[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107109":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1107109,782,2,"多选题","标底编制的依据包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工程设计文件",false,{"key":16,"text":17,"correct":18},"B","招标人提供的招标文件",true,{"key":20,"text":21,"correct":14},"C","经验数据资料",{"key":23,"text":24,"correct":18},"D","设备及材料市场价格",{"key":26,"text":27,"correct":18},"E","批准的初步设计概算或修正概算","BDE","工程标底的编制主要需依据以下资料和文件：①招标人提供的招标文件，包括商务条款、技术条款、图纸以及招标人对已发出的招标文件进行澄清、修改或补充的书面资料等；②现场查勘资料；③批准的初步设计概算或修正概算；④国家及地区颁发的现行建筑、安装工程定额及取费标准（规定）；⑤设备及材料市场价格；⑥施工组织设计或施工规划；⑦其他有关资料。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（水利工程）","建筑工程",0]