[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107111":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1107111,782,2,"多选题","工程量清单的内容包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","单位工程项目清单",false,{"key":16,"text":17,"correct":14},"B","单项工程项目清单",{"key":19,"text":20,"correct":21},"C","分类分项工程量清单",true,{"key":23,"text":24,"correct":21},"D","措施项目清单",{"key":26,"text":27,"correct":21},"E","其他项目清单","CDE","工程量清单包括封面、填表须知、工程量清单总说明、分类分项工程量清单、措施项目清单、其他项目清单、零星工作项目清单及其他辅助表格。其中，其他辅助表格包括：招标人供应材料价格表、招标人提供施工设备表、招标人提供施工设施表。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（水利工程）","建筑工程",0]