[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106918":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1106918,782,2,"多选题","施工准确阶段，发包人的准备工作有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","首批开工项目施工图纸和文件的供应",true,{"key":16,"text":17,"correct":14},"B","测量基准点的移交",{"key":19,"text":20,"correct":14},"C","施工用地的提供",{"key":22,"text":23,"correct":24},"D","工程量清单的核对",false,{"key":26,"text":27,"correct":14},"E","施工合同中约定应由发包人提供的道路、供电、供水、通信等条件","ABCE","施工准确阶段，发包人的准备工作包括：①首批开工项目施工图纸和文件的供应；②测量基准点的移交；③施工用地的提供；④施工合同中约定应由发包人提供的道路、供电、供水、通信等条件。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（水利工程）","建筑工程",0]