[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106684":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1106684,782,1,"单选题","承包人不得将其承接的水利建设项目的（ ）进行转包。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","临时工程",false,{"key":16,"text":17,"correct":14},"B","永久工程",{"key":19,"text":20,"correct":21},"C","主体工程",true,{"key":23,"text":24,"correct":14},"D","附属工程","本题考查的是工程质量责任体系。承包人不得将其承接的水利建设项目的主体工程进行转包。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（水利工程）","建筑工程",0]