[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106399":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1106399,782,1,"单选题","施工招标过程中从办理申请招标到发出招标公告为止属于（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","招标阶段",false,{"key":16,"text":17,"correct":18},"B","招标准备阶段",true,{"key":20,"text":21,"correct":14},"C","决标阶段",{"key":23,"text":24,"correct":14},"D","定标阶段","本题考查的是工程建设项目招标规定。施工招标过程中从办理申请招标到发出招标公告为止属于招标准备阶段。参见教材P29。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（水利工程）","建筑工程",0]