[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106413":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1106413,782,1,"单选题","（ ）的质量控制不但是施工监理重要的核心内容，也是工程项目质量控制的重点。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工阶段",true,{"key":16,"text":17,"correct":18},"B","设计阶段",false,{"key":20,"text":21,"correct":18},"C","可行性研究阶段",{"key":23,"text":24,"correct":18},"D","竣工验收阶段","工程施工是使工程设计意图最终实现并形成工程实体的阶段，也是最终形成工程产品质量和工程项目使用价值的重要阶段。因此可以认为施工阶段的质量控制不但是施工监理重要的核心内容，也是工程项目质量控制的重点。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（水利工程）","建筑工程",0]