[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107082":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1107082,782,2,"多选题","独立费用包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","生产准备费",true,{"key":16,"text":17,"correct":14},"B","建设管理费",{"key":19,"text":20,"correct":21},"C","冬雨季施工增加费",false,{"key":23,"text":24,"correct":14},"D","工程建设监理费",{"key":26,"text":27,"correct":21},"E","技术转让费","ABD","ABD三项，独立费用由建设管理费、工程建设监理费、联合试运转费、生产准备费、科研勘测设计费和其他六项组成，C项属于直接费，E项属于间接费中的企业管理费。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（水利工程）","建筑工程",0]