[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106957":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1106957,782,2,"多选题","以下属于法人验收的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","截流验收",false,{"key":16,"text":17,"correct":18},"B","分部工程验收",true,{"key":20,"text":21,"correct":18},"C","单位工程验收",{"key":23,"text":24,"correct":18},"D","合同工程完工验收",{"key":26,"text":27,"correct":14},"E","竣工验收","BCD","水利工程法人验收包括： 分部工程验收、单位工程验收、中间机组启动验收、合同工程完工验收。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（水利工程）","建筑工程",0]