[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-781-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":607},{"id":5,"name":6,"category":7,"favorite":8},781,"目标控制（交通工程）","建筑工程",0,6,50,818,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,198,210,222,234,246,254,266,274,286,298,310,322,334,345,357,369,381,393,405,417,429,441,453,465,477,489,501,513,525,537,547,559,571,583,595],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1105692,1,"单选题","当初始网络计划的计划工期与指令工期差值不大时，可采用（ ）法缩短工期。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","平均加快关键工作持续时间",true,{"key":24,"text":25,"correct":26},"B","依次压缩关键工作持续时间",false,{"key":28,"text":29,"correct":26},"C","选择压缩关键工作持续时间",{"key":31,"text":32,"correct":26},"D","加权平均加快关键工作持续时间","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1105694,"对非关键工作进行调整方法不包括（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"利用工作机动时间，推迟或提前某些非关键工作的开始时间",{"key":24,"text":41,"correct":22},"改变某些非关键工作的搭接方式，相应减少其资源用量",{"key":28,"text":43,"correct":26},"在项目实际施工条件允许的情况下，可在资源需求量超限的时段内中断某些非关键工作，以便减少资源的需要量",{"key":31,"text":45,"correct":26},"改变某些非关键工作的作业持续时间，相应减少其资源用量",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1105698,"工期与成本优化步骤不包括（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"按正常工作时间绘制初始网络计划图",{"key":24,"text":53,"correct":26},"调查研究确定整个计划的各项工作最短工期及其工程直接成本",{"key":28,"text":55,"correct":22},"根据成本最小原则，找出关键线路上直接成本斜率最大的工作优先压缩时间",{"key":31,"text":57,"correct":26},"将工期与直接成本计算结果绘制成直接成本曲线",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1105700,"关于备用库法的说法，错误的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"是一种有限资源的分配常用方法",{"key":24,"text":65,"correct":26},"考虑到尽可能地最优资源组合",{"key":28,"text":67,"correct":22},"优先安排机动时间大的工作",{"key":31,"text":69,"correct":26},"当数项工作的机动时间相等时，优先安排持续时间短的和资源强度小的工作",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1105702,"时间优化措施不包括（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"调整施工组织",{"key":24,"text":77,"correct":26},"压缩关键工作持续时间",{"key":28,"text":79,"correct":26},"计划外增加资源",{"key":31,"text":81,"correct":22},"压缩重点部位的工作时间",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1105704,"网络计划时间优化的基本方法是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"从前往后法",{"key":24,"text":89,"correct":22},"循环优化法",{"key":28,"text":91,"correct":26},"从后往前法",{"key":31,"text":93,"correct":26},"单向优化法",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1105706,"下列资源安排的方式中，目的是寻求工程网络计划资源优化的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"资源使用量最小条件下的合理工期安排",{"key":24,"text":101,"correct":26},"资源均衡使用条件下的最短工期安排",{"key":28,"text":103,"correct":26},"工程总成本最低条件下的资源均衡安排",{"key":31,"text":105,"correct":22},"工期固定条件下的资源均衡安排",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1105707,"以下属于工程直接成本的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"规费",{"key":24,"text":113,"correct":26},"财务费用",{"key":28,"text":115,"correct":26},"企业管理费用",{"key":31,"text":117,"correct":22},"机械使用费",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1105709,"（ ）决定工程的施工顺序、施工方法、资源供应方式、主要指标的控制量等，又是编制网络计划的基础。",[122,124,126,128],{"key":20,"text":123,"correct":26},"可行性研究报告",{"key":24,"text":125,"correct":22},"施工方案",{"key":28,"text":127,"correct":26},"设计图纸",{"key":31,"text":129,"correct":26},"施工合同",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1105711,"（ ）是施工生产的基本组成单位。",[134,136,138,140],{"key":20,"text":135,"correct":26},"单位工程",{"key":24,"text":137,"correct":26},"单项工程",{"key":28,"text":139,"correct":26},"分部分项工程",{"key":31,"text":141,"correct":22},"施工工序",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1105713,"（ ）在接到承包人提交的工程进度计划之后，应对进度计划进行认真的审核。",[146,148,150,152],{"key":20,"text":147,"correct":22},"监理工程师",{"key":24,"text":149,"correct":26},"项目经理",{"key":28,"text":151,"correct":26},"业主",{"key":31,"text":153,"correct":26},"建设方负责人",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},1105715,"承包人向监理人报送施工进度计划和施工方案说明的期限是签订合同协议书（ ）天之内。",[158,160,162,164],{"key":20,"text":159,"correct":26},"7",{"key":24,"text":161,"correct":26},"14",{"key":28,"text":163,"correct":22},"28",{"key":31,"text":165,"correct":26},"30",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},1105717,"对（ ）进度实施控制是公路工程进度控制的重点。",[170,172,174,176],{"key":20,"text":171,"correct":26},"方案设计阶段",{"key":24,"text":173,"correct":26},"施工前期阶段",{"key":28,"text":175,"correct":22},"施工阶段",{"key":31,"text":177,"correct":26},"可行性研究阶段",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},1105719,"监理工程师审查计划内容中，施工准备的可靠性不包括（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"所需主要材料和设备的进场计划是否已有保证",{"key":24,"text":185,"correct":26},"主要骨干人员及施工队伍的进场日期是否已经落实",{"key":28,"text":187,"correct":26},"施工测量、材料检查及标准试验的工作是否已经安排",{"key":31,"text":189,"correct":22},"建设方资金是否充足",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1105721,"监理人应在（ ）天内对承包人施工进度计划和施工方案说明予以批复或提出修改意见。",[194,195,196,197],{"key":20,"text":159,"correct":26},{"key":24,"text":161,"correct":22},{"key":28,"text":163,"correct":26},{"key":31,"text":165,"correct":26},{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":31,"analysis":33},1105723,"施工进度计划的编制原则不包括（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":26},"合理安排施工顺序，保证在劳动力、材料物资以及资金消耗量最少的情况下，按规定工期完成拟建工程施工任务",{"key":24,"text":205,"correct":26},"采用可靠的施工方法，确保工程项目的施工在连续、稳定、安全、优质、均衡的状态下进行",{"key":28,"text":207,"correct":26},"节约施工成本",{"key":31,"text":209,"correct":22},"增大利润空间",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":20,"analysis":33},1105724,"一份完整的进度计划，从（ ）角度讲是履行合同约定的保证、指导工程的依据。",[214,216,218,220],{"key":20,"text":215,"correct":22},"施工单位",{"key":24,"text":217,"correct":26},"设计单位",{"key":28,"text":219,"correct":26},"监理单位",{"key":31,"text":221,"correct":26},"建设单位",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":24,"analysis":33},1105726,"总体进度计划的编制应按照（ ）和主要工作横道图分别编绘。",[226,228,230,232],{"key":20,"text":227,"correct":26},"双代号网络图",{"key":24,"text":229,"correct":22},"工作横道图",{"key":28,"text":231,"correct":26},"单代号网络图",{"key":31,"text":233,"correct":26},"时标网络图",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":28,"analysis":33},1105728,"某工作实施过程中的S曲线如下图所示，图中a和b两点的进度偏差状态是（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":26},"a点进度拖后和b点进度拖后",{"key":24,"text":241,"correct":26},"a点进度拖后和b点进度超前",{"key":28,"text":243,"correct":22},"a点进度超前和b点进度拖后",{"key":31,"text":245,"correct":26},"a点进度超前和b点进度超前",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":28,"analysis":33},1105730,"承包人按约定的合同进度计划在签订合同协议书后（ ）天内，向监理工程师提交合同段总体开工申请。",[250,251,252,253],{"key":20,"text":159,"correct":26},{"key":24,"text":161,"correct":26},{"key":28,"text":163,"correct":22},{"key":31,"text":165,"correct":26},{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":24,"analysis":33},1105732,"发包人有权要求承包人相应延长缺陷责任期，但缺陷责任期最长不超过（ ）年。",[258,260,262,264],{"key":20,"text":259,"correct":26},"1",{"key":24,"text":261,"correct":22},"2",{"key":28,"text":263,"correct":26},"3",{"key":31,"text":265,"correct":26},"4",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":24,"analysis":33},1105734,"如果承包人在接到监理人通知后的（ ）天内，未能采取加快工程进度的措施，致使实际工程进度进一步滞后，仍无法按预计工期交工时，监理人应立即通知发包人。",[270,271,272,273],{"key":20,"text":159,"correct":26},{"key":24,"text":161,"correct":22},{"key":28,"text":163,"correct":26},{"key":31,"text":165,"correct":26},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":31,"analysis":33},1105736,"施工单位提交的月进度报告的内容不包括（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":26},"概况或总说明",{"key":24,"text":281,"correct":26},"工程进度",{"key":28,"text":283,"correct":26},"财务状况",{"key":31,"text":285,"correct":22},"人员信息",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":31,"analysis":33},1105737,"以下不属于不可抗力事件的是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":26},"地震",{"key":24,"text":293,"correct":26},"战乱",{"key":28,"text":295,"correct":26},"台风",{"key":31,"text":297,"correct":22},"夏季连续降雨",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":31,"analysis":33},1105739,"以下不属于每日进度记录内容的是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":26},"当日施工停滞的人力、机械数量及其原因",{"key":24,"text":305,"correct":26},"当日实际完成以及累计完成的工程量",{"key":28,"text":307,"correct":26},"当日的天气情况",{"key":31,"text":309,"correct":22},"当日的进场人员健康状况",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},1105741,"以下不属于压缩关键工作持续时间中组织措施的是（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":26},"增加工作面",{"key":24,"text":317,"correct":26},"增加关键工作的资源投入",{"key":28,"text":319,"correct":26},"增加每天的施工时间",{"key":31,"text":321,"correct":22},"采用先进的施工机械",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":28,"analysis":33},1105743,"以下关于工程提前的说法，错误的是（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":26},"发包人要求承包人提前竣工，应由监理人与承包人共同协商采取加快工程进度的措施和修订合同进度计划",{"key":24,"text":329,"correct":26},"发包人要求承包人提前竣工，发包人应承担承包人由此增加的费用",{"key":28,"text":331,"correct":22},"发包人要求承包人提前竣工，向承包人支付通用合同条款约定的相应奖金",{"key":31,"text":333,"correct":26},"发包人不得随意要求承包人提前交工",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":28,"analysis":33},1105745,"异常气候是指项目所在地（ ）年以上一遇的罕见气候现象（包括温度、降水、降雪、风等）。",[338,340,342,343],{"key":20,"text":339,"correct":26},"10",{"key":24,"text":341,"correct":26},"20",{"key":28,"text":165,"correct":22},{"key":31,"text":344,"correct":26},"40",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":24,"analysis":33},1105747,"逾期交工违约金的计算方法在项目（ ）数据表中约定。",[349,351,353,355],{"key":20,"text":350,"correct":26},"协议书",{"key":24,"text":352,"correct":22},"专用合同条款",{"key":28,"text":354,"correct":26},"通用合同条款",{"key":31,"text":356,"correct":26},"招标文件",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":20,"analysis":33},1105749,"“费用”一词，公路工程项目在不同阶段有不同的称谓，在项目建议书及可行性研究阶段称为（ ）。",[361,363,365,367],{"key":20,"text":362,"correct":22},"估算",{"key":24,"text":364,"correct":26},"预算",{"key":28,"text":366,"correct":26},"概算",{"key":31,"text":368,"correct":26},"投标价",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":28,"analysis":33},1105751,"（ ）是开展公路工程费用监理工作的前提。",[373,375,377,379],{"key":20,"text":374,"correct":26},"公路工程经济知识",{"key":24,"text":376,"correct":26},"监理职业道德",{"key":28,"text":378,"correct":22},"公路工程管理知识",{"key":31,"text":380,"correct":26},"市场经济法律知识",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":31,"analysis":33},1105752,"“费用”在工程项目竣工或合同结束时称之为（ ）。",[385,387,389,391],{"key":20,"text":386,"correct":26},"设计概算",{"key":24,"text":388,"correct":26},"投资估算",{"key":28,"text":390,"correct":26},"合同价",{"key":31,"text":392,"correct":22},"决算价",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":24,"analysis":33},1105754,"工程费用监理的措施中，经济措施和（ ）相结合是控制工程费用的有效手段。",[397,399,401,403],{"key":20,"text":398,"correct":26},"组织措施",{"key":24,"text":400,"correct":22},"技术措施",{"key":28,"text":402,"correct":26},"合同措施",{"key":31,"text":404,"correct":26},"环保措施",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":24,"analysis":33},1105756,"关于工程费用监理，下列说法中，错误的是（ ）。",[409,411,413,415],{"key":20,"text":410,"correct":26},"控制施工“合同价格”的核心环节",{"key":24,"text":412,"correct":22},"质量控制的核心手段",{"key":28,"text":414,"correct":26},"进度控制的重要辅助手段",{"key":31,"text":416,"correct":26},"保护承包人合法权益的重要途径",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":28,"analysis":33},1105760,"下列关于工程费用监理的目标说法中错误的是（ ）。",[421,423,425,427],{"key":20,"text":422,"correct":26},"费用监理人员应做到工程量清单内的项目，准确及时地进行支付",{"key":24,"text":424,"correct":26},"目标控制是开展各项工作的核心",{"key":28,"text":426,"correct":22},"工程量清单外的项目，支付不需经过监理机构或业主的书面批准",{"key":31,"text":428,"correct":26},"“签约合同价”是指签订合同时合同协议书中写明的，包括了暂列金额、暂估价的合同总金额",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":20,"analysis":33},1105762,"下列选项不属于工程费用监理工作任务的是（ ）。",[433,435,437,439],{"key":20,"text":434,"correct":22},"明确组织结构，明确费用监理工作人员",{"key":24,"text":436,"correct":26},"协助建设单位审查施工招标文件",{"key":28,"text":438,"correct":26},"审查施工单位提交的资金流计划",{"key":31,"text":440,"correct":26},"协助建设单位进行竣工决算",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":24,"analysis":33},1105764,"下列选项中不属于监理人员在费用监理中的权力的是（ ）。",[445,447,449,451],{"key":20,"text":446,"correct":26},"工程计量权、付款审批权和付款签证权",{"key":24,"text":448,"correct":22},"审核工程变更、费用索赔",{"key":28,"text":450,"correct":26},"变更工程造价的确定权",{"key":31,"text":452,"correct":26},"工程变更的单价确认权",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":20,"analysis":33},1105766,"生产经营单位未如实记录安全生产教育和培训情况，逾期未改正的,责令停产停业整顿，对其直接负责的主管人员和其他直接责任人员处罚款妥当的是（ ）",[457,459,461,463],{"key":20,"text":458,"correct":22},"15000",{"key":24,"text":460,"correct":26},"10000",{"key":28,"text":462,"correct":26},"25000",{"key":31,"text":464,"correct":26},"5000",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":20,"analysis":33},1105768,"生产经营单位未按照规定对从业人员、被派遣劳动者、实习学生进行安全生产教育和培训，或者未按 照规定如实告知有关的安全生产事项，责令限期改正，可以处（ ）以下的罚款",[469,471,473,475],{"key":20,"text":470,"correct":22},"五万元",{"key":24,"text":472,"correct":26},"三万元",{"key":28,"text":474,"correct":26},"四万元",{"key":31,"text":476,"correct":26},"二万元",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":20,"analysis":33},1105769,"（ ）是指企业的生产组织领导者必须在计划、布置、检查、总结、评 比生产工作的同时进行计划、布置、检查、总结、评比安全工作的原则。它要求把安全工作落实到每一个生产组织管理环节中去。这是解决生产管理中安全与生产统一的一项重要原则。",[481,483,485,487],{"key":20,"text":482,"correct":22},"安全工作的五同时原则",{"key":24,"text":484,"correct":26},"三管三必须原则",{"key":28,"text":486,"correct":26},"三同时原则",{"key":31,"text":488,"correct":26},"安全生产动态管理原则",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":20,"analysis":33},1105771,"施工单位在工程中使用施工起重机械和整体提升式脚手架、滑模爬模、架桥机等自行式架设设施前，应当组织有关单位进行验收，或者委托具有相应资质的检验检测机构进行验收。使用承租的机械设备和施工机具及配件的，由承租单位、出租单位和安装单位共同进行验收，验收合格方可使用。验收合格后（ ）之内,应当向当地交通运输主管部门登记。",[493,495,497,499],{"key":20,"text":494,"correct":22},"30日",{"key":24,"text":496,"correct":26},"10日",{"key":28,"text":498,"correct":26},"7日",{"key":31,"text":500,"correct":26},"15日",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":31,"analysis":33},1105773,"以下不属于建设工程批准文件的是（ ）",[505,507,509,511],{"key":20,"text":506,"correct":26},"建设工程规划许可证",{"key":24,"text":508,"correct":26},"施工许可证以及初步设计文件",{"key":28,"text":510,"correct":26},"施工图设计文件",{"key":31,"text":512,"correct":22},"设单位与施工单位签订的有关建设工程合同",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":24,"analysis":33},1105775,"生产经营单位的主要负责人未履行本法规定的安全生产管理职责，导致发生生产安全较大事故的事故的，由安全生产监督管理部门依照下列规定处以罚款（ ）",[517,519,521,523],{"key":20,"text":518,"correct":26},"处上一年年收人百分之三十的罚款",{"key":24,"text":520,"correct":22},"处上一年年收入百分之四十的罚款",{"key":28,"text":522,"correct":26},"处上一年年收人百分之六十的罚款",{"key":31,"text":524,"correct":26},"处上一年年收人百分之八十的罚款",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":24,"analysis":33},1105777,"工程监理单位未对施工组织设计中的安全技术措施或者专项施工方案进行审查，责令限期改正;逾期未改正的，责令停业整顿，并处（ ）的罚款;",[529,531,533,535],{"key":20,"text":530,"correct":26},"5万元以上10万元以下",{"key":24,"text":532,"correct":22},"10万元以上30万元以下",{"key":28,"text":534,"correct":26},"15万元以上35万元以下",{"key":31,"text":536,"correct":26},"20万元以上30万元以下",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":20,"analysis":33},1105779,"工程建设法规体系按其立法权限不同，分为（ ）个层次。",[541,543,544,545],{"key":20,"text":542,"correct":22},"5",{"key":24,"text":263,"correct":26},{"key":28,"text":265,"correct":26},{"key":31,"text":546,"correct":26},"6",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":28,"analysis":33},1105781,"我国安全生产的方针说法错误的是（ ）",[551,553,555,557],{"key":20,"text":552,"correct":26},"安全第一,就是在生产过程中把安全放在第一重要的位置上,切实保护劳动者的生命安全和身体健康。",{"key":24,"text":554,"correct":26},"当安全与生产发生矛盾时，必须先解决安全问题，在保证安全的前提下从事生产活动，也 只有这样才能使生产正常进行，促进经济发展，保持社会稳定。",{"key":28,"text":556,"correct":22},"“预防为主”是手段和基本途径，就是要把安全生产工作的关口后移",{"key":31,"text":558,"correct":26},"“综合治理”是落实安全生产方针政策、法律法规的有效手段",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":20,"analysis":33},1105783,"安全生产管理的原则描述错误的是（ ）",[563,565,567,569],{"key":20,"text":564,"correct":22},"一岗一责",{"key":24,"text":566,"correct":26},"三管三必须",{"key":28,"text":568,"correct":26},"三同时",{"key":31,"text":570,"correct":26},"安全生产动态管理",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":31,"analysis":33},1105785,"因违法违规行为导致工程建设项目发生一般及以上等级的生产安全责任事故并承担主要责任的，交通运输主管部门对从业单位及其直接负责的主管和其他直接责任人员给予违法违规行为失信记录并对外公开，公开期限一般自公布之日起（ ）",[575,577,579,581],{"key":20,"text":576,"correct":26},"10个月",{"key":24,"text":578,"correct":26},"3个月",{"key":28,"text":580,"correct":26},"6个月",{"key":31,"text":582,"correct":22},"12个月",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":24,"analysis":33},1105786,"公路建设工程安全监理在我国公路建设领域巳推行多年，在公路建设工程中发挥了重要 作用，也取得了显著的成效,其作用主要表现在以下几个方面，描述错误的是（ ）",[587,589,591,593],{"key":20,"text":588,"correct":26},"有利于防止或减少生产安全事故，保障人民群众生命和财产安全",{"key":24,"text":590,"correct":22},"有利于实现工程投资效益平均化",{"key":28,"text":592,"correct":26},"有利于规范工程建设参与各方主体的安全生产行为",{"key":31,"text":594,"correct":26},"有利于建设工程安全生产保证机制的形成",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":31,"analysis":33},1105788,"安全生产考核指标隐患类的是（ ）",[599,601,603,605],{"key":20,"text":600,"correct":26},"安全生产总目标",{"key":24,"text":602,"correct":26},"安全生产管理人员到位率",{"key":28,"text":604,"correct":26},"事故起数",{"key":31,"text":606,"correct":22},"重大事故隐患整改率",[608,611,614,617,620,623],{"id":15,"name":609,"category":7,"favorite":610},"领导干部任职前廉政法规知识测试题",92,{"id":612,"name":613,"category":7,"favorite":15},595,"建筑结构与设备",{"id":615,"name":616,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":618,"name":619,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":621,"name":622,"category":7,"favorite":8},534,"BIM工程师",{"id":624,"name":622,"category":7,"favorite":8},535]