[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106683":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1106683,782,1,"单选题","工程项目在施工过程中，由于工序交接多，中间产品多，隐蔽工程多，若不及时检查并发现其存在的质量问题，很容易产生第二类判断错误。这体现了质量具有（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","影响因素多",false,{"key":16,"text":17,"correct":14},"B","波动性大",{"key":19,"text":20,"correct":21},"C","隐蔽性",true,{"key":23,"text":24,"correct":14},"D","复杂性","本题考查的是建设工程质量的形成过程及特点。质量隐蔽性。工程项目在施工过程中，由于工序交接多，中间产品多，隐蔽工程多，若不及时检查并发现其存在的质量问题，很容易产生第二类判断错误。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（水利工程）","建筑工程",0]