[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106774":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1106774,782,1,"单选题","对于工程量清单中列有但承包人未报价的项目，合同实施中（ ）支付工程款。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","仍应予",false,{"key":16,"text":17,"correct":18},"B","一律不予",true,{"key":20,"text":21,"correct":14},"C","应部分",{"key":23,"text":24,"correct":14},"D","应视情况","投标人未填写的单价和合价，视为此项费用已包含在工程量清单的其他单价和合价中。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（水利工程）","建筑工程",0]