[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106940":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1106940,782,2,"多选题","由于发包人提供的材料或工程设备不合格造成的工程不合格，需要承包人采取措施补救的，发包人应承担相应责任，可得到的补偿有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工期",true,{"key":16,"text":17,"correct":18},"B","材料",false,{"key":20,"text":21,"correct":14},"C","费用",{"key":23,"text":24,"correct":14},"D","利润",{"key":26,"text":27,"correct":18},"E","工程设备","ACD","本题考查的是施工阶段质量控制概述。由于发包人提供的材料或工程设备不合格造成的工程不合格，需要承包人采取措施补救的，发包人应承担由此增加的费用和（或）工期延误，并支付承包人合理利润。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（水利工程）","建筑工程",0]