[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1106246":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1106246,781,2,"多选题","施工过程中进度计划一般包括（ ）三个阶段。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","编制计划",true,{"key":16,"text":17,"correct":18},"B","讨论计划",false,{"key":20,"text":21,"correct":14},"C","执行检查",{"key":23,"text":24,"correct":18},"D","方案定稿",{"key":26,"text":27,"correct":14},"E","调整计划","ACE","施工过程中进度计划一般包括三个阶段，即编制计划、执行检查、调整计划；各个阶段进度控制的目标分别为：计划工期、偏差情况、调整内容。",{"id":6,"name":31,"category":32,"favorite":33},"目标控制（交通工程）","建筑工程",0]