[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-782-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":595},{"id":5,"name":6,"category":7,"favorite":8},782,"目标控制（水利工程）","建筑工程",0,1,50,775,[13,33,45,57,69,81,93,105,117,129,141,153,162,174,186,198,207,219,231,243,255,267,279,291,303,315,327,339,351,363,375,387,399,411,420,432,442,453,465,477,489,497,509,518,530,539,549,561,573,585],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":19,"analysis":32},1106394,"单选题","关于的标底的说法，错误的是（ ）。",[18,22,26,29],{"key":19,"text":20,"correct":21},"A","招标人必须进行标底的编制",true,{"key":23,"text":24,"correct":25},"B","标底是招标人组织专业人员进行编制的",false,{"key":27,"text":28,"correct":25},"C","一个招标项目只能有一个标底",{"key":30,"text":31,"correct":25},"D","标底与投标报价表示的招标项目内容范围相一致","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":27,"analysis":32},1106395,"招标人和中标人应当自中标通知书发出之日起（ ）日内，按照招标文件和中标人的投标文件订立书面合同。",[37,39,41,43],{"key":19,"text":38,"correct":25},"10",{"key":23,"text":40,"correct":25},"15",{"key":27,"text":42,"correct":21},"30",{"key":30,"text":44,"correct":25},"45",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":23,"analysis":32},1106396,"（ ）是评标的核心，是对标书进行实质性审查。",[49,51,53,55],{"key":19,"text":50,"correct":25},"初步评审",{"key":23,"text":52,"correct":21},"详细评审",{"key":27,"text":54,"correct":25},"投标人资格评审",{"key":30,"text":56,"correct":25},"投标文件的规范性审核",{"id":58,"libraryId":5,"type":9,"typeLabel":15,"stem":59,"options":60,"answer":27,"analysis":32},1106397,"下列哪项不属于材料、设备招标质量控制的技术评审的内容？（ ）",[61,63,65,67],{"key":19,"text":62,"correct":25},"生产同类产品的经验",{"key":23,"text":64,"correct":25},"可靠性和使用寿命",{"key":27,"text":66,"correct":21},"技术服务和人员培训等费用计算",{"key":30,"text":68,"correct":25},"检修条件及售后服务",{"id":70,"libraryId":5,"type":9,"typeLabel":15,"stem":71,"options":72,"answer":23,"analysis":32},1106398,"我国目前的设计阶段可以分为初步设计阶段和（ ）。",[73,75,77,79],{"key":19,"text":74,"correct":25},"具体设计阶段",{"key":23,"text":76,"correct":21},"施工图设计阶段",{"key":27,"text":78,"correct":25},"二次设计阶段",{"key":30,"text":80,"correct":25},"水文地质勘察阶段",{"id":82,"libraryId":5,"type":9,"typeLabel":15,"stem":83,"options":84,"answer":23,"analysis":32},1106399,"施工招标过程中从办理申请招标到发出招标公告为止属于（ ）",[85,87,89,91],{"key":19,"text":86,"correct":25},"招标阶段",{"key":23,"text":88,"correct":21},"招标准备阶段",{"key":27,"text":90,"correct":25},"决标阶段",{"key":30,"text":92,"correct":25},"定标阶段",{"id":94,"libraryId":5,"type":9,"typeLabel":15,"stem":95,"options":96,"answer":23,"analysis":32},1106400,"通过法定的程序和方式择优选择承包人来完成工程建设任务，是保证工程质量的（ ）。",[97,99,101,103],{"key":19,"text":98,"correct":25},"条件",{"key":23,"text":100,"correct":21},"前提",{"key":27,"text":102,"correct":25},"措施",{"key":30,"text":104,"correct":25},"手段",{"id":106,"libraryId":5,"type":9,"typeLabel":15,"stem":107,"options":108,"answer":19,"analysis":32},1106401,"勘察、设计招标质量控制，首先是评审勘察、设计单位投标文件内容的（ ）。",[109,111,113,115],{"key":19,"text":110,"correct":21},"完整性",{"key":23,"text":112,"correct":25},"时效性",{"key":27,"text":114,"correct":25},"严谨性",{"key":30,"text":116,"correct":25},"符合性",{"id":118,"libraryId":5,"type":9,"typeLabel":15,"stem":119,"options":120,"answer":27,"analysis":32},1106402,"工程施工投标文件由（ ）投标文件和技术标投标文件两部分组成。",[121,123,125,127],{"key":19,"text":122,"correct":25},"质量标",{"key":23,"text":124,"correct":25},"安全标",{"key":27,"text":126,"correct":21},"商务标",{"key":30,"text":128,"correct":25},"造价标",{"id":130,"libraryId":5,"type":9,"typeLabel":15,"stem":131,"options":132,"answer":23,"analysis":32},1106403,"根据建设工程的要求，查明、分析、评价建设场地的地质地理环境特征和岩土工程条件，编制建设工程勘察文件的活动，是指的（ ）。",[133,135,137,139],{"key":19,"text":134,"correct":25},"建设工程设计",{"key":23,"text":136,"correct":21},"建设工程勘察",{"key":27,"text":138,"correct":25},"建设工程施工",{"key":30,"text":140,"correct":25},"建设工程监理",{"id":142,"libraryId":5,"type":9,"typeLabel":15,"stem":143,"options":144,"answer":23,"analysis":32},1106404,"供（ ）用的工程地形图，一般都需要观测。",[145,147,149,151],{"key":19,"text":146,"correct":25},"建筑设计",{"key":23,"text":148,"correct":21},"规划设计",{"key":27,"text":150,"correct":25},"勘察",{"key":30,"text":152,"correct":25},"监理",{"id":154,"libraryId":5,"type":9,"typeLabel":15,"stem":155,"options":156,"answer":27,"analysis":32},1106405,"材料、设备招标中技术评审内容不包括的是（ ）。",[157,158,159,161],{"key":19,"text":62,"correct":25},{"key":23,"text":64,"correct":25},{"key":27,"text":160,"correct":21},"安全性和环境效益",{"key":30,"text":68,"correct":25},{"id":163,"libraryId":5,"type":9,"typeLabel":15,"stem":164,"options":165,"answer":27,"analysis":32},1106406,"招标人可以自行决定是否编制（ ）。",[166,168,170,172],{"key":19,"text":167,"correct":25},"招标控制价",{"key":23,"text":169,"correct":25},"招标底价",{"key":27,"text":171,"correct":21},"标底",{"key":30,"text":173,"correct":25},"招标限价",{"id":175,"libraryId":5,"type":9,"typeLabel":15,"stem":176,"options":177,"answer":30,"analysis":32},1106407,"材料、设备投标文件主要内容不包含（ ）。",[178,180,182,184],{"key":19,"text":179,"correct":25},"近年来的工作业绩、获得的各种荣誉",{"key":23,"text":181,"correct":25},"重要材料、设备技术文件",{"key":27,"text":183,"correct":25},"资格后审时，投标人资格证明材料",{"key":30,"text":185,"correct":21},"材料、设备生产厂家的详细信息",{"id":187,"libraryId":5,"type":9,"typeLabel":15,"stem":188,"options":189,"answer":19,"analysis":32},1106408,"地震安全性评价一般在（ ）阶段完成。",[190,192,194,196],{"key":19,"text":191,"correct":21},"可行性研究",{"key":23,"text":193,"correct":25},"初步设计",{"key":27,"text":195,"correct":25},"社会效益评估",{"key":30,"text":197,"correct":25},"环境评价",{"id":199,"libraryId":5,"type":9,"typeLabel":15,"stem":200,"options":201,"answer":19,"analysis":32},1106409,"工程建设项目招标的三个阶段工作不包括（ ）。",[202,204,205,206],{"key":19,"text":203,"correct":21},"招标结束阶段",{"key":23,"text":88,"correct":25},{"key":27,"text":86,"correct":25},{"key":30,"text":90,"correct":25},{"id":208,"libraryId":5,"type":9,"typeLabel":15,"stem":209,"options":210,"answer":19,"analysis":32},1106410,"检查勘察、设计单位的营业执照，重点是（ ）和年检情况。",[211,213,215,217],{"key":19,"text":212,"correct":21},"有效期",{"key":23,"text":214,"correct":25},"申请时间",{"key":27,"text":216,"correct":25},"终止时间",{"key":30,"text":218,"correct":25},"主要负责人资质",{"id":220,"libraryId":5,"type":9,"typeLabel":15,"stem":221,"options":222,"answer":23,"analysis":32},1106412,"以下不属于勘察、设计投标文件主要内容的是（ ）。",[223,225,227,229],{"key":19,"text":224,"correct":25},"投标函",{"key":23,"text":226,"correct":21},"资产负债表",{"key":27,"text":228,"correct":25},"投标保证金",{"key":30,"text":230,"correct":25},"项目管理机构表",{"id":232,"libraryId":5,"type":9,"typeLabel":15,"stem":233,"options":234,"answer":19,"analysis":32},1106413,"（ ）的质量控制不但是施工监理重要的核心内容，也是工程项目质量控制的重点。",[235,237,239,241],{"key":19,"text":236,"correct":21},"施工阶段",{"key":23,"text":238,"correct":25},"设计阶段",{"key":27,"text":240,"correct":25},"可行性研究阶段",{"key":30,"text":242,"correct":25},"竣工验收阶段",{"id":244,"libraryId":5,"type":9,"typeLabel":15,"stem":245,"options":246,"answer":30,"analysis":32},1106414,"不属于巡视检查要点的是（ ）。",[247,249,251,253],{"key":19,"text":248,"correct":25},"检查原材料",{"key":23,"text":250,"correct":25},"检查施工人员",{"key":27,"text":252,"correct":25},"检查专业工程",{"key":30,"text":254,"correct":21},"检查外来出入人员",{"id":256,"libraryId":5,"type":9,"typeLabel":15,"stem":257,"options":258,"answer":27,"analysis":32},1106415,"跟踪检测时，混凝土试样不应少于承包人检测数量的（ ）。",[259,261,263,265],{"key":19,"text":260,"correct":25},"3%",{"key":23,"text":262,"correct":25},"5%",{"key":27,"text":264,"correct":21},"7%",{"key":30,"text":266,"correct":25},"10%",{"id":268,"libraryId":5,"type":9,"typeLabel":15,"stem":269,"options":270,"answer":27,"analysis":32},1106416,"关于工程隐蔽部位覆盖前检查的说法，错误的是（ ）。",[271,273,275,277],{"key":19,"text":272,"correct":25},"监理机构应加强重要隐蔽单元工程和关键部位单元工程的质量控制",{"key":23,"text":274,"correct":25},"经承包人自检确认的工程隐蔽部位具备覆盖条件后，承包人应通知监理机构在约定的期限内检查",{"key":27,"text":276,"correct":21},"监理机构未按约定的时间进行检查的，承包人不可自行完成覆盖工作",{"key":30,"text":278,"correct":25},"承包人覆盖工程隐蔽部位后，监理机构对质量有疑问的，可要求承包人对已覆盖的部位进行钻孔探测或揭开重新检验",{"id":280,"libraryId":5,"type":9,"typeLabel":15,"stem":281,"options":282,"answer":27,"analysis":32},1106417,"监理机构在对承包人的施工组织设计和技术措施进行仔细审查后提出意见和建议，并用（ ）答复承包人是否批准施工组织设计和技术措施。",[283,285,287,289],{"key":19,"text":284,"correct":25},"口头形式",{"key":23,"text":286,"correct":25},"口头或者书面形式",{"key":27,"text":288,"correct":21},"书面形式",{"key":30,"text":290,"correct":25},"口头之后，追加书面形式",{"id":292,"libraryId":5,"type":9,"typeLabel":15,"stem":293,"options":294,"answer":23,"analysis":32},1106418,"开工准备时，监理机构的准备工作不包括（ ）。",[295,297,299,301],{"key":19,"text":296,"correct":25},"依据监理合同约定，进场后及时设立监理机构",{"key":23,"text":298,"correct":21},"提请承包人提供工程设计及批复文件",{"key":27,"text":300,"correct":25},"组织编制监理规划",{"key":30,"text":302,"correct":25},"依据监理规划和工程进展，结合批准的施工措施计划，及时编制监理实施细则",{"id":304,"libraryId":5,"type":9,"typeLabel":15,"stem":305,"options":306,"answer":19,"analysis":32},1106419,"以下不属于设计技术交底会议应着重解决的是（ ）。",[307,309,311,313],{"key":19,"text":308,"correct":21},"发包人在施工过程中应注意的问题",{"key":23,"text":310,"correct":25},"主管部门对本工程的要求",{"key":27,"text":312,"correct":25},"分析地形的影响",{"key":30,"text":314,"correct":25},"设计单位对涉及施工安全的重点部位和环节在设计文件中注明",{"id":316,"libraryId":5,"type":9,"typeLabel":15,"stem":317,"options":318,"answer":23,"analysis":32},1106420,"以下关于承包人提供的材料和工程设备的质量控制的说法，错误的是（ ）。",[319,321,323,325],{"key":19,"text":320,"correct":25},"承包人负责采购、运输和保管完成本合同工作所需的材料和工程设备承包人应对其采购的材料和工程设备负责",{"key":23,"text":322,"correct":21},"承包人应按通用合同条款的约定，将各项材料和工程设备的供货人及品种、规格、数量和供货时间等报送监理机构审批",{"key":27,"text":324,"correct":25},"承包人应向监理机构提交其负责提供的材料和工程设备的质量证明文件，并满足合同约定的质量标准",{"key":30,"text":326,"correct":25},"对承包人提供的材料和工程设备，承包人应会同监理机构进行检验和交货验收",{"id":328,"libraryId":5,"type":9,"typeLabel":15,"stem":329,"options":330,"answer":19,"analysis":32},1106421,"以下关于有负荷调试必须具备条件的说法，错误的是（ ）。",[331,333,335,337],{"key":19,"text":332,"correct":21},"无负荷调试中发现的各类质量问题部分已解决完毕",{"key":23,"text":334,"correct":25},"工程的全部辅助生产系统满足调试需要并畅通无阻",{"key":27,"text":336,"correct":25},"生产操作人员配备齐全，辅助材料准备妥当",{"key":30,"text":338,"correct":25},"对生产的处理量、产量、产品品种及其质量等是否达到设计要求，进行全面检验和评价",{"id":340,"libraryId":5,"type":9,"typeLabel":15,"stem":341,"options":342,"answer":30,"analysis":32},1106422,"在不破坏材料样品的前提下，利用超声波、X射线、表面探伤仪等进行材料质量检验的方法是（ ）。",[343,345,347,349],{"key":19,"text":344,"correct":25},"书面检验",{"key":23,"text":346,"correct":25},"外观检验",{"key":27,"text":348,"correct":25},"理化检验",{"key":30,"text":350,"correct":21},"无损检验",{"id":352,"libraryId":5,"type":9,"typeLabel":15,"stem":353,"options":354,"answer":23,"analysis":32},1106423,"土方压实质量检测的取样应在压实层厚的下部（ ）处取样。",[355,357,359,361],{"key":19,"text":356,"correct":25},"1\u002F2",{"key":23,"text":358,"correct":21},"1\u002F3",{"key":27,"text":360,"correct":25},"1\u002F4",{"key":30,"text":362,"correct":25},"1\u002F5",{"id":364,"libraryId":5,"type":9,"typeLabel":15,"stem":365,"options":366,"answer":23,"analysis":32},1106425,"弧形闸门安装中，埋件的止水座基面至弧形闸门外弧面的间隙公差应不大于（ ）mm。",[367,369,371,373],{"key":19,"text":368,"correct":25},"2",{"key":23,"text":370,"correct":21},"3",{"key":27,"text":372,"correct":25},"4",{"key":30,"text":374,"correct":25},"6",{"id":376,"libraryId":5,"type":9,"typeLabel":15,"stem":377,"options":378,"answer":27,"analysis":32},1106426,"埋件的二期混凝土强度达到（ ）以后方可拆模。",[379,381,383,385],{"key":19,"text":380,"correct":25},"30%",{"key":23,"text":382,"correct":25},"50%",{"key":27,"text":384,"correct":21},"70%",{"key":30,"text":386,"correct":25},"100%",{"id":388,"libraryId":5,"type":9,"typeLabel":15,"stem":389,"options":390,"answer":19,"analysis":32},1106427,"一期、二期埋件的埋设位置、临时支撑、加固措施、埋设公差经（ ）自检合格后，在混凝土浇筑之前应通知监理工程师检查签证。",[391,393,395,397],{"key":19,"text":392,"correct":21},"安装单位",{"key":23,"text":394,"correct":25},"设计单位",{"key":27,"text":396,"correct":25},"建设单位",{"key":30,"text":398,"correct":25},"施工单位",{"id":400,"libraryId":5,"type":9,"typeLabel":15,"stem":401,"options":402,"answer":30,"analysis":32},1106428,"以下不属于验收时安装单位应提供的资料是（ ）。",[403,405,407,409],{"key":19,"text":404,"correct":25},"验收申请报告和验收大纲",{"key":23,"text":406,"correct":25},"焊接工艺评定报告及安装工艺文件",{"key":27,"text":408,"correct":25},"闸门和埋件安装质量检验记录",{"key":30,"text":410,"correct":21},"供应构件的单位信息",{"id":412,"libraryId":5,"type":9,"typeLabel":15,"stem":413,"options":414,"answer":19,"analysis":32},1106429,"袋装水泥的出厂日期不应超过（ ）个月。",[415,416,417,419],{"key":19,"text":370,"correct":21},{"key":23,"text":372,"correct":25},{"key":27,"text":418,"correct":25},"5",{"key":30,"text":374,"correct":25},{"id":421,"libraryId":5,"type":9,"typeLabel":15,"stem":422,"options":423,"answer":23,"analysis":32},1106430,"河床部位开挖深度较大时，应采用（ ）。",[424,426,428,430],{"key":19,"text":425,"correct":25},"自上而下开挖",{"key":23,"text":427,"correct":21},"分层开挖",{"key":27,"text":429,"correct":25},"分梯段开挖",{"key":30,"text":431,"correct":25},"分块开挖",{"id":433,"libraryId":5,"type":9,"typeLabel":15,"stem":434,"options":435,"answer":30,"analysis":32},1106431,"喷射混凝土抗压强度保证率在（ ）及以上。",[436,437,438,440],{"key":19,"text":380,"correct":25},{"key":23,"text":382,"correct":25},{"key":27,"text":439,"correct":25},"60%",{"key":30,"text":441,"correct":21},"85%",{"id":443,"libraryId":5,"type":9,"typeLabel":15,"stem":444,"options":445,"answer":27,"analysis":32},1106432,"若承包人要求采用其他种类的钢筋替代施工图纸中规定的钢筋，应征得（ ）的同意。",[446,448,450,451],{"key":19,"text":447,"correct":25},"业主方",{"key":23,"text":449,"correct":25},"监理单位",{"key":27,"text":394,"correct":21},{"key":30,"text":452,"correct":25},"分包单位",{"id":454,"libraryId":5,"type":9,"typeLabel":15,"stem":455,"options":456,"answer":19,"analysis":32},1106433,"以下关于混凝土浇筑振捣的技术要求，说法错误的是（ ）。",[457,459,461,463],{"key":19,"text":458,"correct":21},"混凝土浇筑应以振捣代替平仓",{"key":23,"text":460,"correct":25},"振捣完应慢慢拔出，振捣棒头应插入下层混凝土5～10cm",{"key":27,"text":462,"correct":25},"严禁振捣器直接碰撞模板、钢筋及预埋件",{"key":30,"text":464,"correct":25},"混凝土浇筑过程中，严禁在仓内加水",{"id":466,"libraryId":5,"type":9,"typeLabel":15,"stem":467,"options":468,"answer":23,"analysis":32},1106434,"经项目监理机构审查合格的工程项目施工组织设计， 应由（ ） 签认。",[469,471,473,475],{"key":19,"text":470,"correct":25},"监理单位技术负责人",{"key":23,"text":472,"correct":21},"总监理工程师",{"key":27,"text":474,"correct":25},"建设单位项目负责人",{"key":30,"text":476,"correct":25},"总监理工程师代表",{"id":478,"libraryId":5,"type":9,"typeLabel":15,"stem":479,"options":480,"answer":23,"analysis":32},1106435,"工程中采用新工艺、新材料的， 应有（ ） 及有关质量数据。",[481,483,485,487],{"key":19,"text":482,"correct":25},"施工单位组织的专家论证意见",{"key":23,"text":484,"correct":21},"权威性技术部门的技术鉴定书",{"key":27,"text":486,"correct":25},"设计单位组织的专家论证意见",{"key":30,"text":488,"correct":25},"建设单位组织的专家论证意见",{"id":490,"libraryId":5,"type":9,"typeLabel":15,"stem":491,"options":492,"answer":27,"analysis":32},1106436,"根据《建设工程监理规范》， 工程施工采用新技术、新工艺时， 应由（ ） 组织必要的专题论证。",[493,494,495,496],{"key":19,"text":398,"correct":25},{"key":23,"text":449,"correct":25},{"key":27,"text":396,"correct":21},{"key":30,"text":394,"correct":25},{"id":498,"libraryId":5,"type":9,"typeLabel":15,"stem":499,"options":500,"answer":19,"analysis":32},1106437,"监理机构的检查和检验，不免除（ ）按合同约定应负的责任。",[501,503,505,507],{"key":19,"text":502,"correct":21},"承包人",{"key":23,"text":504,"correct":25},"分包人",{"key":27,"text":506,"correct":25},"发包人",{"key":30,"text":508,"correct":25},"供货商",{"id":510,"libraryId":5,"type":9,"typeLabel":15,"stem":511,"options":512,"answer":27,"analysis":32},1106438,"监理机构在施工前还应参加（ ）组织的设计交底工作，以达到了解设计意图和质量要求，发现图纸差错和减少质量隐患的目的。",[513,514,515,516],{"key":19,"text":502,"correct":25},{"key":23,"text":504,"correct":25},{"key":27,"text":506,"correct":21},{"key":30,"text":517,"correct":25},"质量监督机构",{"id":519,"libraryId":5,"type":9,"typeLabel":15,"stem":520,"options":521,"answer":19,"analysis":32},1106439,"监理机构按照监理合同约定，在施工现场对工程项目的重要部位和关键工序的施工，实施连续性的全过程监督、检查和记录，是指的（ ）。",[522,524,526,528],{"key":19,"text":523,"correct":21},"旁站",{"key":23,"text":525,"correct":25},"巡视",{"key":27,"text":527,"correct":25},"平行检验",{"key":30,"text":529,"correct":25},"见证取样",{"id":531,"libraryId":5,"type":9,"typeLabel":15,"stem":532,"options":533,"answer":27,"analysis":32},1106440,"监理机构对承包人在质量检测中的取样和送样进行监督，是指的（ ）。",[534,535,536,538],{"key":19,"text":523,"correct":25},{"key":23,"text":529,"correct":25},{"key":27,"text":537,"correct":21},"跟踪检测",{"key":30,"text":525,"correct":25},{"id":540,"libraryId":5,"type":9,"typeLabel":15,"stem":541,"options":542,"answer":30,"analysis":32},1106441,"跟踪检测和平行检测工作都应由（ ）承担。",[543,544,546,547],{"key":19,"text":506,"correct":25},{"key":23,"text":545,"correct":25},"监理人",{"key":27,"text":502,"correct":25},{"key":30,"text":548,"correct":21},"检测机构",{"id":550,"libraryId":5,"type":9,"typeLabel":15,"stem":551,"options":552,"answer":19,"analysis":32},1106442,"监理机构应在施工合同约定的期限内，经发包人同意后向承包人发出开工通知，开工通知中应载明（ ）。",[553,555,557,559],{"key":19,"text":554,"correct":21},"合同开工日期",{"key":23,"text":556,"correct":25},"合同完工日期",{"key":27,"text":558,"correct":25},"竣工结算日期",{"key":30,"text":560,"correct":25},"进度款结算日期",{"id":562,"libraryId":5,"type":9,"typeLabel":15,"stem":563,"options":564,"answer":19,"analysis":32},1106443,"合同项目开工条件的审查内容，包括（ ）两方面的准备工作。",[565,567,569,571],{"key":19,"text":566,"correct":21},"发包人和承包人",{"key":23,"text":568,"correct":25},"承包人和分包人",{"key":27,"text":570,"correct":25},"承包人和供货商",{"key":30,"text":572,"correct":25},"承包人和设计单位",{"id":574,"libraryId":5,"type":9,"typeLabel":15,"stem":575,"options":576,"answer":23,"analysis":32},1106444,"工程开工前，发包人的准备工作中，监理机构应协助发包人做好施工现场的（ ）工作。",[577,579,581,583],{"key":19,"text":578,"correct":25},"“三通一平”",{"key":23,"text":580,"correct":21},"“四通一平”",{"key":27,"text":582,"correct":25},"“五通一平”",{"key":30,"text":584,"correct":25},"“七通一平”",{"id":586,"libraryId":5,"type":9,"typeLabel":15,"stem":587,"options":588,"answer":23,"analysis":32},1106445,"承包人更换项目经理应事先征得发包人同意，并应在更换（ ）天前通知发包人和监理机构。",[589,590,592,594],{"key":19,"text":418,"correct":25},{"key":23,"text":591,"correct":21},"14",{"key":27,"text":593,"correct":25},"28",{"key":30,"text":42,"correct":25},[596,599,602,605,608,611],{"id":9,"name":597,"category":7,"favorite":598},"领导干部任职前廉政法规知识测试题",92,{"id":600,"name":601,"category":7,"favorite":9},595,"建筑结构与设备",{"id":603,"name":604,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":606,"name":607,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":609,"name":610,"category":7,"favorite":8},534,"BIM工程师",{"id":612,"name":610,"category":7,"favorite":8},535]