[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106776":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1106776,782,1,"单选题","工程标底是体现（ ）水平的价格。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","社会平均",false,{"key":16,"text":17,"correct":14},"B","社会先进",{"key":19,"text":20,"correct":14},"C","社会合理",{"key":22,"text":23,"correct":24},"D","社会平均先进",true,"工程标底是以目前项目招标范围内所拥有的可以利用的施工设备、技术优势以及社会平均先进的管理水平或定额确定人工、材料、机械的消耗数量，以市场平均水平所确定的材料预算价格，以社会平均管理水平或定额费用标准确定各项取费费率，是体现社会平均先进工效和管理水平的价格。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（水利工程）","建筑工程",0]