[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106521":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1106521,782,1,"单选题","水利工程碾压施工质量及压实度检验时，相邻作业面的搭接碾压宽度，平行填筑面轴线方向不应小于（ ）m，垂直填筑面轴线方向不应小于（ ）m。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","0.5，1.5",true,{"key":16,"text":17,"correct":18},"B","1.0，2.0",false,{"key":20,"text":21,"correct":18},"C","0.5，2.0",{"key":23,"text":24,"correct":18},"D","1.0，1.5","本题考查的是常见水利工程质量检验实例。水利工程碾压施工质量及压实度检验时，相邻作业面的搭接碾压宽度，平行填筑面轴线方向不应小于0.5m，垂直填筑面轴线方向不应小于1.5m。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（水利工程）","建筑工程",0]