[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106945":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1106945,782,2,"多选题","金属结构设备运抵工地后，参与开箱检查和验收的单位有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","监理单位",true,{"key":16,"text":17,"correct":14},"B","安装单位",{"key":19,"text":20,"correct":21},"C","运输单位",false,{"key":23,"text":24,"correct":14},"D","项目法人",{"key":26,"text":27,"correct":14},"E","设备厂代表","ABDE","本题考查的是机电及金属结构设备安装质量控制。金属结构设备运抵工地后，由监理、安装、项目法人和设备厂代表进行开箱检查和验收。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（水利工程）","建筑工程",0]