[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107066":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1107066,782,2,"多选题","质量管理体系包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","组织确定计划",false,{"key":16,"text":17,"correct":18},"B","组织确定目标",true,{"key":20,"text":21,"correct":18},"C","为获得期望的结果确定过程",{"key":23,"text":24,"correct":14},"D","为获得期望的结果确定进度",{"key":26,"text":27,"correct":18},"E","为获得期望的结果确定所需资源","BCE","本题考查的是质量控制基本概念。质量管理体系包括组织确定其目标以及为获得期望的结果确定其过程和所需资源的活动。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（水利工程）","建筑工程",0]