[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-781-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":722},{"id":5,"name":6,"category":7,"favorite":8},781,"目标控制（交通工程）","建筑工程",0,14,50,818,[13,38,53,68,80,94,108,123,138,153,168,181,195,209,223,237,251,265,279,294,308,322,337,351,365,380,394,408,423,438,452,462,477,491,505,519,530,539,553,568,583,597,610,624,637,651,666,680,694,708],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1106224,2,"多选题","索赔成立的基本条件（ ）。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","有明确的合同依据",true,{"key":24,"text":25,"correct":22},"B","有具体的损害事实",{"key":27,"text":28,"correct":22},"C","索赔期限符合合同约定",{"key":30,"text":31,"correct":22},"D","索取的费用和（或）工期与损害事实相符",{"key":33,"text":34,"correct":35},"E","必须经过建设单位同意",false,"ABCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1106225,"发包人违约的情形包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":35},"承包人未能按期开工",{"key":24,"text":45,"correct":22},"发包人原因造成停工的",{"key":27,"text":47,"correct":22},"发包人无法继续履行合同的",{"key":30,"text":49,"correct":22},"发包人无正当理由不按时返还工人工资保证金的",{"key":33,"text":51,"correct":22},"发包人不履行合同约定其他义务的","BCDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1106226,"工程变更一般可归纳为（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"因设计不合理而引起的工程变更",{"key":24,"text":60,"correct":22},"为优化设计方案而出现的工程变更",{"key":27,"text":62,"correct":35},"因承包人风险或监理人责任等原因而引起的工程变更",{"key":30,"text":64,"correct":22},"为满足地方政府的要求而不得不进行的工程变更",{"key":33,"text":66,"correct":22},"因承包人的施工质量事故而引起的工程变更","ABDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":79,"analysis":37},1106227,"索赔成立的基本条件包括（ ）。",[72,74,76,77,78],{"key":20,"text":73,"correct":22},"有明确的合同依据（或法律依据）",{"key":24,"text":75,"correct":35},"责任双方达成共识",{"key":27,"text":25,"correct":22},{"key":30,"text":28,"correct":22},{"key":33,"text":31,"correct":22},"ACDE",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":52,"analysis":37},1106228,"索赔的本质特征包括（ ）。",[84,86,88,90,92],{"key":20,"text":85,"correct":35},"承包人有部分过错",{"key":24,"text":87,"correct":22},"索赔是要求给予赔偿的权利主张",{"key":27,"text":89,"correct":22},"索赔的依据是合同文件及适用法律的规定",{"key":30,"text":91,"correct":22},"承包人自己没有过错",{"key":33,"text":93,"correct":22},"承包人已发生实际损失（时间或费用）",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":52,"analysis":37},1106229,"工程计量常用的表格包括（ ）。",[98,100,102,104,106],{"key":20,"text":99,"correct":35},"工程费用支出单",{"key":24,"text":101,"correct":22},"工程计量单",{"key":27,"text":103,"correct":22},"工程计量单附表",{"key":30,"text":105,"correct":22},"工程计量汇总表",{"key":33,"text":107,"correct":22},"计量资料审查确认表",{"id":109,"libraryId":5,"type":15,"typeLabel":16,"stem":110,"options":111,"answer":122,"analysis":37},1106230,"建设工程组织依次施工时，其特点包括（ ）。",[112,114,116,118,120],{"key":20,"text":113,"correct":22},"没有充分地利用工作面进行施工，工期长",{"key":24,"text":115,"correct":22},"如果按专业成立工作队，则各专业队不能连续作业",{"key":27,"text":117,"correct":35},"施工现场的组织管理工作比较复杂",{"key":30,"text":119,"correct":22},"单位时间内投入的资源量较少，有利于资源供应的组织",{"key":33,"text":121,"correct":35},"相邻两个专业工作队能够最大限度地搭接作业","ABD",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":137,"analysis":37},1106231,"公路工程组织流水作业时，用来表达流水施工在空间布置上开展状态的参数有（ ）。",[127,129,131,133,135],{"key":20,"text":128,"correct":35},"流水能力",{"key":24,"text":130,"correct":22},"工作面",{"key":27,"text":132,"correct":35},"施工过程",{"key":30,"text":134,"correct":22},"施工段",{"key":33,"text":136,"correct":35},"专业工作队数","BD",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":152,"analysis":37},1106232,"在组织流水作业时，确定流水节拍应考虑的因素有（ ）。",[142,144,146,148,150],{"key":20,"text":143,"correct":22},"所采用的施工方法和施工机械",{"key":24,"text":145,"correct":35},"相邻两个施工过程相继开始施工的最小间隔时间",{"key":27,"text":147,"correct":35},"施工段数目",{"key":30,"text":149,"correct":22},"在工作面允许的前提下投入的劳动量和机械台班数量",{"key":33,"text":151,"correct":22},"专业工作队的工作班次","ADE",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":167,"analysis":37},1106233,"下列关于全等节拍流水施工特点的说法中，正确的有（ ）。",[157,159,161,163,165],{"key":20,"text":158,"correct":22},"所有施工过程在各个施工段上的流水节拍均相等",{"key":24,"text":160,"correct":35},"相邻专业工作队之间的流水步距不尽相等",{"key":27,"text":162,"correct":22},"专业工作队的数量等于施工过程的数量",{"key":30,"text":164,"correct":22},"各施工段之间没有空闲时间",{"key":33,"text":166,"correct":35},"流水施工工期等于施工段数与流水节拍的乘积","ACD",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":36,"analysis":37},1106234,"单位、分部及分项工程施工中，按施工工艺的特点和施工组织的要求，可将施工过程进一步分解为（ ）。",[172,174,176,178,180],{"key":20,"text":173,"correct":22},"综合过程",{"key":24,"text":175,"correct":22},"操作过程",{"key":27,"text":177,"correct":22},"工序",{"key":30,"text":179,"correct":22},"操作",{"key":33,"text":128,"correct":35},{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":36,"analysis":37},1106235,"公路施工过程的组织原则（ ）。",[185,187,189,191,193],{"key":20,"text":186,"correct":22},"连续性",{"key":24,"text":188,"correct":22},"协调性",{"key":27,"text":190,"correct":22},"均衡性",{"key":30,"text":192,"correct":22},"经济性",{"key":33,"text":194,"correct":35},"安全性",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":36,"analysis":37},1106236,"施工组织的主要研究对象是， 施工过程中的时间问题、空间问题、资源问题、经济问题指的是（ ）。",[199,201,203,205,207],{"key":20,"text":200,"correct":22},"施工进度计划编制",{"key":24,"text":202,"correct":22},"组织管理机构及场地布置",{"key":27,"text":204,"correct":22},"劳动力、材料、机具设备等的供应",{"key":30,"text":206,"correct":22},"工程造价、工程成本控制及资金合理利用",{"key":33,"text":208,"correct":35},"尽力加快工程进度",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":67,"analysis":37},1106237,"S曲线在公路工程施工监理中的作用包括（ ）。",[213,215,217,219,221],{"key":20,"text":214,"correct":22},"审批施工进度计划时，可用S曲线判断施工单位编制的施工进度计划是否合理",{"key":24,"text":216,"correct":22},"监控施工进度计划实施阶段，进度控制可方便地利用S曲线评价实际进度情况",{"key":27,"text":218,"correct":35},"S曲线可用于判断某个时间点的经济效益",{"key":30,"text":220,"correct":22},"S曲线可用于工程费用监理中工程计量的依据",{"key":33,"text":222,"correct":22},"S曲线可用于工程费用监理中费用支付的依据",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":236,"analysis":37},1106238,"根据施工过程所需的劳动资料及其对产品所起的作用，将公路工程施工划分为（ ）。",[227,229,231,233,234],{"key":20,"text":228,"correct":22},"施工准备过程",{"key":24,"text":230,"correct":22},"主体工程施工过程",{"key":27,"text":232,"correct":22},"辅助工程及临时工程施工过程",{"key":30,"text":175,"correct":35},{"key":33,"text":235,"correct":22},"服务施工过程","ABCE",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":79,"analysis":37},1106239,"公路施工过程的组织原则包括（ ）。",[241,243,245,247,249],{"key":20,"text":242,"correct":22},"经济性原则",{"key":24,"text":244,"correct":35},"间断性原则",{"key":27,"text":246,"correct":22},"均衡性原则",{"key":30,"text":248,"correct":22},"协调性原则",{"key":33,"text":250,"correct":22},"连续性原则",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":236,"analysis":37},1106240,"横道图的不足表现有（ ）。",[255,257,259,261,263],{"key":20,"text":256,"correct":22},"不容易看出工作之间的相互依赖",{"key":24,"text":258,"correct":22},"无法反映工作的机动使用时间",{"key":27,"text":260,"correct":22},"不能实现定量分析",{"key":30,"text":262,"correct":35},"不能清楚了解工艺之间的逻辑关系",{"key":33,"text":264,"correct":22},"计算执行过程中实施计划偏离原计划时，只能进行局部简单的调整",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":36,"analysis":37},1106242,"流水施工组织原则包括（ ）。",[269,271,273,275,277],{"key":20,"text":270,"correct":22},"根据工程项目对象划分施工段",{"key":24,"text":272,"correct":22},"划分工序并编工艺流程，且按工艺原则建立专业班组",{"key":27,"text":274,"correct":22},"各专业班组依次、连续进入各个施工段，完成同类工种的作业",{"key":30,"text":276,"correct":22},"计算或确定流水作业参数",{"key":33,"text":278,"correct":35},"相邻施工段及相邻工序尽可能衔接宽松",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":293,"analysis":37},1106243,"流水作业参数包括（ ）。",[283,285,287,289,291],{"key":20,"text":284,"correct":22},"空间参数",{"key":24,"text":286,"correct":22},"工艺参数",{"key":27,"text":288,"correct":22},"时间参数",{"key":30,"text":290,"correct":35},"机械参数",{"key":33,"text":292,"correct":35},"进度参数","ABC",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":236,"analysis":37},1106244,"流水作业的特点包括（ ）。",[298,300,302,304,306],{"key":20,"text":299,"correct":22},"工期适中",{"key":24,"text":301,"correct":22},"工作面充分利用",{"key":27,"text":303,"correct":22},"专业队施工连续",{"key":30,"text":305,"correct":35},"大部分施工段上的工作面空闲",{"key":33,"text":307,"correct":22},"资源用量集中",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":321,"analysis":37},1106245,"施工过程的基本内容包括（ ）。",[312,314,316,317,319],{"key":20,"text":313,"correct":22},"劳动过程",{"key":24,"text":315,"correct":22},"自然过程",{"key":27,"text":175,"correct":35},{"key":30,"text":318,"correct":35},"检查过程",{"key":33,"text":320,"correct":35},"返工过程","AB",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":336,"analysis":37},1106246,"施工过程中进度计划一般包括（ ）三个阶段。",[326,328,330,332,334],{"key":20,"text":327,"correct":22},"编制计划",{"key":24,"text":329,"correct":35},"讨论计划",{"key":27,"text":331,"correct":22},"执行检查",{"key":30,"text":333,"correct":35},"方案定稿",{"key":33,"text":335,"correct":22},"调整计划","ACE",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":152,"analysis":37},1106247,"施工组织的基本方法包括（ ）。",[341,343,345,347,349],{"key":20,"text":342,"correct":22},"连续作业法",{"key":24,"text":344,"correct":35},"顺序作业法",{"key":27,"text":346,"correct":35},"间歇作业法",{"key":30,"text":348,"correct":22},"平行作业法",{"key":33,"text":350,"correct":22},"流水作业法",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":79,"analysis":37},1106248,"实行工程施工期进度监理的作用主要表现在（ ）。",[355,357,359,361,363],{"key":20,"text":356,"correct":22},"合理控制工期、质量和费用，使项目管理达到综合优化",{"key":24,"text":358,"correct":35},"通过审查施工进度报告及控制实际进度与计划进度差异情况，从而完善施工进度计划管理",{"key":27,"text":360,"correct":22},"除充分考虑时间控制问题外，同时还考虑劳动力、材料、机械设备、施工场地等所必需的资源问题，使其得到有效、合理、经济的配置与利用",{"key":30,"text":362,"correct":22},"保证施工期进度适合建设单位提供的资金、施工场地等条件",{"key":33,"text":364,"correct":22},"通过计划、组织、协调、检查与调整等手段，调动施工活动中的一切积极因素，努力实现施工过程中各个阶段的进度目标",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":379,"analysis":37},1106249,"网络计划方法的特点包括（ ）。",[369,371,373,375,377],{"key":20,"text":370,"correct":35},"可以清楚的了解到各种工艺的逻辑关系",{"key":24,"text":372,"correct":22},"能够充分反映各项工作之间的相互制约、相互依赖的关系",{"key":27,"text":374,"correct":22},"关键工作和非关键工作不能很好的区分",{"key":30,"text":376,"correct":22},"能够进行计划的优选比较，从而选择最佳方案",{"key":33,"text":378,"correct":35},"它是一个定义明确的数学模型，计算方便，且便于用计算机计算","BCD",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":236,"analysis":37},1106250,"以下属于计划工期依据资料的有（ ）。",[384,386,388,390,392],{"key":20,"text":385,"correct":22},"材料和设备的供应计划",{"key":24,"text":387,"correct":22},"已建成的同类工程或相似项目的实际工程进度情况",{"key":27,"text":389,"correct":22},"投标书中确定的项目施工方案及工程进度计划",{"key":30,"text":391,"correct":35},"施工单位的实际进度计划",{"key":33,"text":393,"correct":22},"施工单位的施工人员技术素质及其机具设备能力",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":293,"analysis":37},1106251,"单代号网络图的基本符号中“节点”表示（ ）。",[398,400,402,404,406],{"key":20,"text":399,"correct":22},"一项工作",{"key":24,"text":401,"correct":22},"工作名称",{"key":27,"text":403,"correct":22},"工作持续时间",{"key":30,"text":405,"correct":35},"紧邻工作之间的组织关系",{"key":33,"text":407,"correct":35},"紧邻工作之间的工艺关系",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":422,"analysis":37},1106252,"某工程双代号网络计划如下图所示，图中已标出每个节点的最早时间和最迟时间，该计划表明（ ）。",[412,414,416,418,420],{"key":20,"text":413,"correct":22},"工作1－3的最迟完成时间为8",{"key":24,"text":415,"correct":35},"工作4－7为关键工作",{"key":27,"text":417,"correct":35},"工作2－5的总时差为零",{"key":30,"text":419,"correct":35},"工作3－6的总时差为1",{"key":33,"text":421,"correct":22},"工作6－7的总时差为1","AE",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":437,"analysis":37},1106253,"某分部工程中各项工作间逻辑关系见下表，相应的双代号网络计划如下图所示，图中错误有（ ）。",[427,429,431,433,435],{"key":20,"text":428,"correct":35},"多个终点节点",{"key":24,"text":430,"correct":22},"多个起点节点",{"key":27,"text":432,"correct":35},"工作代号重复",{"key":30,"text":434,"correct":22},"不符合给定逻辑关系",{"key":33,"text":436,"correct":22},"节点编号有误","BDE",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":167,"analysis":37},1106254,"绘制双代号网络图时，符合节点编号的原则是（ ）。",[442,444,446,448,450],{"key":20,"text":443,"correct":22},"不应重复编号",{"key":24,"text":445,"correct":35},"可以随机编号",{"key":27,"text":447,"correct":22},"箭尾节点编号小于箭头节点编号",{"key":30,"text":449,"correct":22},"编号之间可以有间隔",{"key":33,"text":451,"correct":35},"虚工作的节点可以不编号",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":137,"analysis":37},1106255,"某分部工程双代号网络计划如下图所示，图中的错误有（ ）。",[456,457,458,459,460],{"key":20,"text":432,"correct":35},{"key":24,"text":436,"correct":22},{"key":27,"text":430,"correct":35},{"key":30,"text":428,"correct":22},{"key":33,"text":461,"correct":35},"存在循环回路",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":476,"analysis":37},1106256,"在下图所示的网络计划中，有关各项工作的总时差和自由时差的表述正确的是（ ）。",[466,468,470,472,474],{"key":20,"text":467,"correct":35},"工作A的自由时差为0，总时差为2",{"key":24,"text":469,"correct":35},"工作B的总时差和自由时差均为1",{"key":27,"text":471,"correct":22},"工作C的总时差和自由时差均为2",{"key":30,"text":473,"correct":22},"工作D的自由时差为0，总时差为1",{"key":33,"text":475,"correct":22},"工作E的自由时差和总时差均为0","CDE",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":52,"analysis":37},1106257,"按照时差的不同性质和作用。可以分为工作的（ ）。",[481,483,485,487,489],{"key":20,"text":482,"correct":35},"自由时差",{"key":24,"text":484,"correct":22},"总时差",{"key":27,"text":486,"correct":22},"局部时差",{"key":30,"text":488,"correct":22},"干涉时差",{"key":33,"text":490,"correct":22},"独立时差",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":336,"analysis":37},1106258,"单代号网络计划图绘制方法包括（ ）。",[495,497,499,501,503],{"key":20,"text":496,"correct":22},"前进法",{"key":24,"text":498,"correct":35},"精细法",{"key":27,"text":500,"correct":22},"后退法",{"key":30,"text":502,"correct":35},"先节点后箭线",{"key":33,"text":504,"correct":22},"先粗后细法",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":52,"analysis":37},1106259,"关于单代号网络图特点的说法，正确的有（ ）。",[509,511,513,515,517],{"key":20,"text":510,"correct":35},"单代号网络图的绘制方法比较复杂",{"key":24,"text":512,"correct":22},"各项工作的相互关系容易表达",{"key":27,"text":514,"correct":22},"不存在虚工作",{"key":30,"text":516,"correct":22},"便于检查",{"key":33,"text":518,"correct":22},"便于修改",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":529,"analysis":37},1106260,"某单位工程双代号网络计划如图10-1-2所示，图中错误有（ ）。",[523,524,525,527,528],{"key":20,"text":430,"correct":22},{"key":24,"text":428,"correct":35},{"key":27,"text":526,"correct":35},"存在多余虚工作",{"key":30,"text":436,"correct":22},{"key":33,"text":461,"correct":35},"AD",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":152,"analysis":37},1106261,"某分部工程双代号网络图如图10-2-4所示，图中错误有（ ）。",[534,535,536,537,538],{"key":20,"text":428,"correct":22},{"key":24,"text":430,"correct":35},{"key":27,"text":432,"correct":35},{"key":30,"text":436,"correct":22},{"key":33,"text":461,"correct":22},{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":336,"analysis":37},1106262,"某工程双代号时标网络计划如图10-2-3所示，该计划表明（ ）。",[543,545,547,549,551],{"key":20,"text":544,"correct":22},"G工作为关键工作",{"key":24,"text":546,"correct":35},"E工作的总时差为3天",{"key":27,"text":548,"correct":22},"B工作的总时差为1天",{"key":30,"text":550,"correct":35},"F工作为关键工作",{"key":33,"text":552,"correct":22},"C工作的总时差为2天",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":567,"analysis":37},1106263,"某工程双代号时标网络计划如图10-3-2所示，该计划表明（ ）。",[557,559,561,563,565],{"key":20,"text":558,"correct":22},"工作C的自由时差为2天",{"key":24,"text":560,"correct":35},"工作E的最早开始时间为第4天",{"key":27,"text":562,"correct":22},"工作D为关键工作",{"key":30,"text":564,"correct":35},"工作H的总时差为零",{"key":33,"text":566,"correct":35},"工作B的最迟完成时间为第1天","AC",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":582,"analysis":37},1106264,"某工程双代号时标网络计划执行到第6周末和第11周末时，检查其实际进度如图10-3-3前锋线所示，检查结果表明（ ）。",[572,574,576,578,580],{"key":20,"text":573,"correct":35},"第6周末检查时，工作A拖后1周，不影响总工期",{"key":24,"text":575,"correct":35},"第6周末检查时，工作E提前1周，不影响总工期",{"key":27,"text":577,"correct":35},"第6周末检查时，工作C提前1周，预计总工期缩短1周",{"key":30,"text":579,"correct":22},"第11周末检查时，工作G拖后1周，不影响总工期",{"key":33,"text":581,"correct":22},"第11周末检查时，工作H提前1周，预计总工期缩短1周","DE",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":122,"analysis":37},1106265,"某工程双代号网络计划如图10-2-2所示，图中已标明每项工作的最早开始时间和最迟开始时间，该计划表明（ ）。",[587,589,591,593,595],{"key":20,"text":588,"correct":22},"工作1-3的自由时差为2",{"key":24,"text":590,"correct":22},"工作2-5为关键工作",{"key":27,"text":592,"correct":35},"工作2-4的自由时差为1",{"key":30,"text":594,"correct":22},"工作3-6的总时差为零",{"key":33,"text":596,"correct":35},"工作4-7为关键工作",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":379,"analysis":37},1106266,"某工程双代号网络计划中各节点的最早时间与最迟时间如图10-2-5所示，图中表明（ ）。",[601,603,604,606,608],{"key":20,"text":602,"correct":35},"工作1-4为关键工作",{"key":24,"text":596,"correct":22},{"key":27,"text":605,"correct":22},"工作1-3的自由时差为0",{"key":30,"text":607,"correct":22},"工作3-7的总时差为3",{"key":33,"text":609,"correct":35},"关键线路有3条",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":122,"analysis":37},1106267,"时间坐标网络计划图的绘制方法有（ ）。",[614,616,618,620,622],{"key":20,"text":615,"correct":22},"按节点最早可能实现时间",{"key":24,"text":617,"correct":22},"按节点最迟必须实现时间",{"key":27,"text":619,"correct":35},"按工作最早结束时间",{"key":30,"text":621,"correct":22},"按优化时间",{"key":33,"text":623,"correct":35},"按工作最迟结束时间",{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":626,"options":627,"answer":36,"analysis":37},1106268,"通常的工作关系表的基本内容包括（ ）。",[628,630,631,633,635],{"key":20,"text":629,"correct":22},"工作代号",{"key":24,"text":401,"correct":22},{"key":27,"text":632,"correct":22},"紧前工作",{"key":30,"text":634,"correct":22},"持续时间",{"key":33,"text":636,"correct":35},"延迟时间",{"id":638,"libraryId":5,"type":15,"typeLabel":16,"stem":639,"options":640,"answer":293,"analysis":37},1106269,"网络计划图时间参数的计算可以达到（ ）。",[641,643,645,647,649],{"key":20,"text":642,"correct":22},"确定完成整个计划的总工期",{"key":24,"text":644,"correct":22},"确定各工作的最迟必须开始时间和最迟必须完成时间",{"key":27,"text":646,"correct":22},"是绘制时标网络计划图的基础",{"key":30,"text":648,"correct":35},"控制整个施工质量",{"key":33,"text":650,"correct":35},"协调施工人员",{"id":652,"libraryId":5,"type":15,"typeLabel":16,"stem":653,"options":654,"answer":665,"analysis":37},1106270,"网络图中交叉箭线的表示方法有（ ）。",[655,657,659,661,663],{"key":20,"text":656,"correct":35},"交叉法",{"key":24,"text":658,"correct":22},"过桥法",{"key":27,"text":660,"correct":35},"回避法",{"key":30,"text":662,"correct":35},"避免法",{"key":33,"text":664,"correct":22},"指向法","BE",{"id":667,"libraryId":5,"type":15,"typeLabel":16,"stem":668,"options":669,"answer":67,"analysis":37},1106271,"以下属于控制性时间参数的有（ ）。",[670,672,674,676,678],{"key":20,"text":671,"correct":22},"ES",{"key":24,"text":673,"correct":22},"LS",{"key":27,"text":675,"correct":35},"TF",{"key":30,"text":677,"correct":22},"LT",{"key":33,"text":679,"correct":22},"ET",{"id":681,"libraryId":5,"type":15,"typeLabel":16,"stem":682,"options":683,"answer":293,"analysis":37},1106272,"以下属于时间坐标网络计划图特点的有（ ）。",[684,686,688,690,692],{"key":20,"text":685,"correct":22},"能直观地反映出整个网络计划的时间进程",{"key":24,"text":687,"correct":22},"能直接反映出各项工作的开始和完成时间",{"key":27,"text":689,"correct":22},"可以随时检查出哪些工作已经完成，哪些工作正在进行及哪些工作将要开始",{"key":30,"text":691,"correct":35},"可以快速进行资源调整",{"key":33,"text":693,"correct":35},"时标网络计划的调整比较简单",{"id":695,"libraryId":5,"type":15,"typeLabel":16,"stem":696,"options":697,"answer":36,"analysis":37},1106273,"在网络图中，严禁出现（ ）。",[698,700,702,704,706],{"key":20,"text":699,"correct":22},"循环回路",{"key":24,"text":701,"correct":22},"无箭头的连线",{"key":27,"text":703,"correct":22},"在箭线上引入或引出箭线",{"key":30,"text":705,"correct":22},"没有箭尾节点的箭线",{"key":33,"text":707,"correct":35},"交叉箭线",{"id":709,"libraryId":5,"type":15,"typeLabel":16,"stem":710,"options":711,"answer":293,"analysis":37},1106274,"网络计划优化，是在既定条件下，对初步拟定的网络计划方案，利用时差不断调整和改善，使之达到（ ）。",[712,714,716,718,720],{"key":20,"text":713,"correct":22},"工期最短",{"key":24,"text":715,"correct":22},"成本最低",{"key":27,"text":717,"correct":22},"资源最优",{"key":30,"text":719,"correct":35},"安全第一",{"key":33,"text":721,"correct":35},"节能环保",[723,727,730,733,736,739],{"id":724,"name":725,"category":7,"favorite":726},1,"领导干部任职前廉政法规知识测试题",92,{"id":728,"name":729,"category":7,"favorite":724},595,"建筑结构与设备",{"id":731,"name":732,"category":7,"favorite":724},715,"招标采购专业知识与法律法规",{"id":734,"name":735,"category":7,"favorite":724},848,"市政方向-通用基础",{"id":737,"name":738,"category":7,"favorite":8},534,"BIM工程师",{"id":740,"name":738,"category":7,"favorite":8},535]