[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106667":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1106667,782,1,"单选题","下列可以体现工程质量水平最终成果的阶段为（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","可行性研究报告阶段",false,{"key":16,"text":17,"correct":14},"B","设计阶段",{"key":19,"text":20,"correct":14},"C","施工阶段",{"key":22,"text":23,"correct":24},"D","验收阶段",true,"本题考查的是建设工程质量的形成过程及特点。工程验收阶段体现了工程质量水平的最终结果。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（水利工程）","建筑工程",0]