[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107157":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1107157,782,2,"多选题","网络计划的优化目标，应按计划任务的需要和条件选定，包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工期目标",true,{"key":16,"text":17,"correct":18},"B","人力目标",false,{"key":20,"text":21,"correct":14},"C","资源目标",{"key":23,"text":24,"correct":18},"D","效益目标",{"key":26,"text":27,"correct":14},"E","费用目标","ACE","本题考查的是网络计划优化。网络计划的优化目标，应按计划任务的需要和条件选定，包括工期目标、资源目标和费用目标。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（水利工程）","建筑工程",0]