[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107097":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1107097,782,2,"多选题","水利PPP 项目实施程序主要包括（ ）等。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","项目论证",true,{"key":16,"text":17,"correct":14},"B","项目储备",{"key":19,"text":20,"correct":14},"C","社会资本方选择",{"key":22,"text":23,"correct":24},"D","设备采购",false,{"key":26,"text":27,"correct":14},"E","项目执行","ABCE","水利PPP 项目实施程序主要包括项目储备、项目论证、社会资本方选择、项目执行等。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（水利工程）","建筑工程",0]