[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-781-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":593},{"id":5,"name":6,"category":7,"favorite":8},781,"目标控制（交通工程）","建筑工程",0,5,50,818,[13,34,46,58,70,82,94,104,116,127,139,151,163,175,187,197,207,219,228,240,252,264,276,288,297,309,321,333,345,357,369,379,389,401,411,420,432,442,454,466,478,490,502,514,523,533,545,557,569,581],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1105598,1,"单选题","变更工程单价的首要依据是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","采用计日工单价作计价依据",false,{"key":24,"text":25,"correct":22},"B","对工程量清单中的相应单价进行变更",{"key":27,"text":28,"correct":22},"C","协商确定新工程子目的单价",{"key":30,"text":31,"correct":32},"D","采用工程量清单中相应工程子目的单价",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1105600,"承包人应在发出索赔意向通知书后（ ）内，向监理人正式递交索赔通知书。",[38,40,42,44],{"key":20,"text":39,"correct":22},"7",{"key":24,"text":41,"correct":22},"14",{"key":27,"text":43,"correct":32},"28",{"key":30,"text":45,"correct":22},"42",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1105602,"监理人在审批费用索赔时，应坚持的原则不含（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":32},"自由心证原则",{"key":24,"text":53,"correct":22},"分级审批原则",{"key":27,"text":55,"correct":22},"恪守合同原则",{"key":30,"text":57,"correct":22},"公平合理原则",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1105604,"从建设单位、监理单位、施工单位等建设工程三方的单独使用或联合使用情况划分，可分为施工单位独立用表、监理单位独立用表和（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"签署确认表",{"key":24,"text":65,"correct":22},"支付申请表",{"key":27,"text":67,"correct":22},"辅助用表",{"key":30,"text":69,"correct":32},"联合用表",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1105605,"工程费用监理工作的常用表格可以分为工程计量表格和（ ）两类。",[74,76,78,80],{"key":20,"text":75,"correct":22},"费用计量表格",{"key":24,"text":77,"correct":32},"费用支付表格",{"key":27,"text":79,"correct":22},"监理计量表格",{"key":30,"text":81,"correct":22},"费用支出表格",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1105607,"公路工程组织流水施工时，某专业工作队在单位时间内所完成的工程量称为（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"流水节拍",{"key":24,"text":89,"correct":22},"流水步距",{"key":27,"text":91,"correct":32},"流水能力",{"key":30,"text":93,"correct":22},"流水节奏",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1105609,"公路工程组织流水施工时，相邻两个专业工作队相继开始施工的最小间隔时间称为（ ）。",[98,100,101,102],{"key":20,"text":99,"correct":22},"间歇时间",{"key":24,"text":89,"correct":32},{"key":27,"text":87,"correct":22},{"key":30,"text":103,"correct":22},"提前插入时间",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":20,"analysis":33},1105611,"下列计算式中，对流水节拍的计算正确的是（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":32},"流水节拍=工程量\u002F（每工日或每台班产量×施工班组人数或施工机械台班数）",{"key":24,"text":111,"correct":22},"流水节拍=工程量\u002F工程分段个数",{"key":27,"text":113,"correct":22},"流水节拍=工程量\u002F工程分包商个数",{"key":30,"text":115,"correct":22},"流水节拍=工程量\u002F工程施工时间×单位施工费用",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":24,"analysis":33},1105613,"流水步距的数目取决于（ ）。",[120,122,124,125],{"key":20,"text":121,"correct":22},"工作面",{"key":24,"text":123,"correct":32},"参加流水的施工过程数",{"key":27,"text":87,"correct":22},{"key":30,"text":126,"correct":22},"施工段数",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":20,"analysis":33},1105614,"流水施工的基本组织方式包括（ ）。",[131,133,135,137],{"key":20,"text":132,"correct":32},"非节拍流水施工、有节拍流水施工",{"key":24,"text":134,"correct":22},"异节拍流水施工、等节拍流水施工",{"key":27,"text":136,"correct":22},"非节拍流水施工、等节拍流水施工",{"key":30,"text":138,"correct":22},"等节拍流水施工、有节拍流水施工",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":27,"analysis":33},1105616,"桥梁基础工程包括开挖、支摸、浇筑混凝土及回填四个施工过程，分3个施工段组织流水作业，流水节拍见下表，则该基础工程的流水施工工期为（ ）天。 流水节拍（单位：天）",[143,145,147,149],{"key":20,"text":144,"correct":22},"17",{"key":24,"text":146,"correct":22},"20",{"key":27,"text":148,"correct":32},"23",{"key":30,"text":150,"correct":22},"24",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":27,"analysis":33},1105618,"当用S型曲线进行实际进度与计划进度比较时，如果实际进度点落在计划S型曲线的下方，则通过比较可以获得的信息是（ ）。",[155,157,159,161],{"key":20,"text":156,"correct":22},"工作实际进度超前的时间和超额完成的任务量",{"key":24,"text":158,"correct":22},"工程项目实际进度超前的时间和超额完成的任务量",{"key":27,"text":160,"correct":32},"工作实际进度拖后的时间和拖欠的任务量",{"key":30,"text":162,"correct":22},"工程项目实际进度拖后的时间和拖欠的任务量",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":27,"analysis":33},1105620,"将拟建工程项目中的每一个施工对象分解为若干个施工过程，并按照施工过程成立相应的专业工作队，各专业队按照施工顺序依次完成各个施工对象的施工过程，同时保证施工在时间和空间上连续、均衡和有节奏地进行，使相邻两专业队能最大限度地搭接作业。这种方式的施工是（ ）。",[167,169,171,173],{"key":20,"text":168,"correct":22},"顺序作业法",{"key":24,"text":170,"correct":22},"平行作业法",{"key":27,"text":172,"correct":32},"流水作业法",{"key":30,"text":174,"correct":22},"混合作业法",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":27,"analysis":33},1105622,"工作面的大小表明（ ）。",[179,181,183,185],{"key":20,"text":180,"correct":22},"能划分施工段的多少",{"key":24,"text":182,"correct":22},"空间位置的多少",{"key":27,"text":184,"correct":32},"能安排施工人数或机械台数的多少",{"key":30,"text":186,"correct":22},"能完成工程量的多少",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":20,"analysis":33},1105623,"（ ）表明流水施工的速度和节奏性。",[191,192,193,195],{"key":20,"text":87,"correct":32},{"key":24,"text":89,"correct":22},{"key":27,"text":194,"correct":22},"流水强度",{"key":30,"text":196,"correct":22},"施工过程",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":30,"analysis":33},1105625,"某分部工程有3个施工过程，分为4个施工段组织流水施工。各施工过程的流水节拍分别为3天、5天、4天、3天，3天、4天、4天、2天和4天、3天、3天、4天，则流水施工工期为（ ）天。",[201,202,204,206],{"key":20,"text":146,"correct":22},{"key":24,"text":203,"correct":22},"21",{"key":27,"text":205,"correct":22},"22",{"key":30,"text":148,"correct":32},{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":27,"analysis":33},1105627,"（ ）是工程进度曲线规定的允许界限线。",[211,213,215,217],{"key":20,"text":212,"correct":22},"工程进度曲线",{"key":24,"text":214,"correct":22},"S曲线",{"key":27,"text":216,"correct":32},"进度管理曲线",{"key":30,"text":218,"correct":22},"前锋线",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":20,"analysis":33},1105629,"（ ）是建立在横道图的基础上的。",[223,224,225,226],{"key":20,"text":212,"correct":32},{"key":24,"text":214,"correct":22},{"key":27,"text":218,"correct":22},{"key":30,"text":227,"correct":22},"“香蕉”型曲线",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":24,"analysis":33},1105631,"（ ）是施工过程中生产出来的产品结果。",[232,234,236,238],{"key":20,"text":233,"correct":22},"工程工期",{"key":24,"text":235,"correct":32},"工程质量",{"key":27,"text":237,"correct":22},"工程费用",{"key":30,"text":239,"correct":22},"工程安全",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":20,"analysis":33},1105633,"（ ）是施工组织的基本单位。",[244,246,248,250],{"key":20,"text":245,"correct":32},"工序",{"key":24,"text":247,"correct":22},"操作过程",{"key":27,"text":249,"correct":22},"人员",{"key":30,"text":251,"correct":22},"时间",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":20,"analysis":33},1105634,"按（ ），可分为双代号网络图和单代号网络图。",[256,258,260,262],{"key":20,"text":257,"correct":32},"箭线和节点表达的含义不同",{"key":24,"text":259,"correct":22},"箭线长短与工作持续时间的关系",{"key":27,"text":261,"correct":22},"计划目标的多少",{"key":30,"text":263,"correct":22},"工程项目的组成及其应用范围",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":30,"analysis":33},1105636,"不属于施工准备过程内容的是（ ）。",[268,270,272,274],{"key":20,"text":269,"correct":22},"项目施工组织机构及其人员配备与主要机械的计划与名单，是否进场或将于何日进场",{"key":24,"text":271,"correct":22},"用于工程的进口材料及机械、仪器和设备是否进场或将于何日进场，是否会影响施工进度，并提交进场计划及清单",{"key":27,"text":273,"correct":22},"用于本工程所在地的材料来源是否落实，并提交料源分布图及供料计划清单",{"key":30,"text":275,"correct":32},"物资、料具的采购",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":30,"analysis":33},1105638,"不属于网络计划技术方法的是（ ）。",[280,282,284,286],{"key":20,"text":281,"correct":22},"关键线路法",{"key":24,"text":283,"correct":22},"计划评审方法",{"key":27,"text":285,"correct":22},"搭接网络计划",{"key":30,"text":287,"correct":32},"专家打分法",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":24,"analysis":33},1105640,"当有若干个工程项目，或者将工程项目划分几个施工段或几个作业点时，建立若干个施工班组，分别同时按工艺顺序施工的作业方法是（ ）。",[292,293,294,295],{"key":20,"text":168,"correct":22},{"key":24,"text":170,"correct":32},{"key":27,"text":172,"correct":22},{"key":30,"text":296,"correct":22},"连续作业法",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},1105642,"各道工序的流水节拍在各个施工段上完全相等，且工序之间的流水节拍也完全相等的是（ ）。",[301,303,305,307],{"key":20,"text":302,"correct":32},"稳定流水",{"key":24,"text":304,"correct":22},"分别流水",{"key":27,"text":306,"correct":22},"成倍节拍流水",{"key":30,"text":308,"correct":22},"无节拍流水",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":24,"analysis":33},1105644,"计划工期属于（ ）阶段进度控制的目标。",[313,315,317,319],{"key":20,"text":314,"correct":22},"执行检查",{"key":24,"text":316,"correct":32},"编制计划",{"key":27,"text":318,"correct":22},"调整计划",{"key":30,"text":320,"correct":22},"方案定稿",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":20,"analysis":33},1105645,"施工组织的主要研究对象是（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":32},"施工过程中的时间问题",{"key":24,"text":328,"correct":22},"施工过程中的质量问题",{"key":27,"text":330,"correct":22},"施工过程中的成本问题",{"key":30,"text":332,"correct":22},"施工过程中的安全问题",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":20,"analysis":33},1105647,"以下关于建设各方进度控制的主要任务的说法，错误的是（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":32},"施工单位应按工程承包合同要求及时提供施工场地和图纸，并尽可能地改善施工环境",{"key":24,"text":340,"correct":22},"施工单位的任务是编制施工进度计划，并在计划执行过程中定期地、经常地通过实际进度与计划进度的检查、比较并实施调整",{"key":27,"text":342,"correct":22},"审批施工单位编制的施工进度计划是否符合施工合同工期管理约定属于监理工程师的任务",{"key":30,"text":344,"correct":22},"主要工程项目是否有遗漏，劳动力、材料、机械设备等是否满足进度要求也是属于监理工程师的任务",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":27,"analysis":33},1105649,"关于双代号网络计划中的虚箭线，下列说法中不正确的是（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":22},"虚箭线主要用来表达相关工作的逻辑关系",{"key":24,"text":352,"correct":22},"虚箭线所代表的工作不消耗时间",{"key":27,"text":354,"correct":32},"虚箭线代表的可能是虚工作，也可能是实工作",{"key":30,"text":356,"correct":22},"虚箭线所代表的工作不消耗资源",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":27,"analysis":33},1105651,"在不影响其紧后工作最早开始时间的前提下，本工作可利用的机动时间为（ ）。",[361,363,365,367],{"key":20,"text":362,"correct":22},"总时差",{"key":24,"text":364,"correct":22},"最迟开始时间",{"key":27,"text":366,"correct":32},"自由时差",{"key":30,"text":368,"correct":22},"最迟完成时间",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":24,"analysis":33},1105653,"在工程网络计划中，（ ）是指在不影响总工期的前提下，本工作可以利用的机动时间。",[373,375,376,377],{"key":20,"text":374,"correct":22},"时间间隔",{"key":24,"text":362,"correct":32},{"key":27,"text":366,"correct":22},{"key":30,"text":378,"correct":22},"时距",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":30,"analysis":33},1105654,"在工程网络计划中，某项工作的自由时差不会超过该工作的（ ）。",[383,385,387,388],{"key":20,"text":384,"correct":22},"总时距",{"key":24,"text":386,"correct":22},"持续时间",{"key":27,"text":99,"correct":22},{"key":30,"text":362,"correct":32},{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":30,"analysis":33},1105656,"在工程网络图中，工作K的最迟完成时间为第20天，其持续时间为6天，该工作有三项紧前工作，它们的最早完成时间分别为第8天、第10天、第12天，则工作K的总时差为（ ）天。",[393,395,397,399],{"key":20,"text":394,"correct":22},"8",{"key":24,"text":396,"correct":22},"6",{"key":27,"text":398,"correct":22},"4",{"key":30,"text":400,"correct":32},"2",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":24,"analysis":33},1105658,"工作A的工作持续时间为3天，该工作有三项紧后工作，工作持续时间分别为4天、6天、3天；最迟完成时间分别为第16天、12天、11天，则工作A的最迟开始时间为第（ ）天。",[405,406,408,409],{"key":20,"text":396,"correct":22},{"key":24,"text":407,"correct":32},"3",{"key":27,"text":394,"correct":22},{"key":30,"text":410,"correct":22},"12",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":24,"analysis":33},1105660,"（ ）一般用于控制整个计划的总工期。",[415,416,417,419],{"key":20,"text":366,"correct":22},{"key":24,"text":362,"correct":32},{"key":27,"text":418,"correct":22},"最早开始时间",{"key":30,"text":364,"correct":22},{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":24,"analysis":33},1105662,"单代号网络图与双代号网络图的区别仅在于（ ）。",[424,426,428,430],{"key":20,"text":425,"correct":22},"时间参数计算规则",{"key":24,"text":427,"correct":32},"图形表达符号",{"key":27,"text":429,"correct":22},"关键路线表达",{"key":30,"text":431,"correct":22},"进度计划内容",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":24,"analysis":33},1105666,"工程网络计划中，工作E有两项紧后工作G和 H，已知工作G和工作H的最早开始时间分别为25和28，工作E的最早开始时间和持续时间分别为17和6，则工作E的自由时差为（ ）。",[436,438,439,440],{"key":20,"text":437,"correct":22},"1",{"key":24,"text":400,"correct":32},{"key":27,"text":407,"correct":22},{"key":30,"text":441,"correct":22},"5",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":20,"analysis":33},1105667,"关于单代号网络计划图的基本符号的说法，错误的是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":32},"单代号网络计划图中，一个节点表示一项具体的工作，只能用圆圈表示",{"key":24,"text":449,"correct":22},"单代号网络计划图中节点表达工作，与双代号网络计划图中箭线表示工作一样",{"key":27,"text":451,"correct":22},"在单代号网络计划图中，箭线表示工作之间的相互关系，不占用时间，也不消耗资源",{"key":30,"text":453,"correct":22},"在单代号网络计划图中，一项工作只有一个代号，不得有重复代号",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":27,"analysis":33},1105669,"关于单代号网络图时间参数计算的说法，错误的是（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"计算工作的最早可能开始时间应从网络图起点开始",{"key":24,"text":461,"correct":22},"计算工作的最迟时间应从网络图的终点开始",{"key":27,"text":463,"correct":32},"工作总时差的概念与双代号网络图不完全相同",{"key":30,"text":465,"correct":22},"由于单代号网络计划图中用节点表示工作，所以它只有工作时间参数的计算，而不存在节点时间参数的计算",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":24,"analysis":33},1105671,"关于单代号网络中关键线路确定的说法，错误的是（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":22},"单代号网络计划图中确定关键线路的方法与双代号网络计划图基本相同",{"key":24,"text":473,"correct":32},"单代号网络计划图中可用关键节点法来确定关键线路",{"key":27,"text":475,"correct":22},"单代号网络计划图中主要采用关键工作法确定关键线路",{"key":30,"text":477,"correct":22},"连接工作总时差为零的关键工作自始至终的线路就是关键线路",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":24,"analysis":33},1105673,"计划工期等于计算工期的双代号网络计划中，关于关键节点特点的说法，正确的是（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"相邻关键节点之间的工作一定是关键工作",{"key":24,"text":485,"correct":32},"以关键节点为完成节点的工作总时差和自由时差相等",{"key":27,"text":487,"correct":22},"关键节点连成的线路一定是关键线路",{"key":30,"text":489,"correct":22},"两个关键节点之间的线路一定是关键线路",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},1105675,"计算网络计划时间参数的目的之一是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"得到总工期",{"key":24,"text":497,"correct":32},"找出计划中的关键线路",{"key":27,"text":499,"correct":22},"掌握施工进度",{"key":30,"text":501,"correct":22},"控制时间节点",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":24,"analysis":33},1105677,"某分部工程中各项工作间逻辑关系见表10-1-1，相应的双代号网络计划如图10-1-1所示，图中错误有（ ）。",[506,508,510,512],{"key":20,"text":507,"correct":22},"多个终点节点",{"key":24,"text":509,"correct":32},"多个起点节点",{"key":27,"text":511,"correct":22},"工作代号重复",{"key":30,"text":513,"correct":22},"存在循环回路",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":27,"analysis":33},1105679,"某工程单代号搭接网络计划中工作 B、 D、E之间的搭接关系和时间参数如图10-4-1所示。工作D和工作E的总时差分别为6天和2天，则工作B的总时差为（ ）天。",[518,519,520,522],{"key":20,"text":407,"correct":22},{"key":24,"text":394,"correct":22},{"key":27,"text":521,"correct":32},"9",{"key":30,"text":400,"correct":22},{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":20,"analysis":33},1105681,"某工程网络计划中，工作M的持续时间为4天，工作M的三项紧后工作的最迟、开始时间分别为第21天、第18天和第15天，则工作M的最迟开始时间是第（ ）天。",[527,529,530,532],{"key":20,"text":528,"correct":32},"11",{"key":24,"text":41,"correct":22},{"key":27,"text":531,"correct":22},"15",{"key":30,"text":144,"correct":22},{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":30,"analysis":33},1105683,"双代号网络计划的网络图的三要素不包括（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":22},"箭线",{"key":24,"text":540,"correct":22},"节点",{"key":27,"text":542,"correct":22},"流",{"key":30,"text":544,"correct":32},"工作",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":20,"analysis":33},1105685,"双代号网络图应符合（ ）原则。",[549,551,553,555],{"key":20,"text":550,"correct":32},"只有一个终点节点",{"key":24,"text":552,"correct":22},"只有一个开始工作",{"key":27,"text":554,"correct":22},"起点节点可有多条内向箭线",{"key":30,"text":556,"correct":22},"终点节点可有多条外向箭线",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":24,"analysis":33},1105686,"网络计划技术是一种（ ）分析方法。",[561,563,565,567],{"key":20,"text":562,"correct":22},"定性",{"key":24,"text":564,"correct":32},"定量",{"key":27,"text":566,"correct":22},"综合",{"key":30,"text":568,"correct":22},"模糊",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":20,"analysis":33},1105688,"以下关于关键线路特性的说法，错误的是（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":32},"关键线路上各工作的自由时差均为零",{"key":24,"text":576,"correct":22},"关键线路是从网络计划起点到终点之间持续时间最长的线路",{"key":27,"text":578,"correct":22},"关键线路在网络计划中不一定只有一条，有时存在多条",{"key":30,"text":580,"correct":22},"非关键工作如果使用了总时差，就会转化为关键工作",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":30,"analysis":33},1105690,"与横道图相比，时标网络计划的优点是（ ）。",[585,587,589,591],{"key":20,"text":586,"correct":22},"能计算总工期",{"key":24,"text":588,"correct":22},"能确定关键线路",{"key":27,"text":590,"correct":22},"能进行时间参数的计算",{"key":30,"text":592,"correct":32},"能直观地反映出整个网络计划的时间进程",[594,597,600,603,606,609],{"id":15,"name":595,"category":7,"favorite":596},"领导干部任职前廉政法规知识测试题",92,{"id":598,"name":599,"category":7,"favorite":15},595,"建筑结构与设备",{"id":601,"name":602,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":604,"name":605,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":607,"name":608,"category":7,"favorite":8},534,"BIM工程师",{"id":610,"name":608,"category":7,"favorite":8},535]