[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107130":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1107130,782,2,"多选题","根据《水利建设项目后评价管理办法（试行）》（水规计（2010）51 号），项目后评价中的过程评价包括（ ）等内容。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","社会影响评价",false,{"key":16,"text":17,"correct":14},"B","环境影响评价",{"key":19,"text":20,"correct":14},"C","财务评价",{"key":22,"text":23,"correct":24},"D","运行管理评价",true,{"key":26,"text":27,"correct":24},"E","建设实施评价","DE","过程评价包括前期工作评价、建设实施评价、运行管理评价三部分。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（水利工程）","建筑工程",0]