[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106548":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1106548,782,1,"单选题","如发现金属结构预埋件偏位较大，影响了后续工程的施工，必须及时分析与处理后，方可继续施工，这体现了事故分析重要性中的（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","排除隐患",false,{"key":16,"text":17,"correct":14},"B","防止事故的恶化",{"key":19,"text":20,"correct":21},"C","创造正常的施工条件",true,{"key":23,"text":24,"correct":14},"D","减少损失","本题考查的是工程质量事故分析处理程序与方法。创造正常的施工条件。如发现金属结构预埋件偏位较大，影响了后续工程的施工，必须及时分析与处理后，方可继续施工，以保证工程质量。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（水利工程）","建筑工程",0]