[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106769":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1106769,782,1,"单选题","分类分项工程量清单不包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程量计算规则",true,{"key":16,"text":17,"correct":18},"B","项目编码",false,{"key":20,"text":21,"correct":18},"C","主要技术条款编码",{"key":23,"text":24,"correct":18},"D","工程数量","分类分项工程量清单应包括序号、项目编码、项目名称、计量单位、工程数量、主要技术条款编码和备注。工程量应根据项目特征、计量单位、工程量计算规则、主要工作内容和工作范围进行计算。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（水利工程）","建筑工程",0]