[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106698":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1106698,782,1,"单选题","（ ）是影响工程项目质量的决定性环节。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","可行性研究阶段",false,{"key":16,"text":17,"correct":18},"B","设计阶段",true,{"key":20,"text":21,"correct":14},"C","施工阶段",{"key":23,"text":24,"correct":14},"D","竣工验收阶段","工程项目设计阶段是根据已确定的质量目标和水平，通过工程设计使其具体化。设计在技术上是否可行、工艺是否先进、经济是否合理、设备是否配套、结构是否安全可靠等，都将决定着工程项目建成后的使用价值和功能。因此，设计阶段是影响工程项目质量的决定性环节。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（水利工程）","建筑工程",0]