[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106373":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1106373,781,2,"多选题","以下关于水土保持方案，正确的有（ ） A.建设项目水土保持方案文件分为水土保持方案报告书和水土保护方案报告表。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","凡征占地面积在即10000m2以上，应当编报水土保持方案报告书",true,{"key":16,"text":17,"correct":14},"B","挖填土石方总量在10000m3以上的开发建设项目，应当编报水土保持方案报告书",{"key":19,"text":20,"correct":14},"C","除",{"key":22,"text":23,"correct":14},"D","C外，其他开发建设项目应当编报水土保持方案报告表。",{"key":25,"text":26,"correct":27},"E","公路建设项目应编制水土保护方案报告表书。",false,"ABCD","本题考查的是公路建设水土保持。建设项目水土保持方案文件分为水土保持方案报告书和水土保护方案报告表。凡征占地面积在lhm 2（即10000m 2）以上或者挖填土石方总量在10000m 3以上的开发建设项目，应当编报水土保持方案报告书；其他开发建设项目应当编报水土保持方案报告表。根据《中华人民共和国水土保持法》，公路建设项目应编制水土保持方案报告书。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（交通工程）","建筑工程",0]