[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106471":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1106471,782,1,"单选题","承包人对质量控制点的控制措施设计完成后，经（ ）审核批准后方可实施。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","监理人",true,{"key":16,"text":17,"correct":18},"B","发包人",false,{"key":20,"text":21,"correct":18},"C","检测单位",{"key":23,"text":24,"correct":18},"D","设计单位","本题考查的是工艺试验及工序的质量控制。承包人对质量控制点的控制措施设计完成后，经监理人审核批准后方可实施。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（水利工程）","建筑工程",0]