[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106794":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1106794,782,1,"单选题","发包人应在收到最终结清申请单后（ ）天内审核完毕，由监理人向承包人出具经发包人签认的最终结清证书。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","7",false,{"key":16,"text":17,"correct":18},"B","14",true,{"key":20,"text":21,"correct":14},"C","28",{"key":23,"text":24,"correct":14},"D","56","监理人收到承包人提交的最终结清申请单后的14天内，提出发包人应支付给承包人的价款送发包人审核并抄送承包人。发包人应在收到后14天内审核完毕，由监理人向承包人出具经发包人签认的最终结清证书。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（水利工程）","建筑工程",0]