[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106933":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1106933,782,2,"多选题","除专用合同条款另有约定外，应由监理机构组织发包人按合同进行交货和验收的有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","水工金属结构",true,{"key":16,"text":17,"correct":14},"B","启闭机",{"key":19,"text":20,"correct":14},"C","机电产品",{"key":22,"text":23,"correct":24},"D","水泥",false,{"key":26,"text":27,"correct":24},"E","钢材","ABC","本题考查的是施工实施阶段影响因素的质量控制。除专用合同条款另有约定外，水工金属结构、启闭机及机电产品进场后，监理机构组织发包人按合同进行交货和验收。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（水利工程）","建筑工程",0]