[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106510":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1106510,782,1,"单选题","以下不属于按质量检验的内容及方式划分的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工预先检验",false,{"key":16,"text":17,"correct":18},"B","全数检验",true,{"key":20,"text":21,"correct":14},"C","隐蔽工程验收检验",{"key":23,"text":24,"correct":14},"D","工序交接质量检验","按质量检验的内容及方式，质量检验可分为：施工预先检验；工序交接质量检验；原材料、中间产品和工程设备质量确认检验；隐蔽工程验收检验；完工验收检验。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（水利工程）","建筑工程",0]