266,268,270,272,274],{"key":20,"text":267,"correct":26},"质量检查阶段",{"key":24,"text":269,"correct":22},"生产性介质投料的联合试运转阶段",{"key":28,"text":271,"correct":26},"单体调试阶段",{"key":31,"text":273,"correct":26},"有负荷调试",{"key":34,"text":275,"correct":26},"无负荷或非生产性介质投料的联合调试",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":290,"analysis":37},1106921,"以下关于发包人提供的材料和工程设备的质量控制的说法，正确的有（ ）。",[280,282,284,286,288],{"key":20,"text":281,"correct":22},"发包人提供的材料和工程设备，应在通用合同条款中写明材料和工程设备的名称等信息",{"key":24,"text":283,"correct":26},"承包人应根据合同进度计划的安排，向监理机构报送要求发包人交货的日期计划",{"key":28,"text":285,"correct":22},"发包人应在材料和工程设备到货14天前通知承包人",{"key":31,"text":287,"correct":26},"发包人要求向承包人提前交货的，承包人不得拒绝",{"key":34,"text":289,"correct":26},"承包人要求更改交货日期或地点的，应事先报请监理机构批准","BDE",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":95,"analysis":37},1106922,"以下属于施工管理环境因素的有（ ）。",[295,297,299,301,303],{"key":20,"text":296,"correct":22},"设计图纸及质量评定标准",{"key":24,"text":298,"correct":26},"质量保证体系",{"key":28,"text":300,"correct":26},"质量管理制度",{"key":31,"text":302,"correct":26},"三检制",{"key":34,"text":304,"correct":22},"工程地质",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":319,"analysis":37},1106923,"进行工序质量控制时，应着重（ ）。",[309,311,313,315,317],{"key":20,"text":310,"correct":26},"及时检验工序活动效果的质量",{"key":24,"text":312,"correct":26},"严格遵守工艺规程",{"key":28,"text":314,"correct":22},"质量管理人员的水平",{"key":31,"text":316,"correct":26},"主动控制工序活动条件的质量",{"key":34,"text":318,"correct":26},"设置质量控制要点","ABDE",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":334,"analysis":37},1106924,"土方碾压施工工艺试验的质量控制目的主要有（ ）。",[324,326,328,330,332],{"key":20,"text":325,"correct":26},"核实填筑土料室内击实试验结果的合理性",{"key":24,"text":327,"correct":22},"确保符合施工的工艺流程",{"key":28,"text":329,"correct":26},"检查压实机具的性能是否满足施工要求",{"key":31,"text":331,"correct":26},"选定合理的施工压实参数",{"key":34,"text":333,"correct":22},"满足业主方要求","ACD",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":218,"analysis":37},1106925,"关于平面闸门安装的说法，正确的有（ ）。",[339,341,343,345,347],{"key":20,"text":340,"correct":26},"整体闸门在安装前，应对其各项尺寸进行复核",{"key":24,"text":342,"correct":26},"节间如采用螺栓连接，则螺栓应均匀拧紧，节间橡皮的压缩量应符合设计要求",{"key":28,"text":344,"correct":26},"止水橡皮的螺栓孔位置应与门叶和止水压板上的螺栓孔位置一致，孔径应比螺栓直径小1mm",{"key":31,"text":346,"correct":26},"止水橡皮厚度极限偏差为±1mm",{"key":34,"text":348,"correct":22},"止水橡皮安装后，两侧止水中心距离和顶止水中心至底止水底缘距离的极限偏差为±5mm",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":67,"analysis":37},1106926,"以下属于设备安装过程检查项目的有（ ）。",[353,355,357,359,361],{"key":20,"text":354,"correct":26},"设备基础",{"key":24,"text":356,"correct":22},"运输设备车量",{"key":28,"text":358,"correct":26},"设备调平找正",{"key":31,"text":360,"correct":26},"设备复查",{"key":34,"text":362,"correct":26},"二次灌浆",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":377,"analysis":37},1106927,"关于地下洞室开挖的技术要求，正确的有（ ）。",[367,369,371,373,375],{"key":20,"text":368,"correct":26},"洞口掘进前，应仔细勘察山坡岩石的稳定性，并按监理机构的指示，对危险部位进行处理和支护",{"key":24,"text":370,"correct":22},"洞口削坡应自下而上进行，严禁上下垂直作业",{"key":28,"text":372,"correct":22},"平洞开挖有条件时，应优先采用分块开挖方法",{"key":31,"text":374,"correct":26},"竖井与斜井的开挖方法，可根据其断面尺寸、深度、倾角、围岩特性及施工设备等条件选定",{"key":34,"text":376,"correct":26},"进洞前，须对洞脸岩体进行鉴定，确认稳定或采取措施后，方可开挖洞口","ADE",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":218,"analysis":37},1106928,"关于坍落度的检测的要求，正确的有（ ）。",[382,384,386,388,390],{"key":20,"text":383,"correct":26},"按施工图纸的规定和监理机构的指示，每班应进行现场混凝土坍落度的检测",{"key":24,"text":385,"correct":26},"出机口应检测4次",{"key":28,"text":387,"correct":26},"仓面应检测2次",{"key":31,"text":389,"correct":26},"混凝土的坍落度，由根据建筑物的性质、钢筋含量、混凝土的运输、浇筑方法和气候条件决定，尽可能采用小的坍落度",{"key":34,"text":391,"correct":22},"当混凝土拌和物的坍落度大于100mm时，用钢尺测量混凝土扩展后最终的最大直径和最小直径，当二者的差小于30mm时，用其算术平均值作为坍落扩展度值",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":261,"analysis":37},1106929,"以下关于基础面混凝土浇筑技术的要求，正确的有（ ）。",[396,398,400,402,404],{"key":20,"text":397,"correct":26},"建筑物建基面必须验收合格后，方可进行混凝土浇筑",{"key":24,"text":399,"correct":26},"岩基上的杂物、泥土及松动岩石均应清除，应冲洗干净并排干积水",{"key":28,"text":401,"correct":22},"清洗后的基础岩面在混凝土浇筑后应保持洁净和湿润",{"key":31,"text":403,"correct":26},"易风化的岩基及软基，在立模扎筋前应处理好地基临时保护层",{"key":34,"text":405,"correct":22},"基岩面浇筑仓，在浇筑第一层混凝土前，必须先铺一层1～2cm的水泥砂浆，砂浆水灰比应与混凝土浇筑强度相适应",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":261,"analysis":37},1106930,"工程材料是工程建设的物质条件， 是工程质量的基础， 工程材料包括（ ）。",[410,412,414,416,418],{"key":20,"text":411,"correct":26},"建筑材料",{"key":24,"text":413,"correct":26},"构配件",{"key":28,"text":415,"correct":22},"施工机具设备",{"key":31,"text":417,"correct":26},"半成品",{"key":34,"text":419,"correct":22},"各类测量仪器",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":67,"analysis":37},1106931,"根据工程监理规范， 项目监理机构针对工程施工质量进行巡视的内容有（ ）。",[424,426,428,430,432],{"key":20,"text":425,"correct":26},"按设计文件、工程建设标准施工的情况",{"key":24,"text":427,"correct":22},"工程施工质量专题会议召开情况",{"key":28,"text":429,"correct":26},"使用工程材料、构配件的合格情况",{"key":31,"text":431,"correct":26},"特种作业人员持证上岗情况",{"key":34,"text":433,"correct":26},"施工现场管理人员到位情况",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":448,"analysis":37},1106932,"为完成合同约定的各项工作，承包人应向施工场地派遣或雇佣足够数量的人员，其中包括（ ）。",[438,440,442,444,446],{"key":20,"text":439,"correct":22},"具有相应规模的农民工",{"key":24,"text":441,"correct":26},"具有相应资格的专业技工和合格的普工",{"key":28,"text":443,"correct":26},"具有相应施工经验的技术人员",{"key":31,"text":445,"correct":22},"具有相应资质的检验检测人员",{"key":34,"text":447,"correct":26},"具有相应岗位资格的各级管理人员","BCE",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":203,"analysis":37},1106933,"除专用合同条款另有约定外，应由监理机构组织发包人按合同进行交货和验收的有（ ）。",[453,455,457,459,461],{"key":20,"text":454,"correct":26},"水工金属结构",{"key":24,"text":456,"correct":26},"启闭机",{"key":28,"text":458,"correct":26},"机电产品",{"key":31,"text":460,"correct":22},"水泥",{"key":34,"text":462,"correct":22},"钢材",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":377,"analysis":37},1106934,"在工程项整个建设周期内，属于施工方法质量控制内容的有（ ）。",[467,469,471,473,475],{"key":20,"text":468,"correct":26},"技术方案",{"key":24,"text":470,"correct":22},"专家论证",{"key":28,"text":472,"correct":22},"合同措施",{"key":31,"text":474,"correct":26},"检测手段",{"key":34,"text":476,"correct":26},"施工组织设计",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":52,"analysis":37},1106935,"水利工程常见的工艺试验有（ ）。",[481,483,485,487,489],{"key":20,"text":482,"correct":26},"钢筋连接工艺试验",{"key":24,"text":484,"correct":26},"锚杆施工工艺试验",{"key":28,"text":486,"correct":26},"钻孔灌注桩工艺试验",{"key":31,"text":488,"correct":22},"混凝土搅拌工艺试验",{"key":34,"text":490,"correct":26},"土工膜焊接工艺试验",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":290,"analysis":37},1106936,"闸门安装质量验收时，安装验收的主要工作有（ ）。",[495,497,499,501,503],{"key":20,"text":496,"correct":22},"检查是否符合设计图纸及相关规范要求",{"key":24,"text":498,"correct":26},"检查闸门和埋件安装是否符合设计要求",{"key":28,"text":500,"correct":22},"观感质量要求",{"key":31,"text":502,"correct":26},"检查闸门和埋件安装质量是否符合规范和有关技术标准的要求",{"key":34,"text":504,"correct":26},"对遗留问题提出处理意见",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":67,"analysis":37},1106937,"任何部位混凝土开始浇筑前，承包人必须通知监理机构对浇筑部位的准备工作进行检查，其中检查内容包括（ ）。",[509,511,513,515,517],{"key":20,"text":510,"correct":26},"地基处理",{"key":24,"text":512,"correct":22},"加热系统",{"key":28,"text":514,"correct":26},"已浇筑混凝土面的清理以及模板",{"key":31,"text":516,"correct":26},"钢筋.插筋",{"key":34,"text":518,"correct":26},"灌浆系统",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":218,"analysis":37},1106938,"地下洞室开挖的内容包括（ ）。",[523,525,527,529,531],{"key":20,"text":524,"correct":26},"隧洞",{"key":24,"text":526,"correct":26},"斜井",{"key":28,"text":528,"correct":26},"竖井",{"key":31,"text":530,"correct":26},"已建地下洞室的扩大开挖",{"key":34,"text":532,"correct":22},"小跨度洞室",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":203,"analysis":37},1106939,"施工阶段的质量控制根据工程实体形成的时间可以分为（ ）。",[537,539,541,543,545],{"key":20,"text":538,"correct":26},"事前控制阶段",{"key":24,"text":540,"correct":26},"事中控制阶段",{"key":28,"text":542,"correct":26},"事后控制阶段",{"key":31,"text":544,"correct":22},"基础控制阶段",{"key":34,"text":546,"correct":22},"提高控制阶段",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":334,"analysis":37},1106940,"由于发包人提供的材料或工程设备不合格造成的工程不合格，需要承包人采取措施补救的，发包人应承担相应责任，可得到的补偿有（ ）。",[551,553,554,556,558],{"key":20,"text":552,"correct":26},"工期",{"key":24,"text":211,"correct":22},{"key":28,"text":555,"correct":26},"费用",{"key":31,"text":557,"correct":26},"利润",{"key":34,"text":559,"correct":22},"工程设备",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":574,"analysis":37},1106941,"旁站监理人员应当认真履行职责，对需要实施旁站监理的（ ）在施工现场全程旁站，及时发现和处理旁站过程中出现的质量问题。",[564,566,568,570,572],{"key":20,"text":565,"correct":22},"所有部位",{"key":24,"text":567,"correct":22},"所有工序",{"key":28,"text":569,"correct":26},"关键部位",{"key":31,"text":571,"correct":26},"关键工序",{"key":34,"text":573,"correct":22},"主体工程","CD",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":334,"analysis":37},1106942,"工程设备安装完毕后，要参与和组织的调试有（ ）。",[579,581,583,585,587],{"key":20,"text":580,"correct":26},"单体调试",{"key":24,"text":582,"correct":22},"双体调试",{"key":28,"text":584,"correct":26},"联体无负荷调试",{"key":31,"text":586,"correct":26},"联体有负荷调试",{"key":34,"text":588,"correct":22},"全系统调试",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":218,"analysis":37},1106943,"承包人在工程施工前应根据（ ），列出质量控制点明细表，提交监理机构审查批准后，实施质量预控。",[593,595,597,599,601],{"key":20,"text":594,"correct":26},"施工过程质量控制的要求",{"key":24,"text":596,"correct":26},"工程性质",{"key":28,"text":598,"correct":26},"工程特点",{"key":31,"text":600,"correct":26},"自身特点",{"key":34,"text":602,"correct":22},"自身性质",{"id":604,"libraryId":5,"type":15,"typeLabel":16,"stem":605,"options":606,"answer":203,"analysis":37},1106944,"设备安装过程的检查，包括（ ）。",[607,608,610,611,613],{"key":20,"text":354,"correct":26},{"key":24,"text":609,"correct":26},"设备就位",{"key":28,"text":358,"correct":26},{"key":31,"text":612,"correct":22},"设备验收",{"key":34,"text":614,"correct":22},"多次灌浆",{"id":616,"libraryId":5,"type":15,"typeLabel":16,"stem":617,"options":618,"answer":319,"analysis":37},1106945,"金属结构设备运抵工地后，参与开箱检查和验收的单位有（ ）。",[619,621,623,625,627],{"key":20,"text":620,"correct":26},"监理单位",{"key":24,"text":622,"correct":26},"安装单位",{"key":28,"text":624,"correct":22},"运输单位",{"key":31,"text":626,"correct":26},"项目法人",{"key":34,"text":628,"correct":26},"设备厂代表",{"id":630,"libraryId":5,"type":15,"typeLabel":16,"stem":631,"options":632,"answer":52,"analysis":37},1106946,"拌和用水所含物质不应影响混凝土和易性和混凝土强度的增长，以及引起钢筋和混凝土的腐蚀，其中需满足规定的项目有（ ）。",[633,635,637,639,641],{"key":20,"text":634,"correct":26},"水的pH值",{"key":24,"text":636,"correct":26},"不溶物的含量",{"key":28,"text":638,"correct":26},"可溶物的含量",{"key":31,"text":640,"correct":22},"难溶物的含量",{"key":34,"text":642,"correct":26},"硫化物的含量",{"id":644,"libraryId":5,"type":15,"typeLabel":16,"stem":645,"options":646,"answer":67,"analysis":37},1106947,"对承包人的检测条件或委托的检测机构的检查内容有（ ）。",[647,649,651,653,655],{"key":20,"text":648,"correct":26},"检测机构的资质等级",{"key":24,"text":650,"correct":22},"检测机构的人员组成情况",{"key":28,"text":652,"correct":26},"法定计量部门对检测仪器",{"key":31,"text":654,"correct":26},"检测仪器的数量及种类",{"key":34,"text":656,"correct":26},"检测人员的资格证书",{"id":658,"libraryId":5,"type":15,"typeLabel":16,"stem":659,"options":660,"answer":52,"analysis":37},1106948,"料质量检验方法包括（ ）。",[661,663,665,667,669],{"key":20,"text":662,"correct":26},"书面检验",{"key":24,"text":664,"correct":26},"无损检验",{"key":28,"text":666,"correct":26},"外观检验",{"key":31,"text":668,"correct":22},"内部检验",{"key":34,"text":670,"correct":26},"理化检验",{"id":672,"libraryId":5,"type":15,"typeLabel":16,"stem":673,"options":674,"answer":685,"analysis":37},1106949,"设备基础检验的主要内容有（ ）。",[675,677,679,681,683],{"key":20,"text":676,"correct":26},"所在基础表面的模板必须拆除",{"key":24,"text":678,"correct":22},"设备运输人员的信息",{"key":28,"text":680,"correct":26},"设备基础断面尺寸",{"key":31,"text":682,"correct":22},"设备零件供应商的资质",{"key":34,"text":684,"correct":26},"基础混凝土的强度是否满足设计要求","ACE",{"id":687,"libraryId":5,"type":15,"typeLabel":16,"stem":688,"options":689,"answer":82,"analysis":37},1106950,"以下关于钢筋的抗拉实验的说法，正确的有（ ）。",[690,692,694,696,698],{"key":20,"text":691,"correct":22},"1个热轧钢筋接头试件的抗拉强度均不得小于该牌号钢筋规定的抗拉强度",{"key":24,"text":693,"correct":22},"至少应有3个试件断于焊缝之外，并应呈延性断裂",{"key":28,"text":695,"correct":26},"当试验结果有2个试件抗拉强度小于钢筋规定的抗拉强度，则一次判定该批接头为不合格品",{"key":31,"text":697,"correct":26},"当试验结果有1个试件的抗拉强度小于规定值，其抗拉强度均小于钢筋规定抗拉强度的1.10倍时，应进行复验",{"key":34,"text":699,"correct":26},"复验结果，当仍有1个试件的抗拉强度小于规定值，或有3个试件断于焊缝或热影响区呈脆性断裂，其抗拉强度小于钢筋规定抗拉强度的1.10倍时，应判定该工艺试验接头为不合格品",{"id":701,"libraryId":5,"type":15,"typeLabel":16,"stem":702,"options":703,"answer":52,"analysis":37},1106951,"以下关于水泥质量控制的说法，正确的有（ ）。",[704,706,708,710,712],{"key":20,"text":705,"correct":26},"每一工程所用水泥品种以1～2种为宜，并宜固定厂家供应",{"key":24,"text":707,"correct":26},"不同品种、标号、出厂日期和出厂编号的水泥应分别运输装卸，并做好明显标志，严防混淆",{"key":28,"text":709,"correct":26},"散装水泥宜在专用的仓罐中储放",{"key":31,"text":711,"correct":22},"散装水泥不应超过3个月",{"key":34,"text":713,"correct":26},"每批水泥均应有厂家的品质试验报告",{"id":715,"libraryId":5,"type":15,"typeLabel":16,"stem":716,"options":717,"answer":36,"analysis":37},1106952,"以下属于事前质量控制内容的有（ ）。",[718,720,722,724,726],{"key":20,"text":719,"correct":22},"监理单位资格审核",{"key":24,"text":721,"correct":26},"负责审查批准承包人在工程施工期间提交的施工组织设计、专项施工方案、施工措施计划和质量保证体系",{"key":28,"text":723,"correct":26},"督促承包人建立和健全质量保证体系，组建专门的质量管理机构，配备专职的质量管理人员",{"key":31,"text":725,"correct":26},"原材料、中间产品和工程设备的检验或验收",{"key":34,"text":727,"correct":26},"施工设备的质量控制",[729,733,736,739,742,745],{"id":730,"name":731,"category":7,"favorite":732},1,"领导干部任职前廉政法规知识测试题",92,{"id":734,"name":735,"category":7,"favorite":730},595,"建筑结构与设备",{"id":737,"name":738,"category":7,"favorite":730},715,"招标采购专业知识与法律法规",{"id":740,"name":741,"category":7,"favorite":730},848,"市政方向-通用基础",{"id":743,"name":744,"category":7,"favorite":8},534,"BIM工程师",{"id":746,"name":744,"category":7,"favorite":8},535]