[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-782-10":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":624},{"id":5,"name":6,"category":7,"favorite":8},782,"目标控制（水利工程）","建筑工程",0,10,50,775,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,272,284,296,308,320,332,344,356,368,380,392,403,415,427,439,451,463,475,487,499,511,523,535,547,559,571,583,595,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1106853,1,"单选题","下列关于双代号时标网络计划一般规定说法错误的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","以水平时间坐标为尺度表示工作时间",false,{"key":24,"text":25,"correct":26},"B","当工作有总时差时，用波形表示",true,{"key":28,"text":29,"correct":22},"C","节点中心必须对准相应的时标位置",{"key":31,"text":32,"correct":22},"D","宜按最早时间编制","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1106854,"某分部工程双代号时标网络计划如下图所示，其中工作C和I的最迟完成时间分别为第（ ）天。",[38,40,42,44],{"key":20,"text":39,"correct":22},"4和11",{"key":24,"text":41,"correct":26},"4和9",{"key":28,"text":43,"correct":22},"3和11",{"key":31,"text":45,"correct":22},"3和9",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1106855,"某工程双代号时标网络计划如下图所示，其中工作H的总时差和自由时差（ ）周。",[50,52,54,56],{"key":20,"text":51,"correct":22},"均为1",{"key":24,"text":53,"correct":22},"分别为3和0",{"key":28,"text":55,"correct":26},"分别为3和2",{"key":31,"text":57,"correct":22},"均为0",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1106856,"根据下列新横道图，计算各工作的时间参数，下列选项错误的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"工作2-5的自由时差为1",{"key":24,"text":65,"correct":22},"工作2-3为虚工作",{"key":28,"text":67,"correct":26},"工作3-4的最迟开始时间为5月7日末",{"key":31,"text":69,"correct":22},"工作5-6是关键工作",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1106857,"在单代号搭接网络图中，工作G的持续时间为4天，紧前工作有 D、E工作。工作D→G之间的搭接关系为STF=12天，工作E→G之间的搭接关系为STS=6天， D、E工作的时间参数如下图所示，则G工作的最早开始时间为（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"12天",{"key":24,"text":77,"correct":22},"14天",{"key":28,"text":79,"correct":26},"16天",{"key":31,"text":81,"correct":22},"18天",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1106858,"某分部工程单代号搭接网络计划如下图所示，其中关键工作是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"工作A和工作B",{"key":24,"text":89,"correct":22},"工作B和工作D",{"key":28,"text":91,"correct":22},"工作C和工作E",{"key":31,"text":93,"correct":26},"工作C和工作D",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1106859,"下列关于客观估计时间to、最可能估计时间tm和悲观估计时间to之间的关系说的错误的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"当to和tp越远离tm值，方差越大，概率分布越集中",{"key":24,"text":101,"correct":22},"当to和tp越接近tm值，肯定程度越高",{"key":28,"text":103,"correct":22},"在极端情况下，当三者相同时，方差为0",{"key":31,"text":105,"correct":22},"当to和tp越远离tm值，不确定性越大",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1106860,"关于时标网络计划中的时间参数，下列选项中说法正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"每条箭线的箭尾节点中心所对应的时标值为该工作的最早完成时间",{"key":24,"text":113,"correct":22},"工作箭线中存在波形线时，其箭头节点中心所对应的时标值为该工作的最早完成时间",{"key":28,"text":115,"correct":22},"工作箭线中不存在波形线时，工作箭线实线部分右端点所对应的时标值为该工作的最早完成时间",{"key":31,"text":117,"correct":26},"计算工期的判定时标网络计划的计算工期，应是其终点节点与起点节点所在位置的时标值之差为计算工期",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1106861,"网络计划技术的研究与应用领域主要包括确定型网络计划技术、非确定型网络计划技术和（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"随机型网络计划技术",{"key":24,"text":125,"correct":22},"概率型网络计划技术",{"key":28,"text":127,"correct":22},"可能型网络计划技术",{"key":31,"text":129,"correct":22},"一般型网络计划技术",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1106862,"自始至终全部由关键工作组成的线路为关键线路，或线路上总的工作持续时间（ ）的线路为关键线路。",[134,136,138,140],{"key":20,"text":135,"correct":22},"最短",{"key":24,"text":137,"correct":26},"最长",{"key":28,"text":139,"correct":22},"相等",{"key":31,"text":141,"correct":22},"以上答案均不对",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1106863,"以下关于工作分解结构（WBS）的说法正确的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"工作分解越详细越好",{"key":24,"text":149,"correct":22},"施工单位应该独立的进行工作分解",{"key":28,"text":151,"correct":26},"WBS可以按项目形成过程的阶段进行分解",{"key":31,"text":153,"correct":22},"工作分解由监理单位组织",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1106864,"费用优化又叫时间成本优化，它的目的之一是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"寻求最低成本时的工期安排",{"key":24,"text":161,"correct":22},"寻求工程成本最少的计划安排",{"key":28,"text":163,"correct":22},"寻求工期最短的计划安排",{"key":31,"text":165,"correct":22},"寻求资源需用量尽可能少的计划安排",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1106865,"以下不属于监理单位合同进度计划审查的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"响应性与符合性",{"key":24,"text":173,"correct":22},"正确性与可行性",{"key":28,"text":175,"correct":22},"进度与资源的协调性",{"key":31,"text":177,"correct":26},"完整性",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1106866,"在建筑项目中，只有在地基建成后，才能设计地面结构，这体现了（ ）逻辑关系。",[182,184,186,188],{"key":20,"text":183,"correct":26},"强制性逻辑关系",{"key":24,"text":185,"correct":22},"内部逻辑关系",{"key":28,"text":187,"correct":22},"选择性逻辑关系",{"key":31,"text":189,"correct":22},"外部逻辑关系",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1106867,"当所有工序都采用最短时间时，对应的工期费用说法正确的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"工期最短",{"key":24,"text":197,"correct":22},"工期最优",{"key":28,"text":199,"correct":22},"工程直接费用最低",{"key":31,"text":201,"correct":22},"工程直接费用最优",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1106868,"发包人的（ ）是发包人对项目的建设在时间上和空间上进行全局安排、统一协调的计划。",[206,208,210,212],{"key":20,"text":207,"correct":22},"工程测算",{"key":24,"text":209,"correct":26},"总体控制性进度计划",{"key":28,"text":211,"correct":22},"工程概算",{"key":31,"text":213,"correct":22},"目标计划",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1106869,"下列不属于枢纽工程类型的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":26},"堤防",{"key":24,"text":221,"correct":22},"水库",{"key":28,"text":223,"correct":22},"拦河闸",{"key":31,"text":225,"correct":22},"泵站",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},1106870,"影响工期的重要因素的是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"招标",{"key":24,"text":233,"correct":26},"征地移民",{"key":28,"text":235,"correct":22},"签约",{"key":31,"text":237,"correct":22},"总造价",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},1106871,"下列不属于承包人在按照合同要求编制的进度计划时应当满则的要求是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"合同工期",{"key":24,"text":245,"correct":22},"进度里程碑目标要求",{"key":28,"text":247,"correct":26},"施工场地",{"key":31,"text":249,"correct":22},"合同其他要求",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},1106872,"施工进度计划应满足合同工期和（ ）的要求。",[254,256,258,260],{"key":20,"text":255,"correct":22},"总体规划",{"key":24,"text":257,"correct":26},"阶段性目标",{"key":28,"text":259,"correct":22},"配套资源计划",{"key":31,"text":261,"correct":22},"施工方案",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},1106873,"在施工进度计划审批中，应仔细分析进度计划与（ ）的协调性。",[266,268,270,271],{"key":20,"text":267,"correct":22},"质量控制",{"key":24,"text":269,"correct":26},"资源计划",{"key":28,"text":243,"correct":22},{"key":31,"text":261,"correct":22},{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":28,"analysis":33},1106874,"只有紧前工作完成，紧后工作才能完成的逻辑关系属于（ ）。",[276,278,280,282],{"key":20,"text":277,"correct":22},"STS",{"key":24,"text":279,"correct":22},"FTS",{"key":28,"text":281,"correct":26},"FTF",{"key":31,"text":283,"correct":22},"STF",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":24,"analysis":33},1106875,"资源优化主要有（ ）问题。",[288,290,292,294],{"key":20,"text":289,"correct":22},"资源有限—工期最优的优化",{"key":24,"text":291,"correct":26},"工期固定--资源均衡的优化",{"key":28,"text":293,"correct":22},"最小优化",{"key":31,"text":295,"correct":22},"费用优化",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":24,"analysis":33},1106876,"里程碑节点一般包括泵站首台机组安装土建交接工作面、所有机组交接工作面、完成泵站金属结构安装等的枢纽工程是（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":22},"大坝工程",{"key":24,"text":303,"correct":26},"水电站工程",{"key":28,"text":305,"correct":22},"倒虹吸工程",{"key":31,"text":307,"correct":22},"疏浚工程",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":20,"analysis":33},1106877,"引水工程通常包含多种工程形式，下列不属于其工程形式的是（ ）。",[312,314,316,318],{"key":20,"text":313,"correct":26},"疏浚",{"key":24,"text":315,"correct":22},"渠道",{"key":28,"text":317,"correct":22},"隧洞",{"key":31,"text":319,"correct":22},"倒虹吸",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":24,"analysis":33},1106878,"承包人应按技术标准和要求（合同技术条款）约定的内容和期限以及监理人的指示，编制详细的施工总进度计划及其说明提交（ ）审批。",[324,326,328,330],{"key":20,"text":325,"correct":22},"承包人",{"key":24,"text":327,"correct":26},"监理人",{"key":28,"text":329,"correct":22},"管理层",{"key":31,"text":331,"correct":22},"项目负责人",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":31,"analysis":33},1106879,"进行工作历时估算时可以不考虑的因素是（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"资源数量",{"key":24,"text":339,"correct":22},"技术进步",{"key":28,"text":341,"correct":22},"员工激励",{"key":31,"text":343,"correct":26},"管理费用比率",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":20,"analysis":33},1106880,"下列选项不属于工作历时估算方法的是（ ）。",[348,350,352,354],{"key":20,"text":349,"correct":26},"组织者预估",{"key":24,"text":351,"correct":22},"参数估算",{"key":28,"text":353,"correct":22},"类比估算",{"key":31,"text":355,"correct":22},"三点估算",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},1106881,"割切检查法的步骤描述正确的是（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"把检查之后的日期作为剩余网络计划的开始日期",{"key":24,"text":363,"correct":26},"去掉已经完成的工作，对剩余工作组成的网络计划进行分析",{"key":28,"text":365,"correct":22},"若产生正时差，则说明项目进度拖后",{"key":31,"text":367,"correct":22},"应在出现正时差的工作路线上，调整工作持续时间",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":28,"analysis":33},1106882,"时标图上箭线长度与其工程实物量的多少成（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":22},"反比",{"key":24,"text":375,"correct":22},"倍数",{"key":28,"text":377,"correct":26},"正比",{"key":31,"text":379,"correct":22},"对应关系",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":31,"analysis":33},1106883,"横道图检查施工进度具有（ ）特点。",[384,386,388,390],{"key":20,"text":385,"correct":22},"综合",{"key":24,"text":387,"correct":22},"概括",{"key":28,"text":389,"correct":22},"能方便地确定关键工作",{"key":31,"text":391,"correct":26},"简单.直观",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":28,"analysis":33},1106884,"监理人在发出开工通知前应获得（ ）同意。",[396,397,399,401],{"key":20,"text":325,"correct":22},{"key":24,"text":398,"correct":22},"监督部门",{"key":28,"text":400,"correct":26},"发包人",{"key":31,"text":402,"correct":22},"设计人",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":31,"analysis":33},1106885,"常用的实际进度与计划进度对比的方法是（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":22},"横道图",{"key":24,"text":410,"correct":22},"列表检查法",{"key":28,"text":412,"correct":22},"割切检查法",{"key":31,"text":414,"correct":26},"标图检查法",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":20,"analysis":33},1106886,"监理人确定追加的付款和（或）延长的工期，并在收到索赔通知书或有关索赔的进一步证明材料后的（ ）天内，将索赔处理结果答复承包人。",[419,421,423,425],{"key":20,"text":420,"correct":26},"42",{"key":24,"text":422,"correct":22},"40",{"key":28,"text":424,"correct":22},"30",{"key":31,"text":426,"correct":22},"10",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":24,"analysis":33},1106887,"工程工期延长应等于该工作作业时间的延长减去其（ ）。",[431,433,435,437],{"key":20,"text":432,"correct":22},"工作自由时差",{"key":24,"text":434,"correct":26},"工作总时差",{"key":28,"text":436,"correct":22},"工作原计划时长",{"key":31,"text":438,"correct":22},"工作工期",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":28,"analysis":33},1106888,"在施工实践中，经常由于（ ）的发生引起进度计划的调整，从而引起施工设备使用发生冲突或闲置。",[443,445,447,449],{"key":20,"text":444,"correct":22},"资源分配的调整",{"key":24,"text":446,"correct":22},"施工进度计划的调整",{"key":28,"text":448,"correct":26},"施工进度延误事件",{"key":31,"text":450,"correct":22},"资金分配的调整",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":28,"analysis":33},1106889,"由于（ ）的原因，导致工期拖延，从而增大了工程成本时，承包人有权申请工期延误事件引起的派生费用损失。",[455,457,459,461],{"key":20,"text":456,"correct":22},"不可抗力",{"key":24,"text":458,"correct":22},"法律条文改变",{"key":28,"text":460,"correct":26},"发包人方面",{"key":31,"text":462,"correct":22},"季节性大雨",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":24,"analysis":33},1106890,"计算工期延长的方法中，在明确了干扰事件对各项工作作业时间的影响后，（ ）适用于各种干扰事件的索赔计算。",[467,469,471,473],{"key":20,"text":468,"correct":22},"平衡点法",{"key":24,"text":470,"correct":26},"网络计划分析法",{"key":28,"text":472,"correct":22},"比例法",{"key":31,"text":474,"correct":22},"类比法",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":28,"analysis":33},1106891,"下列选项不属于承包人进行工期索赔的目的的是（ ）。",[479,481,483,485],{"key":20,"text":480,"correct":22},"免去自己对已经产生的工期延长的合同责任",{"key":24,"text":482,"correct":22},"推卸自己对已经产生的工期延长的合同责任",{"key":28,"text":484,"correct":26},"指示承包人采取加速施工措施，以全部或部分弥补已经损失的工期",{"key":31,"text":486,"correct":22},"进行因工期延长而造成的费用损失的索赔",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":24,"analysis":33},1106892,"下列属于正在实施的工作，可反馈更新的参数的是（ ）。",[491,493,495,497],{"key":20,"text":492,"correct":22},"实际开始日期与实际完成日期",{"key":24,"text":494,"correct":26},"完成百分比或尚需工期",{"key":28,"text":496,"correct":22},"实际使用资源数量\u002F费用",{"key":31,"text":498,"correct":22},"实际其他费用和尚需其他费用",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":24,"analysis":33},1106893,"在“前置任务”中填写与之相关的任务编号时，MS Project 会自动连接（ ）任务。",[503,505,507,509],{"key":20,"text":504,"correct":22},"一个",{"key":24,"text":506,"correct":26},"两个",{"key":28,"text":508,"correct":22},"多个",{"key":31,"text":510,"correct":22},"三个",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":31,"analysis":33},1106894,"通过MS Project自动计算，可计算出各项工作的（ ）。",[515,517,519,521],{"key":20,"text":516,"correct":22},"费用参数",{"key":24,"text":518,"correct":22},"工程量参数",{"key":28,"text":520,"correct":22},"损耗参数",{"key":31,"text":522,"correct":26},"时间参数",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":31,"analysis":33},1106895,"不属于传统进度管理存在的主要问题的是（ ）。",[527,529,531,533],{"key":20,"text":528,"correct":22},"项目信息丢失现象严重",{"key":24,"text":530,"correct":22},"无法有效发现施工进度计划中的潜在冲突",{"key":28,"text":532,"correct":22},"工程施工进度跟踪十分困难",{"key":31,"text":534,"correct":26},"在处理质量偏差时缺乏整体性",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":24,"analysis":33},1106896,"作业分类码相关描述正确的是（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":22},"只能是某一EPS节点",{"key":24,"text":542,"correct":26},"可以是特定项目的数据",{"key":28,"text":544,"correct":22},"只能是全局的数据",{"key":31,"text":546,"correct":22},"只能是某个项目的数据",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":31,"analysis":33},1106897,"定义项目日期中，必须完成（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"在用关键路线算法进行进度计算时，影响采用自由浮时参数确定的关键路线",{"key":24,"text":554,"correct":22},"只在无任何作业项时，才能够显示",{"key":28,"text":556,"correct":22},"系统给出，不能手动定义",{"key":31,"text":558,"correct":26},"在用关键路线算法进行进度计算时，影响后推法计算最晚时间",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":20,"analysis":33},1106898,"CPM是用作业的工期和逻辑关系来计算（ ）。",[563,565,567,569],{"key":20,"text":564,"correct":26},"进度日期",{"key":24,"text":566,"correct":22},"关键路径",{"key":28,"text":568,"correct":22},"总浮时参数",{"key":31,"text":570,"correct":22},"自由浮时参数",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":20,"analysis":33},1106899,"OraclePrimaveraP6软件能使用户轻松（ ）多个工程。",[575,577,579,581],{"key":20,"text":576,"correct":26},"控制和协调",{"key":24,"text":578,"correct":22},"控制和管理",{"key":28,"text":580,"correct":22},"管理和平衡",{"key":31,"text":582,"correct":22},"协调和区分",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":31,"analysis":33},1106900,"下列选项中不属于P6的主要功能中能同时有效控制大型、复杂工程项目的是（ ）。",[587,589,591,593],{"key":20,"text":588,"correct":22},"通过工作分解结构对工程数据进行结构化组织",{"key":24,"text":590,"correct":22},"可反映各工序的时间、资源和费用",{"key":28,"text":592,"correct":22},"利用资源直方图和资源表格来标出潜在的资源冲突问题",{"key":31,"text":594,"correct":26},"以标准、美观的格式形象具体地呈现项目计划",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":20,"analysis":33},1106901,"下列属于BIM在施工进度管理中的优点的是（ ）。",[599,601,603,604],{"key":20,"text":600,"correct":26},"直观高效地表达多维空间数据",{"key":24,"text":602,"correct":22},"支持施工主体实现“先建后试”",{"key":28,"text":532,"correct":22},{"key":31,"text":605,"correct":22},"在处理施工进度偏差时缺乏整体性",{"id":607,"libraryId":5,"type":608,"typeLabel":609,"stem":610,"options":611,"answer":623,"analysis":33},1106902,2,"多选题","关于开标、评标和中标的说法，正确的有（ ）。",[612,614,616,618,620],{"key":20,"text":613,"correct":26},"开标应当在招标文件确定的提交投标文件截止时间的同一时间公开进行",{"key":24,"text":615,"correct":26},"评标委员会应当按照招标文件确定的评标标准和方法，对投标文件进行评审和比较",{"key":28,"text":617,"correct":26},"评标委员会完成评标后，应当向招标人提出书面评标报告",{"key":31,"text":619,"correct":22},"招标人不能授权评标委员会直接确定中标人",{"key":621,"text":622,"correct":22},"E","中标人确定后，招标人仅需向中标人发出中标结果","ABC",[625,628,631,634,637,640],{"id":15,"name":626,"category":7,"favorite":627},"领导干部任职前廉政法规知识测试题",92,{"id":629,"name":630,"category":7,"favorite":15},595,"建筑结构与设备",{"id":632,"name":633,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":635,"name":636,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":638,"name":639,"category":7,"favorite":8},534,"BIM工程师",{"id":641,"name":639,"category":7,"favorite":8},535]