[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-781-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":731},{"id":5,"name":6,"category":7,"favorite":8},781,"目标控制（交通工程）","建筑工程",0,15,50,818,[13,38,53,68,83,97,112,126,141,156,171,186,201,215,230,244,258,272,286,300,314,328,342,356,370,385,399,412,427,441,455,469,483,497,511,523,538,548,562,576,590,604,618,632,647,661,675,689,703,717],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1106275,2,"多选题","项目实际工程进度计划的优化，只能根据具体条件进行单项指标优化，具体的优化是指（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","时间优化条件是资源有限、工期最短",true,{"key":24,"text":25,"correct":26},"B","时间优化条件是成本有限、工期最短",false,{"key":28,"text":29,"correct":22},"C","成本优化条件为工期限定、成本最低",{"key":31,"text":32,"correct":26},"D","成本优化条件为资源限定、成本最低",{"key":34,"text":35,"correct":22},"E","资源优化条件为工期限定、资源均衡","ACE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1106276,"被选作压缩的各项工作应满足（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"必须是关键线路上的工作",{"key":24,"text":45,"correct":22},"该工作的持续时间不短于其最短工期",{"key":28,"text":47,"correct":26},"工作持续时间最长",{"key":31,"text":49,"correct":22},"它的成本斜率是关键线路上可压缩工作中的最小值",{"key":34,"text":51,"correct":26},"不是主体工程部分的工作","ABD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1106277,"根据资源分布函数的（ ）等指标，来衡量资源是否均衡。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"均方差",{"key":24,"text":60,"correct":22},"极差",{"key":28,"text":62,"correct":22},"资源需要量变化的频繁程度",{"key":31,"text":64,"correct":26},"平均值",{"key":34,"text":66,"correct":26},"众数","ABC",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1106278,"间接成本中的财务费用包括（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"企业经营期间短期贷款利息净支出",{"key":24,"text":75,"correct":22},"企业经营期间汇兑净损失",{"key":28,"text":77,"correct":22},"企业经营期间调剂外汇手续费",{"key":31,"text":79,"correct":22},"企业经营期间金融机构手续费",{"key":34,"text":81,"correct":26},"企业经营期间人员增加费用","ABCD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":36,"analysis":37},1106279,"削峰填谷优化步骤包括（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"计算网络计划节点时间参数，确定关键线路",{"key":24,"text":90,"correct":26},"计算工作6个时间参数",{"key":28,"text":92,"correct":22},"按节点最早时间绘时标图",{"key":31,"text":94,"correct":26},"绘制双代号网络图",{"key":34,"text":96,"correct":22},"运用削峰填谷法原理",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1106280,"循环优化方法的优点包括（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"思路简单",{"key":24,"text":104,"correct":26},"计算工作量小",{"key":28,"text":106,"correct":22},"便于理解和掌握",{"key":31,"text":108,"correct":26},"无需反复进行",{"key":34,"text":110,"correct":26},"可用计算机计算","AC",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":67,"analysis":37},1106281,"以下属于时间优化途径的有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"将连续施工的工作改为平行作业",{"key":24,"text":119,"correct":22},"将顺序作业调整为流水作业",{"key":28,"text":121,"correct":22},"缩短关键工作的持续时间",{"key":31,"text":123,"correct":26},"相应地缩短非关键工作的持续时间",{"key":34,"text":125,"correct":26},"增加资源",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},1106282,"安排各个工程项目或工作（序）的方法主要有（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"顺行法",{"key":24,"text":133,"correct":22},"逆算法",{"key":28,"text":135,"correct":26},"突出法",{"key":31,"text":137,"correct":26},"插入法",{"key":34,"text":139,"correct":22},"重点法","ABE",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},1106283,"关键工程进度计划中应反映的内容有（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"具体施工方案和施工方法",{"key":24,"text":148,"correct":22},"完成关键工程进度计划的保证措施",{"key":28,"text":150,"correct":22},"总体进度计划及各道工序的控制日期",{"key":31,"text":152,"correct":26},"固定资产估算",{"key":34,"text":154,"correct":22},"各施工阶段的人力、设备和材料的配额及运转安排","ABCE",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},1106284,"监理工程师审查计划内容包括（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":26},"人员安排的可行性",{"key":24,"text":163,"correct":22},"工期和时间安排的合理性",{"key":28,"text":165,"correct":22},"施工准备的可靠性",{"key":31,"text":167,"correct":22},"计划目标与施工能力的适应性",{"key":34,"text":169,"correct":26},"计划执行的准确性","BCD",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},1106285,"年度进度计划的主要作用有（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"统一安排全年内各正在施工或将要开工工程的施工",{"key":24,"text":178,"correct":26},"确定（季）月施工任务",{"key":28,"text":180,"correct":22},"根据年度季节、气候的不同，合理安排施工进度",{"key":31,"text":182,"correct":22},"确定各项年度生产指标",{"key":34,"text":184,"correct":26},"进行月施工各项指标的平衡、汇总","ACD",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":200,"analysis":37},1106286,"审查工作包括（ ）。",[190,192,194,196,198],{"key":20,"text":191,"correct":22},"阅读文件、列出问题、进行调查了解",{"key":24,"text":193,"correct":26},"出访调研",{"key":28,"text":195,"correct":22},"提出问题，不断地和与承包人进行讨论、澄清",{"key":31,"text":197,"correct":22},"对有问题的部分进行分析，向承包人提出修改意见并要求承包人反馈",{"key":34,"text":199,"correct":22},"审查批准承包人修改后的进度计划","ACDE",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":82,"analysis":37},1106287,"在承包人提交的工程总体进度计划中，应当反映出（ ）。",[205,207,209,211,213],{"key":20,"text":206,"correct":22},"完成各单位工程及各施工阶段所需要的工期、最早开始和最迟结束的时间",{"key":24,"text":208,"correct":22},"各单位工程及各施工阶段需要完成的工程量及现金流动估算",{"key":28,"text":210,"correct":22},"工程施工项目的合同工期",{"key":31,"text":212,"correct":22},"各单位工程或分部工程的施工方案和施工组织设计",{"key":34,"text":214,"correct":26},"总体工程量大小",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":229,"analysis":37},1106288,"某工程双代号时标网络计划执行到第6周末和第11周末时，检查其实际进度如下图前锋线所示，检查结果表明（ ）。",[219,221,223,225,227],{"key":20,"text":220,"correct":26},"第6周末检查时，工作A拖后1周，不影响总工期",{"key":24,"text":222,"correct":26},"第6周末检查时，工作E提前1周，不影响总工期",{"key":28,"text":224,"correct":26},"第6周末检查时，工作C提前1周，预计总工期缩短1周",{"key":31,"text":226,"correct":22},"第11周末检查时，工作G拖后1周，不影响总工期",{"key":34,"text":228,"correct":22},"第11周末检查时，工作H提前1周，预计总工期缩短1周","DE",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":200,"analysis":37},1106289,"（ ）会影响建设施工进度。",[234,236,238,240,242],{"key":20,"text":235,"correct":22},"实际到达现场的施工机械型号、数量和到达日期，是否与计划一致",{"key":24,"text":237,"correct":26},"施工现场人员的装备是否安全",{"key":28,"text":239,"correct":22},"施工单位技术和施工人员的到达情况",{"key":31,"text":241,"correct":22},"建设单位提供现场、通道的时间对工程施工有无影响",{"key":34,"text":243,"correct":22},"各分项工程开工、完工时间及进展情况",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":82,"analysis":37},1106290,"监理工程师在审查和批准工程延期时应遵循（ ）。",[248,250,252,254,256],{"key":20,"text":249,"correct":22},"只有非承包人自身原因引起的工程延期才可以受理",{"key":24,"text":251,"correct":22},"工程延期是否会推迟工程项目总工期，若只是局部工程受到影响，承包人应考虑可否采取其他措施予以弥补，而不应考虑推迟工程项目的总工期",{"key":28,"text":253,"correct":22},"所延期的工程项目是否在工程施工进度计划的关键线路上，若是非关键线路上的关键工序，监理工程师亦不应考虑延长总工期",{"key":31,"text":255,"correct":22},"恶劣气候条件造成工程延期，监理工程师审批时应考虑整个分项工期内良好气候予以的补偿",{"key":34,"text":257,"correct":26},"在非承包人原因造成的工期延期发生后7天内，承包人应向监理工程师提出延期意向要求",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":155,"analysis":37},1106291,"监理工程师在收到承包人提交的合同段开工申请后进行审核，审核主要包括（ ）。",[262,264,266,268,270],{"key":20,"text":263,"correct":22},"计划投入的机械设备、主要的管理和技术人员",{"key":24,"text":265,"correct":22},"工程质量、安全保证体系",{"key":28,"text":267,"correct":22},"承包人的机械设备进场数量",{"key":31,"text":269,"correct":26},"建设方的材料数量",{"key":34,"text":271,"correct":22},"工地试验的设备",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":140,"analysis":37},1106292,"施工单位原因的延误防范措施包括（ ）。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"加强组织管理，理顺施工单位的内部管理体系",{"key":24,"text":279,"correct":22},"编制进度计划时，应留有一定的余地，应考虑正常情况下气候原因对施工的影响",{"key":28,"text":281,"correct":26},"保证工程建设资金的及时到位",{"key":31,"text":283,"correct":26},"应做好征地拆迁工作，避免造成工程的延误",{"key":34,"text":285,"correct":22},"施工人员的安排应合理，以满足施工需要",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":185,"analysis":37},1106293,"施工进度计划的实施保证，从内容上可概括为（ ）。",[290,292,294,296,298],{"key":20,"text":291,"correct":22},"组织保证",{"key":24,"text":293,"correct":26},"质量保证",{"key":28,"text":295,"correct":22},"技术保证",{"key":31,"text":297,"correct":22},"合同保证",{"key":34,"text":299,"correct":26},"安全保证",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":155,"analysis":37},1106294,"延期评估应主要从以下哪些方面进行评定？（ ）",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"施工单位提交的申请资料必须真实、齐全，满足评审需要",{"key":24,"text":307,"correct":22},"申请延期的合同依据必须准确",{"key":28,"text":309,"correct":22},"申请延期的理由必须正确与充分",{"key":31,"text":311,"correct":26},"申请延期的主要负责人必须中层管理以上职位",{"key":34,"text":313,"correct":22},"申请延期天数的计算原则与方法应恰当",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":82,"analysis":37},1106295,"工程费用监理的措施包括（ ）。",[318,320,322,324,326],{"key":20,"text":319,"correct":22},"组织措施",{"key":24,"text":321,"correct":22},"经济措施",{"key":28,"text":323,"correct":22},"技术措施",{"key":31,"text":325,"correct":22},"合同措施",{"key":34,"text":327,"correct":26},"管理措施",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":67,"analysis":37},1106296,"从监理措施采取的时间不同分类，可以将费用监理分为（ ）。",[332,334,336,338,340],{"key":20,"text":333,"correct":22},"事前监理",{"key":24,"text":335,"correct":22},"事中监理",{"key":28,"text":337,"correct":22},"事后监理",{"key":31,"text":339,"correct":26},"旁站监理",{"key":34,"text":341,"correct":26},"监督检查",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":170,"analysis":37},1106297,"根据监理措施采取的时间进行分类，则费用监理分类包括（ ）。",[346,348,350,352,354],{"key":20,"text":347,"correct":26},"纵向监理",{"key":24,"text":349,"correct":22},"前馈监理",{"key":28,"text":351,"correct":22},"过程监理",{"key":31,"text":353,"correct":22},"反馈监理",{"key":34,"text":355,"correct":26},"横向监理",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":82,"analysis":37},1106298,"工程费用监理的工作原则包括（ ）。",[360,362,364,366,368],{"key":20,"text":361,"correct":22},"遵守法律法规的原则",{"key":24,"text":363,"correct":22},"恪守合同条款的原则",{"key":28,"text":365,"correct":22},"恪守公正公平的原则",{"key":31,"text":367,"correct":22},"坚持准确及时的原则",{"key":34,"text":369,"correct":26},"坚持安全至上的原则",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":384,"analysis":37},1106299,"工程监理单位监理工作人员在开展费用监理工作的过程中，应遵循的依据包括（ ）。",[374,376,378,380,382],{"key":20,"text":375,"correct":26},"工程施工现场的地质土质和地貌",{"key":24,"text":377,"correct":22},"工程招标文件及其补遗书、修正澄清书",{"key":28,"text":379,"correct":22},"工程施工合同协议书",{"key":31,"text":381,"correct":22},"工程量清单计量规则",{"key":34,"text":383,"correct":22},"工程施工过程中有关的往来文件","BCDE",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":67,"analysis":37},1106300,"下列选项，属于工程费用监理的合同措施的有（ ）。",[389,391,393,395,397],{"key":20,"text":390,"correct":22},"保管好各种施工图纸、往来文件",{"key":24,"text":392,"correct":22},"参与合同协议的补充、修改工作",{"key":28,"text":394,"correct":22},"收集工程施工记录、监理记录",{"key":31,"text":396,"correct":26},"对设计变更进行技术经济比较，严格控制设计变更，单价变更",{"key":34,"text":398,"correct":26},"编制并签发支付证书",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":200,"analysis":37},1106301,"下列选项，属于工程费用监理的经济措施的有（ ）。",[403,405,407,409,410],{"key":20,"text":404,"correct":22},"及时进行工程计量",{"key":24,"text":406,"correct":26},"编制费用监理细则、工作计划和详细的工作流程图",{"key":28,"text":408,"correct":22},"审核施工单位编制的费用支付申请表",{"key":31,"text":398,"correct":22},{"key":34,"text":411,"correct":22},"定期进行费用控制的偏差分析，采取纠偏措施",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":426,"analysis":37},1106302,"下列选项，属于项目监理机构或费用监理人员的主要工作任务的有（ ）。",[416,418,420,422,424],{"key":20,"text":417,"correct":22},"熟悉工程施工现场的地质土质和地貌",{"key":24,"text":419,"correct":22},"熟悉工程施工定额、地方材料机械人工价格",{"key":28,"text":421,"correct":26},"变更工程招标文件",{"key":31,"text":423,"correct":22},"及时办理施工合同的交工结算和建设项目的竣工决算",{"key":34,"text":425,"correct":22},"做好费用监理工作的文件资料的整理归档","ABDE",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":384,"analysis":37},1106303,"下列选项属于工程费用监理人员的岗位职责的有（ ）。",[431,433,435,437,439],{"key":20,"text":432,"correct":26},"填写巡视记录、监理日志",{"key":24,"text":434,"correct":22},"审核工程变更、费用索赔",{"key":28,"text":436,"correct":22},"参与工程分包、工程延期的审查工作",{"key":31,"text":438,"correct":22},"参与项目监理机构的来往文件处理、归档工作",{"key":34,"text":440,"correct":22},"按档案管理要求对计量支付资料进行整理归档",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":426,"analysis":37},1106304,"下列选项属于工程费用监理人员的素质要求的有（ ）。",[445,447,449,451,453],{"key":20,"text":446,"correct":22},"公路工程技术知识",{"key":24,"text":448,"correct":22},"公路工程管理知识",{"key":28,"text":450,"correct":26},"公路情况调研知识",{"key":31,"text":452,"correct":22},"市场经济法律知识",{"key":34,"text":454,"correct":22},"费用监理业务知识",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":200,"analysis":37},1106305,"下列属于监理人员在费用监理中的义务的有（ ）。",[459,461,463,465,467],{"key":20,"text":460,"correct":22},"核定图纸工程量，确定工程计量“红线”的义务",{"key":24,"text":462,"correct":26},"负责绘制项目监理机构的工程进度、工程支付上墙图表",{"key":28,"text":464,"correct":22},"办理开工预付款、材料预付款的支付与扣回的义务",{"key":31,"text":466,"correct":22},"编制支付证书、经总监理工程师签认后报送建设单位的义务",{"key":34,"text":468,"correct":22},"填写巡视记录、监理日志的义务等",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":67,"analysis":37},1106306,"从业人员有权对本单位安全生产工作中存在的问题提出批评、检举、控告;有权拒绝违章指挥和强令冒险作业。生产经营单位不得进行的是（ ）",[473,475,477,479,481],{"key":20,"text":474,"correct":22},"降低其工资",{"key":24,"text":476,"correct":22},"降低其福利等待遇",{"key":28,"text":478,"correct":22},"解除劳动合同",{"key":31,"text":480,"correct":26},"听取工作问题意见",{"key":34,"text":482,"correct":26},"接受检举、控告",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":185,"analysis":37},1106307,"安全生产的五种关系描述正确的是（ ）",[487,489,491,493,495],{"key":20,"text":488,"correct":22},"安全与危险并存",{"key":24,"text":490,"correct":26},"安全与生产的矛盾",{"key":28,"text":492,"correct":22},"安全与质量同步",{"key":31,"text":494,"correct":22},"安全与进度互促",{"key":34,"text":496,"correct":26},"安全与效益不可兼顾",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":82,"analysis":37},1106308,"以下属于总监及总监办岗位职责的是（ ）",[501,503,505,507,509],{"key":20,"text":502,"correct":22},"制订监理机构的人员、设施的安全措施并组织落实",{"key":24,"text":504,"correct":22},"责组织实施安全监理工作,承担安全监理责任,组织“平安工地”考核。",{"key":28,"text":506,"correct":22},"主持编制安全监理计划",{"key":31,"text":508,"correct":22},"主持检查施工单位各项安全管理制度的制定情况，以及施工单位的资质证书和安全 生产许可证符合性。",{"key":34,"text":510,"correct":26},"定期组织召开安全例会",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":82,"analysis":37},1106309,"以下属于驻地监理工程师及驻地办岗位职责的是（ ）",[515,517,519,521,522],{"key":20,"text":516,"correct":22},"负责驻地办监理人员、设施的安全管理",{"key":24,"text":518,"correct":22},"负责驻地办安全监理工作,落实安全监理各项管理制度",{"key":28,"text":520,"correct":22},"审查施工组织设计中的安全技术措施、危险性较大工程专项施工方案和应急预案",{"key":31,"text":510,"correct":22},{"key":34,"text":506,"correct":26},{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":537,"analysis":37},1106310,"安全生产考核指标管理类的是（ ）",[527,529,531,533,535],{"key":20,"text":528,"correct":22},"安全生产总目标",{"key":24,"text":530,"correct":22},"安全生产管理人员到位率",{"key":28,"text":532,"correct":26},"事故起数",{"key":31,"text":534,"correct":26},"死亡人数",{"key":34,"text":536,"correct":26},"重大事故隐患整改率","AB",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":547,"analysis":37},1106311,"安全生产考核指标事故类的是（ ）",[542,543,544,545,546],{"key":20,"text":528,"correct":26},{"key":24,"text":530,"correct":26},{"key":28,"text":532,"correct":22},{"key":31,"text":534,"correct":22},{"key":34,"text":536,"correct":26},"CD",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":67,"analysis":37},1106312,"生产经营单位的主要负责人对本单位的安全生产工作全面负责。坚持（ ）原则。",[552,554,556,558,560],{"key":20,"text":553,"correct":22},"管业务必须管安全",{"key":24,"text":555,"correct":22},"管行业必须管安全",{"key":28,"text":557,"correct":22},"管生产经营必须管安全",{"key":31,"text":559,"correct":26},"管技术必须管安全",{"key":34,"text":561,"correct":26},"管人必须管安全",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":67,"analysis":37},1106313,"施工企业的三类安全人员是指（ ）。",[566,568,570,572,574],{"key":20,"text":567,"correct":22},"施工单位的主要负责人",{"key":24,"text":569,"correct":22},"项目负责人",{"key":28,"text":571,"correct":22},"专职安全生产管理人员",{"key":31,"text":573,"correct":26},"项目技术负责人",{"key":34,"text":575,"correct":26},"项目安全总监",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":82,"analysis":37},1106314,"工程建设法规体系按其立法权限不同，分为5个层次，分别是（ ）。",[580,582,584,586,588],{"key":20,"text":581,"correct":22},"法律",{"key":24,"text":583,"correct":22},"行政法规",{"key":28,"text":585,"correct":22},"部门规章",{"key":31,"text":587,"correct":22},"地方性法规",{"key":34,"text":589,"correct":26},"地方文件",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":82,"analysis":37},1106315,"以下关于施工安全监理的责任，正确的有（ ）。",[594,596,598,600,602],{"key":20,"text":595,"correct":22},"发现存在安全事故隐患的，应当要求施工单位整改",{"key":24,"text":597,"correct":22},"情况严重的，应当要求施工单位暂时停止施工，并及时报告建设单位",{"key":28,"text":599,"correct":22},"施工单位拒不整改或者不停止施工的，工程监理单位应当及时向有关主管部门报告",{"key":31,"text":601,"correct":22},"工程监理单位应当审查施工方案是否符合工程建设强制性标准",{"key":34,"text":603,"correct":26},"监理单位无需建立安全生产小组",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":82,"analysis":37},1106316,"事故处理“四不放过”原则（ ）。",[608,610,612,614,616],{"key":20,"text":609,"correct":22},"事故发生原因未查清不放过",{"key":24,"text":611,"correct":22},"事故责任者和职工群众没有受到教育不放过",{"key":28,"text":613,"correct":22},"安全隐患没有整改预防措施不放过",{"key":31,"text":615,"correct":22},"事故责任者不处理不放过",{"key":34,"text":617,"correct":26},"事故没有公开不放过",{"id":619,"libraryId":5,"type":15,"typeLabel":16,"stem":620,"options":621,"answer":67,"analysis":37},1106317,"安全生产费用必须用于（ ）。",[622,624,626,628,630],{"key":20,"text":623,"correct":22},"施工安全防护用具及设施的采购和更新",{"key":24,"text":625,"correct":22},"安全施工措施的落实",{"key":28,"text":627,"correct":22},"安全生产条件的改善",{"key":31,"text":629,"correct":26},"安全帽的采购",{"key":34,"text":631,"correct":26},"安全培训的落实",{"id":633,"libraryId":5,"type":15,"typeLabel":16,"stem":634,"options":635,"answer":646,"analysis":37},1106318,"安全生产考核指标包括（ ）。",[636,638,640,642,644],{"key":20,"text":637,"correct":22},"管理类",{"key":24,"text":639,"correct":26},"生产类",{"key":28,"text":641,"correct":26},"安全类",{"key":31,"text":643,"correct":22},"事故类",{"key":34,"text":645,"correct":22},"隐患类","ADE",{"id":648,"libraryId":5,"type":15,"typeLabel":16,"stem":649,"options":650,"answer":82,"analysis":37},1106319,"事故处理“四不放过”原则包括（ ）。",[651,653,655,657,659],{"key":20,"text":652,"correct":22},"事故发生原因未查清",{"key":24,"text":654,"correct":22},"事故责任者和职工群众没有受到教育",{"key":28,"text":656,"correct":22},"安全隐患没有整改预防措施",{"key":31,"text":658,"correct":22},"事故责任者不处理",{"key":34,"text":660,"correct":26},"安全管理没有得到认可",{"id":662,"libraryId":5,"type":15,"typeLabel":16,"stem":663,"options":664,"answer":384,"analysis":37},1106320,"下列情形中，施工单位不得租用的施工机械有（ ）。",[665,667,669,671,673],{"key":20,"text":666,"correct":26},"设有齐全有效安全保护装置的",{"key":24,"text":668,"correct":22},"国家明令淘汰或者禁止使用的",{"key":28,"text":670,"correct":22},"超过安全技术标准或者制造厂家规定使用年限的",{"key":31,"text":672,"correct":22},"经检验达不到安全技术标准规定的",{"key":34,"text":674,"correct":22},"没有完整安全技术档案的",{"id":676,"libraryId":5,"type":15,"typeLabel":16,"stem":677,"options":678,"answer":36,"analysis":37},1106321,"下列选项中，对于施工单位的行为，逾期未改正的，责令停产停业整顿，并处5万元以上10万元以下的罚款的有（ ）。",[679,681,683,685,687],{"key":20,"text":680,"correct":22},"未按照规定设置安全生产管理机构",{"key":24,"text":682,"correct":26},"从业单位未全面履行安全生产责任",{"key":28,"text":684,"correct":22},"未按照规定配备安全生产管理人员",{"key":31,"text":686,"correct":26},"未按批准的专项施工方案进行施工",{"key":34,"text":688,"correct":22},"主要负责人和安全生产管理人员未按照规定经考核合格",{"id":690,"libraryId":5,"type":15,"typeLabel":16,"stem":691,"options":692,"answer":155,"analysis":37},1106322,"下列选项属于安全监理的作用的有（ ）。",[693,695,697,699,701],{"key":20,"text":694,"correct":22},"减少生产安全事故",{"key":24,"text":696,"correct":22},"有利于实现工程投资效益最大化",{"key":28,"text":698,"correct":22},"有利于提高建设工程安全生产管理水平",{"key":31,"text":700,"correct":26},"有利于员工工资及时发放",{"key":34,"text":702,"correct":22},"有利于建设工程安全生产保证机制的形成",{"id":704,"libraryId":5,"type":15,"typeLabel":16,"stem":705,"options":706,"answer":426,"analysis":37},1106323,"在施工准备阶段，对于施工单位编制的施工组织设计中安全技术措施和安全专项施工方案是否符合工程建设强制性标准要求，其审查的内容有（ ）。",[707,709,711,713,715],{"key":20,"text":708,"correct":22},"施工单位编制的地下管线保护措施方案",{"key":24,"text":710,"correct":22},"分部分项工程的专项施工方案",{"key":28,"text":712,"correct":26},"项目的资金分配及使用情况",{"key":31,"text":714,"correct":22},"冬期、雨期等季节性施工方案的制订",{"key":34,"text":716,"correct":22},"施工总平面布置图",{"id":718,"libraryId":5,"type":15,"typeLabel":16,"stem":719,"options":720,"answer":537,"analysis":37},1106324,"以下关于双重预防机制建设监理的描述错误的是（ ）",[721,723,725,727,729],{"key":20,"text":722,"correct":22},"监理机构应督促并参与施工单位双重预防机制建设,在施工安全风险评估报告的基础上，开展隐患排查治理",{"key":24,"text":724,"correct":22},"在重大风险管控的基础上，开展风险分级管控",{"key":28,"text":726,"correct":26},"监理机构应审査施工单位报送的安全风险评估报告、安全风险清单、重大安全风险管控措施",{"key":31,"text":728,"correct":26},"审查重大安全事故隐患治理方案;检查施工现场安全风险分布图、安全风险公告栏，检 查作业安全风险比较图、岗位安全风险告知卡",{"key":34,"text":730,"correct":26},"参与施工单位隐患排査治理，定期检查隐患排查治理台账的建立和记录情况。",[732,736,739,742,745,748],{"id":733,"name":734,"category":7,"favorite":735},1,"领导干部任职前廉政法规知识测试题",92,{"id":737,"name":738,"category":7,"favorite":733},595,"建筑结构与设备",{"id":740,"name":741,"category":7,"favorite":733},715,"招标采购专业知识与法律法规",{"id":743,"name":744,"category":7,"favorite":733},848,"市政方向-通用基础",{"id":746,"name":747,"category":7,"favorite":8},534,"BIM工程师",{"id":749,"name":747,"category":7,"favorite":8},535]