[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106705":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1106705,782,1,"单选题","控制项目投资最有效的手段是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","技术措施",false,{"key":16,"text":17,"correct":14},"B","经济措施",{"key":19,"text":20,"correct":21},"C","技术与经济相结合",true,{"key":23,"text":24,"correct":14},"D","组织与经济相结合","技术与经济相结合是控制项目投资最有效的手段。在工程建设过程中把技术与经济有机结合，通过技术比较、经济分析和效果评价正确处理技术先进和经济合理两者之间的对立统一关系，力求在技术先进条件下的经济合理，在经济合理的基础上的技术先进，把控制建设项目投资观念渗透到项目建设各阶段之中。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（水利工程）","建筑工程",0]